• Title/Summary/Keyword: project performance

Search Result 2,749, Processing Time 0.033 seconds

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Performance Analysis on Income Generation Works in Comprehensive Rural Village Development Project by Their Implementation (농촌마을종합개발사업의 공동소득사업 성과분석)

  • Yang, Won-Sik;Choi, Soo-Myung
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.1
    • /
    • pp.55-70
    • /
    • 2013
  • Since 2004, Ministry for Food, Agriculture, Forestry and Fisheries(MIFAFF) has been carrying out comprehensive rural village development project as the core one of Rural Area Development Schemes in Korea. Up to now, 56 projects had been completed after having with 5-year plan implementation period, on which it is possible to try post-project evaluation works. This study aims to propose a rational income-generation works model of comprehensive rural village development project, based on fulfillment checking results of their statutory stepwise working procedures specified in the project guidelines and their interim/post project performance analysis results in 56 project areas above mentioned. In comprehensive rural village development project, income-generation works generally have both quantitative and qualitative effects to rural communities; the former is focussed on income increasement of villagers, while the latter on community revitalization through job creation and spill-over effects of other linked community activities. So, the research works of this study focussed on these two comprehensive effects above mentioned.

An Evaluation Study on the School Library Revitalization Project (학교도서관 활성화 사업에 대한 인식 및 효과성 측정연구)

  • Noh, Young-Hee;Kwon, Jae-Hyun
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.41 no.2
    • /
    • pp.81-110
    • /
    • 2007
  • This study aims to identify challenges faced by the schools participating in the 2006 School Library Revitalization Project so as to incorporate them in the next year's plan, which is the last year of the phase one of the project, as well as in designing the phase two. By doing so, it seeks to contribute to enhancing effectiveness of the School Library Revitalization Project conducted by the Ministry of Education and Human Resources Development(MOEHRD), the Republic of Korea. The second segment of the research consists of the pub)ic survey in 1,281 project schools(2005) and 1,098 project schools(2006) to assess overall performance of the project. The target group is divided into five categories of school inspectors, principals, teachers, school librarians, and students.

Effect of Supplementing Organic Selenium on Performance, Carcass Traits, Oxidative Parameters and Immune Responses in Commercial Broiler Chickens

  • Rao, Savaram Venkata Rama;Prakash, Bhukya;Raju, Mantena Venkata Laxmi Narasimha;Panda, Arun Kumar;Poonam, Saharia;Murthy, Orugonda Krishna
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.26 no.2
    • /
    • pp.247-252
    • /
    • 2013
  • An experiment was conducted to determine the effect of supplementing various concentrations (0, 100, 200, 300, or 400 ${\mu}g/kg$ diet) of organic Se on growth performance, carcass traits, oxidative stress, and immune responses in commercial broiler chickens reared in open-sided poultry house under tropical climatic conditions. Each diet was fed ad libitum to eight replicates consisting of six birds in each pen from 1 to 42 d of age. Body weight gain and feed efficiency, and relative weight of liver, abdominal fat and ready to cook yields were not affected (p>0.05) by organic Se supplementation to broiler diets. Lipid peroxidation in plasma decreased, while activities of glutathione peroxidase and glutathione reductase in plasma increased (p<0.01) linearly with Se concentration in diet. The ratios between heterophyls and lymphocytes and relative weight of lymphoid organs (bursa, spleen, and thymus), and antibody production to Newcastle disease vaccination were not affected (p>0.05) by Se supplementation to broiler diets. However, the cell-mediated immunity (lymphocyte proliferation ratio) increased (p<0.01) linearly with dietary Se concentration. The results of the present study indicate that the supplementation of Se did not influence body weight and feed efficiency. However, supplementation of Se increased antioxidant status and lymphocyte proliferation in broiler chickens.

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

Risk Management for R&D Projects in the Military Aircraft Systems (군용항공기 연구개발 사업의 리스크 관리)

  • Kim, Sung Hun;Lee, Hyun Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

Role of Project Owner in OSS Project: Based on Impression Formation and Social Capital Theory (오픈소스 소프트웨어 운영자 역할이 성과에 미치는 영향: 인상형성과 사회적 자본 이론을 중심으로)

  • Lee, Saerom;Baek, Hyunmi;Jahng, Jungjoo
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.2
    • /
    • pp.23-46
    • /
    • 2016
  • With the increasing socio-economic value of an open collaboration over the Internet, it has become significantly important to successfully manage open source software development program. Most of the previous research have focused on various factors that influence the performance of the project, but studies on how the project owners recognized as "leader" affect the outcome of the project are very limited. This research investigates how individual and governance characteristics of an owner influences the performance of project based on impression formation and social capital theory. For a data set, we collect 611 Repositories and the owner's data from the open source development platform Github, and we form knowledge sharing network of an each repository by using social network analysis. We use hierarchical regression analysis, and our results show that a leader, who exposes a lot of one's personal information or who has actively followed and showed interests to communicate with other developers, affects positive impacts on project performance. A leader who has a high centrality in knowledge sharing network also positively affects on project performance. On the other hand, if a leader was highly willing to accept external knowledge or is recognized as an expert in the community with large numbers of followers, the result show negative impacts on project performance. The research may serve as a useful guideline not only for the future open source software projects but also for the effective management of different types of open collaboration.