Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking (분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법)

  • Cho Kyu-Kab;Moon Byung-Keun
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

Development of Project Success Model in Enterprise Using FCM (FCM을 이용한 기업프로젝트의 성공 모델 개발)

  • Park, Young-Man;Hwang, Seung-Gook;Park, Kwang-Bak;Lee, Young-Joo
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.20 no.1
    • /
    • pp.123-128
    • /
    • 2010
  • To increase the chance of the success of project, it is necessary to identify the important factors influencing the performance of project. Cognitive map has been used for analysing by investigating causal links among relevant factors. A fuzzy cognitive map (FCM) is an extension of a cognitive map with the additional capability of representing feedback through weighted causal links. Project performance is influenced by several factors such as input resources, possibility of achievement, concern of others and so on. The object of this paper is to develop the project success model of enterprise using a fuzzy cognitive map approach to investigate the degree of causal relationship between project performance and these factors.

An Exploratory Study for the Development Plan of the National Defense Experiment Project Conducted by the Navy (해군에서 수행하는 국방 실험사업 발전방안을 위한 탐색적 연구)

  • Woo, Dongsung;Lee, Boram;Ryu, Jaehak;Kim, Dongho
    • Journal of Information Technology Services
    • /
    • v.20 no.6
    • /
    • pp.151-162
    • /
    • 2021
  • Since 2012, the Navy has been conducting a defense experiment project to evaluate the possibility of military application by introducing new technologies related to excellent private informatization in the defense field. There are many projects that have spread because they are suitable for military use, but some have ended as experimental projects themselves because they do not meet the military's required performance. Continuous development is required as increasing the spread rate by successfully carrying out defense experiment projects is the basis for defense reform. This study analyzed the performance of major projects carried out by the Navy and presented considerations for the development of defense experiment projects to be carried out by the Navy in the future. The main achievements were derived in various ways in terms of project performance and system operation, and the considerations can be summarized in the field of raising business requirements, securing resources for system operation, determining the size of companies for project execution, and security measures. The research results can be used as data to determine the required defense experiment project and efficiently carry out the project.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.