• Title/Summary/Keyword: project cost

Search Result 2,415, Processing Time 0.036 seconds

Building up User-Oriented Road Planning and Design Schemes (국민참여형 도로계획의 수립방향)

  • Kim, Eung-Cheol;Kwon, Young-In;Yun, Seong-Soon;Kang, Jin-Goo
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.47-55
    • /
    • 2005
  • Roads deeply affect the life of people and keep doing an important role to support economic growth of a country. According to the budget plan of the ministry of construction and transportation of Korea, 8.1 trillion won have been allotted for road investment in the year of 2002 which occupy 61% of the transportation infrastructure special account (13.3 trillion won) and 4.7% of the total national budget (1,740 trillion won). It is true that services generated from road investment such as mobility enhancement and increased accessibility have shown positive effects through shortened travel time and decreased vehicle operating cost. However, it is also notable that many negative effects are gradually being discussed and those are nowadays getting severer due to enhanced people interests about road construction, increased concerns on environment and active public involvement that were evoked by traffic accidents, air pollution & noise and destruction of environment. Road construction processes in Korea are normally governed by administrative sectors (suppliers) not by users. These processes ate very weak to accomodate user s needs and community concerns thus easy to fail finalizing a road project without hassles. A public hearing process is supposed to be held in the processes of detailed design step and the environmental impact analysis. However, it is not enough to grab user's needs and community concerns. Increased public involvement frequencies, optimized public involvement timing and enhanced depth of public involvement magnitude are suggested to improve the current poor public involvement schemes in road planning and design processes. The application of these recommended methods to the road planning and design processes may guarantee the change from the current supplier-oriented schemes to the new user-oriented one. Also, this study suggests to reset objectivity and clarity of road construction process, to make conciliation guidelines based on many practical cases that produced good results, to introduce public involvement techniques in a stepwise basis, and to foster the professionals via education and training programs.

Geoscientific land management planning in salt-affected areas* (염기화된 지역에서의 지구과학적 토지 관리 계획)

  • Abbott, Simon;Chadwick, David;Street, Greg
    • Geophysics and Geophysical Exploration
    • /
    • v.10 no.1
    • /
    • pp.98-109
    • /
    • 2007
  • Over the last twenty years, farmers in Western Australia have begun to change land management practices to minimise the effects of salinity to agricultural land. A farm plan is often used as a guide to implement changes. Most plans are based on minimal data and an understanding of only surface water flow. Thus farm plans do not effectively address the processes that lead to land salinisation. A project at Broomehill in the south-west of Western Australia applied an approach using a large suite of geospatial data that measured surface and subsurface characteristics of the regolith. In addition, other data were acquired, such as information about the climate and the agricultural history. Fundamental to the approach was the collection of airborne geophysical data over the study area. This included radiometric data reflecting soils, magnetic data reflecting bedrock geology, and SALTMAP electromagnetic data reflecting regolith thickness and conductivity. When interpreted, these datasets added paddock-scale information of geology and hydrogeology to the other datasets, in order to make on-farm and in-paddock decisions relating directly to the mechanisms driving the salinising process. The location and design of surface-water management structures such as grade banks and seepage interceptor banks was significantly influenced by the information derived from the airborne geophysical data. To evaluate the effectiveness ofthis planning., one whole-farm plan has been monitored by the Department of Agriculture and the farmer since 1996. The implemented plan shows a positive cost-benefit ratio, and the farm is now in the top 5% of farms in its regional productivity benchmarking group. The main influence of the airborne geophysical data on the farm plan was on the location of earthworks and revegetation proposals. There had to be a hydrological or hydrogeological justification, based on the site-specific data, for any infrastructure proposal. This approach reduced the spatial density of proposed works compared to other farm plans not guided by site-specific hydrogeological information.

