A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Determinants of Access to Green Finance in Vietnam: An Empirical Research

  • LE, Lam Hai;PHAM, Anh Hoang Thi
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.9
    • /
    • pp.79-89
    • /
    • 2021
  • Green finance plays an important role in environmental protection missions and fighting climate change. The Environment Fund in Vietnam is the main channel of preferential capital offered to firms for environmental protection. Unfortunately, it was previously unknown which criteria influenced these companies' ability to obtain green financing. Using a survey method, we collected data through a structured questionnaire of 203 respondents that represent firms that had received concessional loans from 26 Environment Funds. A Multiple Linear Regression model was used to examine the determinants of access to concessional loans for environmental protection. We found relationships between age, size, ownership type, and industry sector, and access to green finance. Third-party guarantees were a significant factor in financing through Environment Funds. Moreover, we found commercial environmental projects face fewer green financing obstacles. Surprisingly, showing audited financial statements does not mitigate the information asymmetry between firms and these financial institutions. These findings suggest that Environment Funds should classify environmental project types to develop appropriate lending policies. In emerging markets, enterprises need to build a trusted relationship with financial institutions so that they can replace asset-based lending techniques, thereby increasing the firms' accessibility to green finance.

Influences of Energy Production Estimation Errors on Project Feasibility Indicators of a Wind Project and Critical Factor Analysis by AHP (풍력발전사업 에너지생산량 산정 오차가 사업성지표에 미치는 영향 및 AHP를 이용한 중요인자 분석)

  • Kim, Youngkyung;Chang, Byungman
    • Korean Management Science Review
    • /
    • v.30 no.2
    • /
    • pp.1-10
    • /
    • 2013
  • Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Financing of Healthcare Facilities in Pension System Assets of Ecologically Problematic Regions in Kazakhstan

  • YESSENTAY, Aigerim;KIREYEVA, Anel A.;KHALITOVA, Madina;ABILKAYIR, Nazerke A.
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.7
    • /
    • pp.531-541
    • /
    • 2020
  • The purpose of the study is a theoretical and practical justification for building a mechanism for financing health facilities based on public-private partnerships from a pension fund in regions with environmental problems. The theoretical background is built on works of local and foreign authors on state and non-state pension provisions issues, pension funds' assets management. This study provides an analysis of the health status of the population of the Kyzylorda region; it analyzes also the worldwide and Kazakhstan practice of investing pension funds and implementing projects. There has been legislative and methodological framework for financing health projects based on public-private partnerships in Kazakhstan. The scientific methods considered in this study made it possible to develop a mechanism for financial support for the modernization of a healthcare facility using the budget of pension funds. The authors point out possible risks in the implementation of projects in the field of healthcare and make recommendations on the construction a mechanism for financing healthcare facilities in the regions of Kazakhstan with environmental problems. In addition, they underline the key insights of the analysis, which are requisites for identifying the profitability of project for business and social effects for the public. Factors influencing efficacy, effect and implementation risks identified.

A Study on the Mutual Credit Work of Fisheries Cooperatives in Korea (수산업협동조합의 상호금융사업에 관한 고찰)

  • 오환종
    • The Journal of Fisheries Business Administration
    • /
    • v.16 no.1
    • /
    • pp.31-54
    • /
    • 1985
  • The mutual credit of Fisheries Cooperatives is reciprocal financing bring overs and shorts to settlement themselves by filling each other's needs among feeble fishermen economically. The spread of mutual credit through Fisheries Cooperatives reduces private loan dependence and private loan interest rate at fishery village, and that fills up policy financing being restricted by working scale. And seeing movement side of Fisheries Cooperatives, it has done an under board to settle self-supporting foundation of primary fisheries cooperatives early. The mutual credit deposit shows about 53 times increase past an interval of a ten years. This increase rate is an epoch-making record being unparalleled in other banking facilities except Fisheries Cooperatives. Then being unparalleled increase rate, time and savings deposits increase has been contributed a great deal than demand deposits. Thinking important function factors as mutual credit growth, we can classify interior and exterior factors. The exterior factor is income of fishery household in some measure, interior factors are the high deposits interest rate and the enlargement of facilities organization. As these, they have been in a better factors, also have been a restriction factors. The restriction factors are conflict cancellation between mutual credit and them bring into existence a village vault, mutual savings and finance companies, private finance. For the sake of continuance growth rate in mutual credit as past, we should eliminate restricted factors in growth. On the other hand the better factors in growth should be act upon affirmation side continually. Consequently under circumstances not to an amicable settlement bring the fisheries fund demand as policy financing, we should do continuous and sound development of fisheries financing by means of putting in good order of fisheries cooperatives mutual credit. Surveying a problem from these viewpoints, when we study more deep and a full into a subject about growth project of mutual credit, we think to expect continuous growth in mutual credit of Fisheries Cooperatives.

  • PDF

A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies - (공동주택 PF사업 참여 의사결정을 위한 자기자본 투입 시점/규모 예측방법론 - 중견 건설사의 관점에서-)

  • Yoo, Jinhyuk;Cha, Heesung;Shin, Dongwoo;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.21-30
    • /
    • 2016
  • The current PF project is entirely relying on construction company's credibility. As such, it has increased a negative and bad recognition in domestic real estate economy. In addition, PF experts has a perception that a project's safety of future cash flow profitability is more important than the construction company's credibility. So many PF experts make an effort in order to set aside safe project structure of PF and analyse systematically the risks of the project. In common feasibility study of the PF Project, financial specialists and real estate specialists are forecasting and evaluating the suitability of the project through reviewing the development profit from the project of sales. However, cash flow analysis and evaluation from the perspective of mid-sized construction companies are still in the primary level. Therefore, this study has analysed the current feasibility study and go/no go decision making procedures. Then the authors have a new cash flow analysis method from the perspective of mid-sized construction companies, by improving the feasibility study and go/no go decision making procedures.

The Improving Direction of Korean Eco-Industrial Park Construction Project (한국 생태산업단지 구축사업의 개선방향)

  • Kong, Hyung-Ok;Ko, Jae-Cheol
    • Journal of the Korean Applied Science and Technology
    • /
    • v.28 no.4
    • /
    • pp.418-430
    • /
    • 2011
  • This study was conducted to provide an improving direction of K-EIP(Korean Eco-Industrial Park) construction project by company's voluntary participation. For this purpose, we investigated and analyzed the status of domestic eco-industrial park projects from various literatures, foreign EIP cases and FGI(Focus Group Interview). The key issues to construct a voluntary K-EIP are the lack of experts, the difficulties of commercialization financing, and so on. In this study, therefore, the programs to resolve these problems in K-EIP construction project were suggested at the level of government and corporation.