A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Third-Party Funding in International Discussions and Treaty Arbitration (국제투자중재와 제3자 자금제공: 국제적 논의와 중재판정례에서의 쟁점)

  • Eom, Jun-Hyun
    • Journal of Arbitration Studies
    • /
    • v.31 no.4
    • /
    • pp.3-27
    • /
    • 2021
  • Recent Discussions on Third-Party Funding (TPF) in the forums of UNCITRAL, ICSID, and ICC are making different levels of progress towards finalizing the rules. However, they also have similarities in dealing with legal issues related to TPF, such as definitions, disclosure, allocation of costs, and security for costs. International treaty tribunals have dealt with TPF issues, too. When it comes to the standing of funded claimants, the tribunal in Ambiente v. Argentina did not accept the argument that claimants were controlled by the TPF provider. Concerning the scope of the disclosure, the tribunal in Tennant v. Canada ordered the disclosure of the TPF arrangement. As for the allocation of costs, the tribunal in Kardassopoulos v. Georgia noted that there is no reason why a TPF agreement should be treated differently than an insurance contract. Regarding the security for costs, the tribunal in South American Silver v. Bolivia considered the mere existence of a third-party funder as not an exclusive factor to determine costs in the earlier stage of the proceedings. Lastly, relating to TPF as a ground for annulment, the tribunal in Teinver v. Argentina declined the respondent's argument that the TPF agreement was the vehicle of fraud.

Economic Evaluation Model of FMS Replacement under Technological Progress (FMS의 설비교체계획에 대한 경제적 평가모형)

  • 이상철;하정진
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.7-13
    • /
    • 1991
  • Recently, in FMS composing of various automatic equipments, the machines with lower operating costs, and with higher operating costs and replacement costs resulting from deterioration have been appearing successively as a result of rapidly advances in technology. "Control Limit Policy" [1] by using Markov decision policy, a kind of optimal economic replacement decision, well reflects and represents this environment. In this paper, it is reviewed that the decision method of the forecasted replacement alternatives in planning horizon under technological advances is derived. The proposed method is applied to a numerical example and some characteristics are examined by sensitivity. It is clarified that the method is relatively insensitive to changes of parameters at the present decision. decision.

  • PDF

Economic Effect of Home Health Care Services for Community-dwelling Vulnerable Populations (재가 취약계층을 위한 지역사회 중심 가정간호서비스의 경제적 효과)

  • Lee, Eunhee;Kim, Jinhyun
    • Journal of Korean Academy of Nursing
    • /
    • v.46 no.4
    • /
    • pp.562-571
    • /
    • 2016
  • Purpose: In this study the costs and benefits of a home health care program were examined to evaluate the economic feasibility of the program. Methods: The study participants included 349 patients in the community who had been registered at a home health care center for 5 years. The costs and benefits of the program were analyzed using performance data and health data. The benefits were classified as the effects of pressure ulcer care, skin wound care and catheters management. The program effect was evaluated on the change of progress using transition probability. Benefits were divided into direct benefit such as the savings in medical costs and transportation costs, and indirect benefits which included saving in productivity loss and lost future income. Results: Participants had an average of 1.82 health problems. The input cost was KRW 36.8~153.3 million, the benefit was KRW 95.4~279.7 million. Direct benefits accounted for 53.4%~81.2%, and was higher than indirect benefits. The net benefit was greater than 0 from 2006 to 2009, and then dropped below 0 in 2010. Conclusion: The average net benefit during 5 years was over 0 and the benefit cost ratoi was over 1.00, indicating that the home health care program si economical.

Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges (불확실성을 고려한 철도 교량의 LCC분석 시스템 개발)

  • Cho, Choong-Yuen;Sun, Jong-Wan;Kim, Lee-Hyeon;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

An Estimating Model for Job-Site Overhead Costs according to Progress Rate (공정률에 따른 아파트 건설공사 현장관리비 산정모델)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.43-52
    • /
    • 2018
  • Generally, research on construction cost has been done mostly regarding its direct cost, thus model regarding indirect cost lacks attention. This research seeks to introduce a model to predict on-site overhead cost for apartment construction projects, which constitutes a big portion in Korean construction industry. We devised an equation of 9th degree via curve-fitting, using multiple on-site actual expense data, which can be used to calculate per-progress rate, per-day on-site overhead cost. We further show prospective usage of the model by applying it on construction projects sizing about 30 billion won. Regarding the fact that previous studies could not recognize pattern changes of a total on-site overhead cost, this model is worthy of its conveniency and thoroughness, as well as providing reasonal ground for its derivation in predicting on-site overhead cost of apartment construction projects.