Development of Optimum Traffic Safety Evaluation Model Using the Back-Propagation Algorithm (역전파 알고리즘을 이용한 최적의 교통안전 평가 모형개발)

  • Kim, Joong-Hyo;Kwon, Sung-Dae;Hong, Jeong-Pyo;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.679-690
    • /
    • 2015
  • The need to remove the cause of traffic accidents by improving the engineering system for a vehicle and the road in order to minimize the accident hazard. This is likely to cause traffic accident continue to take a large and significant social cost and time to improve the reliability and efficiency of this generally poor road, thereby generating a lot of damage to the national traffic accident caused by improper environmental factors. In order to minimize damage from traffic accidents, the cause of accidents must be eliminated through technological improvements of vehicles and road systems. Generally, it is highly probable that traffic accident occurs more often on roads that lack safety measures, and can only be improved with tremendous time and costs. In particular, traffic accidents at intersections are on the rise due to inappropriate environmental factors, and are causing great losses for the nation as a whole. This study aims to present safety countermeasures against the cause of accidents by developing an intersection Traffic safety evaluation model. It will also diagnose vulnerable traffic points through BPA (Back -propagation algorithm) among artificial neural networks recently investigated in the area of artificial intelligence. Furthermore, it aims to pursue a more efficient traffic safety improvement project in terms of operating signalized intersections and establishing traffic safety policies. As a result of conducting this study, the mean square error approximate between the predicted values and actual measured values of traffic accidents derived from the BPA is estimated to be 3.89. It appeared that the BPA appeared to have excellent traffic safety evaluating abilities compared to the multiple regression model. In other words, The BPA can be effectively utilized in diagnosing and practical establishing transportation policy in the safety of actual signalized intersections.

A Study on the animation music video production for the viral marketing purposes A case study of project (바이럴 마케팅용 애니메이션 뮤직비디오 제작 연구 : 월드컵 응원가 <일어나라 대한민국> 사례를 중심으로)

  • Han, Sang-Gyun;Kim, Tak-Hoon;Kim, Yu-Mi
    • Cartoon and Animation Studies
    • /
    • s.22
    • /
    • pp.47-63
    • /
    • 2011
  • Recently, contemporary cultural contents have been shown its diversity changes followed by the birth of new media platforms with consumers' new needs in the global market. Also, developments of Internet and computer system networks are the main contributors of making this changes happened rapidly. This study aims to know that how to usefully use those new media platforms through the great example of stop-motion animation music video by analyzing its production and marketing process. The music video production had been focused to be completed with high quality by adjusting the production process economically in spite of the relatively short period(less than one month)from its crank-up to the deadline. Because the production was planned that main characters lead the whole story, the creative team had been tried to reduce the production hours by commonly use the same mold when they make original clay models by collecting the similarities of characters' appearances. By using CG technic, could overcome the visual monotonous from the similarities which inferred above. Also, the repeated rhythm in the music video, the similar scenes of backgrounds were commonly used by copy of the original scene. At the point of directing, the creative team considered both economical and art aspects for the quality work. In details, they divided the scenes into foreground and background, and removed unnecessary parts to save the production hours and budget but make depth of fields in the scenes. Except the viral marketing purposes, was searching for the methods to compensate the production cost. For this, the characters in the music video dressed the same T-shirts which are world-cup logo on, and those were designed for the sale after released the music video. Even the result of the sales was not enough to satisfied, it was estimated a great attempt to the domestic animation industry.

  • PDF

Insurance system for legal settlement of drone accidents (드론사고의 법적 구제에 관한 보험제도)

