• Title/Summary/Keyword: project effectiveness

Search Result 855, Processing Time 0.023 seconds

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Implementation Status of TPMS in GS E&C's Overseas Projects (GS건설 해외 Project의 TPMS 적용 현황)

  • Lee, Jun-Bok;Park, Chan-Jeong;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • GS E&C applies TPMS(Total Project Management System) to all construction projects. This system is applied to all overseas projects, it is successfully used not only GS E&C but also subcontractors, vendors and clients. TPMS collects data spontaneously that is used to each participant, improves effectiveness in construction projects and gives transparency to all participants while sharing same information. This paper is aimed to share successful case study focusing on document management system, and how to develop TPMS in the future.

  • PDF

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Improving Outsourced ISD Project Performance : Focusing on Conflict and Conflict Resolution Facilitation (아웃소싱을 통한 정보시스템 개발성과 향상방안 : 갈등 및 갈등해결 촉진을 중심으로)

  • Cho, Dong-Hwan;Lee, Ho-Geun;Lee, Choong-Cheong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.1
    • /
    • pp.71-105
    • /
    • 2008
  • Various stakeholders within and outside of the organization are involved and participate in the outsourced IS development. As their interests and goals are different conflict arises in the process of their interaction, and it is an important factor affecting outsourcing success. The study focuses on the conflict between client users and vendor, i.e. main conflict in the outsourcing project, and examines the relationship of conflict with project success, the antecedents of conflict, and investigates the effectiveness of conflict resolution facilitation. An integrated conceptual model is developed grounded on is outsourcing, IS development, project management, and organizational behavior literature. Nine specific hypotheses on the conflict in outsourcing projects are proposed, and data collection and analysis are performed with 214 ISD outsourcing projects. Results indicated that the conflict between client users and vendor in outsourcing projects was found to have negative effects on project success. Main causes affecting conflict were examined, and relative influences of these causes were clarified. Recently internal IT personnel have been faced their role change with the increase of outsourcing, and the importance of their conflict resolution facilitation was highlighted.

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

Analysis for the Policy Making Process of G7 Project in 1990s (선도기술개발사업(G7)의 정책결정 과정 분석: 범부처간 추진 과정 및 민간 전문가 역할을 중심으로)

  • Lee, Chan-Gu
    • Journal of Technology Innovation
    • /
    • v.16 no.2
    • /
    • pp.167-200
    • /
    • 2008
  • This work firstly aims to analyse how the policy makers had been able to sort out the two policy issues, 'how did the MOST establish the inter-departmental project' and 'why did the MOST give a legal power to the private experts', in the process of policy making for Highly Advanced National(HAN) project, called G7 Project, which had been implemented for 10 years in 1990s. Then, this will discuss the policy implications available to the similar policy areas in the future. The result shows that the agenda setting of the G7 Project, one of the successful national R&D projects in Korea, had been initiated by a few leaders who had have the perspective of pioneer. In addition, this explains that private experts had more played than civil servant did in the process of policy formation, which had been backed up by the R&D plannin4g system then introduced in R&D management process for the frist time. This case study will provide policy makers with the opportunities to remind 'the necessities of the policy management by the system not actors', 'more effective management of distribution policy' and 'the better role of related experts in the policy making process'. Also, above issues will make both the practitioners and the researchers again consider how to improve the rationality and effectiveness of the policy making process in the field of science and technology.

  • PDF

A Study Assessing 2018 Gyenggi-do Korean medicine Support Project for Subfertility (2018년도 경기도 한의 난임 지원 사업 진료 결과 분석 연구)

  • Choi, Su-Ji;Kim, Dong-Il;Park, Jang-Kyung;Lee, Mi-Young
    • The Journal of Korean Medicine
    • /
    • v.40 no.3
    • /
    • pp.76-86
    • /
    • 2019
  • Objectives: This study aims to assess the Gyenggi-do support project of Korean medical treatment in subfertility in 2018. And we would like to propose a plan to improve the project by analyzing the results of the project. Methods: We got the medical records of 260 participants that personal information was deleted by the association of Korean Medicine in Gyenggi-do. We collected the participants' characteristics, treatment records, results of treatment, laboratory results and satisfaction survey results. We coded the data and analyzed them using SPSS 23 at 5% significance level. Results: After the treatment, 11.0% of participants became pregnant spontaneously. There was no significant change in blood test before and after the treatment and observation period, and there was no adverse event during the project. After the project, the satisfaction survey was conducted. 84.2% of participants answered that they were satisfied with the result of the treatment. Conclusions: We analyzed the results of Gyenggi-do support project of Korean medical treatment for infertile women in 2017 and 2018. This study suggests the effectiveness and safety of Korean medical treatment for infertile women.

A Study on the Quality Control Effectiveness in the High-rise residential-commercial Complex Building Project (초고층 주상복합건물의 품질관리 효율성에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.4
    • /
    • pp.79-87
    • /
    • 2007
  • The object of this study is to understand of the effectiveness characteristic in the field work which is controlled by the quality in the high-rise residential-commercial complex building. From the previous study, the quality improvement factors are investigated. Through the structured questionnaire, the opinions of the field engineers(University, Design firms, Construction company) are gathered in the improvement factors of construction phase. Comparing the results of questionnaire with the conception of field engineers, this study helps in revising and improving the quality control system including tangible factors and intangible factors in the frame work of the high-rise residential-commercial complex building project.

  • PDF