  • Kim, Sun-Ihee;Kwon, Min-Hee
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.1
    • /
    • pp.227-260
    • /
    • 2018
  • Recently, as the use of drones increases, the risk of drone accidents and third-party property damage is also increasing. In Korea, due to the recent increase in drone use, accidents have been frequently reported in the media. The number of reports from citizens, and military and police calls regarding illegal or inappropriate drone use has also been increasing. Drone operators may be responsible for paying damages to third parties due to drone accidents, and are liable for paying settlements due to illegal video recording. Therefore, it is necessary to study the idea of providing drone insurance, which can mitigate the liability and risk caused by drone accidents. In the US, comprehensive housing insurance covers damages caused by recreational drones around the property. In the UK, when a drone accident occurs, the drone owner or operator bears strict liability. Also, in the UK, drone insurance joining obligation depends on the weight of the drones and their intended use. In Germany, in the event of personal or material damage, drone owner bears strict liability as long as their drone is registered as an aircraft. Germany also requires by law that all drone owners carry liability insurance. In Korea, insurance is required only for "ultra-light aircraft use businesses, airplane rental companies and leisure sports businesses," where the aircraft is "paid for according to the demand of others." Therefore, it can be difficult to file claims for third party damages caused by unmanned aerial vehicles in personal use. Foreign insurance companies are selling drone insurance that covers a variety of damages that can occur during drone accidents. Some insurance companies in Korea also have developed and sell drone insurance. However, the premiums are very high. In addition, drone insurance that addresses specific problems related to drone accidents is also lacking. In order for drone insurance to be viable, it is first necessary to reduce the insurance premiums or rates. In order to trim the excess cost of drone insurance premiums, drone flight data should be accessible to the insurance company, possibly provided by the drone pilot project. Finally, in order to facilitate claims by third parties, it is necessary to study how to establish specific policy language that addresses drone weight, location, and flight frequency.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Experimental Study on the Performance Improvement of Velcro Reinforcement through Internal Filling (내부충진을 통한 벨크로 보강재의 성능향상에 대한 실험적 연구)

  • Jeong, Yeong-Seok;Kwon, Minho;Kim, Jin-Sup;Nam, Gwang-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.347-355
    • /
    • 2021
  • During the earthquake, for multi-story structure, if the first floor is soft, the deformation will concentrate on that floor causing a serious damage to the column members which might leads to the collapse of the whole structure like Piloti structure during the Pohang earthquake in Korea. According to the 2016 National Disaster Management Research Institute's "Investigation of Seismic Reinforcement and Cost Analysis of Domestic Non-seismic Buildings", the rate of seismic resistance of private reinforced concrete buildings was 38.3 %. Among them, it was reported that the seismic-resistance ratio of the two to five-story structures was less than 50 %. Accordingly, the government is trying to improve the seismic rate through support projects, but the conventional seismic reinforcement methods are still expensive, and emergency construction is difficult. Therefore, in this study, the field applicability was evaluated by improving the reinforcement method using Velcro, which was developed through the research project of the Ministry of Land, Transport and Maritime Affairs in 2014. In order to improve the performance of the Velcro reinforcement method, introducing the initial tension of Velcro using high foaming rigid urethane filling between the Velcro and concrete of the columns was applied. Additionally, an experiment was conducted to evaluate the ductility of Velcro specimen from the concrete confinement effect. As a result, the ductility of the Velcro specimen was improved compare to Normal specimen. However, the energy dissipation capacity of VELCRO2 is better than VELCRO1, yet the maximum ductility of those two specimens did not show a significant difference. Therefore, the improvement of the internal filler material is still needed to have a better maximum ductility.

Clinical Practice Guideline for Cardiac Rehabilitation in Korea

  • Kim, Chul;Sung, Jidong;Lee, Jong Hwa;Kim, Won-Seok;Lee, Goo Joo;Jee, Sungju;Jung, Il-Young;Rah, Ueon Woo;Kim, Byung Ok;Choi, Kyoung Hyo;Kwon, Bum Sun;Yoo, Seung Don;Bang, Heui Je;Shin, Hyung-Ik;Kim, Yong Wook;Jung, Heeyoune;Kim, Eung Ju;Lee, Jung Hwan;Jung, In Hyun;Jung, Jae-Seung;Lee, Jong-Young;Han, Jae-Young;Han, Eun Young;Won, Yu Hui;Han, Woosik;Baek, Sora;Joa, Kyung-Lim;Lee, Sook Joung;Kim, Ae Ryoung;Lee, So Young;Kim, Jihee;Choi, Hee Eun;Lee, Byeong-Ju;Kim, Soon
    • Journal of Chest Surgery
    • /
    • v.52 no.4
    • /
    • pp.248-329
    • /
    • 2019
  • Background: Though clinical practice guidelines (CPGs) for cardiac rehabilitation (CR) are an effective and widely used treatment method worldwide, they are as yet not widely accepted in Korea. Given that cardiovascular disease is the second leading cause of death in Korea, it is urgent that CR programs be developed. In 2008, the Government of Korea implemented CR programs at 11 university hospitals as part of its Regional Cardio-Cerebrovascular Center Project, and 3 additional medical facilities will be added in 2019. In addition, owing to the promotion of CR nationwide and the introduction of CR insurance benefits, 40 medical institutions nationwide have begun CR programs even as a growing number of medical institutions are preparing to offer CR. The purpose of this research was to develop evidence-based CPGs to support CR implementation in Korea. Methods: This study is based on an analysis of CPGs elsewhere in the world, an extensive literature search, a systematic analysis of multiple randomized control trials, and a CPG management, development, and assessment committee comprised of 33 authors-primarily rehabilitation specialists, cardiologists, and thoracic surgeons in 21 university hospitals and 2 general hospitals. Twelve consultants, primarily rehabilitation, sports medicine, and preventive medicine specialists, CPG experts, nurses, physical therapists, clinical nutritionists, and library and information experts participated in the research and development of these CPGs. After the draft guidelines were developed, 3 rounds of public hearings were held with staff members from relevant academic societies and stakeholders, after which the guidelines were further reviewed and modified. Results: CR involves a more cost-effective use of healthcare resources relative to that of general treatments, and the exercise component of CR lowers cardiovascular mortality and readmission rates, regardless of the type of coronary heart disease and type and setting of CR. Conclusion: Individualized CR programs should be considered together with various factors, including differences in heart function and lifestyle, and doing so will boost participation and adherence with the CR program, ultimately meeting the final goals of the program, namely reducing the recurrence of myocardial infarction and mortality rates.

Fundamental Economic Feasibility Analysis on the Transition of Production Structure for a Forest Village in LAO PDR (라오스 산촌마을의 생산구조전환을 위한 투자 경제성 기초 분석)

  • Lee, Bohwe;Kim, Sebin;Lee, Joon-Woo;Rhee, Hakjun;Lee, Sangjin;Lee, Joong-goo;Baek, Woongi;Park, Bum-Jin;Koo, Seungmo
    • The Journal of the Korean Institute of Forest Recreation
    • /
    • v.22 no.4
    • /
    • pp.11-22
    • /
    • 2018
  • This study analyzes the economic feasibility on the transition of production structure to increase income for a local forest village in Laos PDR. The study area was the Nongboua village in Sangthong district where the primary product is rice from rice paddy. Possible strategies were considered to increase the villagers' revenue, and Noni (Morinda citrifolia) was production in the short-term. We assumed that the project period was for 20 years for the analysis, and a total of 1,100 Noni tree was planted in 1 ha by $3m{\times}3m$ spacing. This study classified basic scenario one, scenario two, scenario three by the survival rate and purchase pirce of Noni. Generally Noni grows well. However, the seedlings' average survival rate (= production volume) was set up conservatively in this study to consider potential risks such as no production experience of Noni and tree disease. The scenario one assumed that the survival rate of Noni seedlings was 50% for 0-1 years, 60% for 0-2 years, and 70% for 3-20 years; the scenario two, 10% less, i.e., 40%, 50%, and 60%; and the scenario three, 10% less, i.e., 40%, 50%, 60% and purchase price 10% less, i.e., $0.29 to $0.26, respectively. Our analysis showed that all 3 scenarios resulted in economically-feasible IRR (internal rate of return) of 24.81%, 19.02%, and 16.30% of with a discounting rate of 10%. The B/C (benefit/cost) ratio for a unit area (1ha) was also analyzed for the three scenarios with a discounting rate of 10%, resutling in the B/C ratio of 1.71, 1.47, and 1.31. The study results showed that the Nongboua village would have a good opportunity to improve its low-income structure through planting and managing alternative crops such as Noni. Also the results can be used as useful decision-making information at a preliminary analysis level for planning other government and public investment projects for the Nonboua village.

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.