1 |
Jeong, K., and Lee, J. (2016). "Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 95-102.
DOI
|
2 |
Jeong, K., and Lee, J. (2017). "Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 18(2), pp. 30-37.
DOI
|
3 |
Jeong, K., Park, Y., and Lee, J. (2012). "Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension." Korean Journal of Construction Engineering and Management, KICEM, 13(6), pp. 33-44.
DOI
|
4 |
Kim, H. (2011). "Study on a Model to Deploy Apartment Project Management Manpower." KyungHee Univ, of Seoul, Korea.
|
5 |
Kwon, K., Kim, S., Son, H., Choi, J., and Lee, D. (2010). "Investigation on the Manpower Staffing Plan Utiling Density Analysis Method." Proceedings of the Korean Institute of Building Construction Conference, The Korean Institute of Building Construction, pp. 119-123.
|
6 |
Kwon, M. (2015). "A study on human resources planning for building projects." Hanyang Univ, of Seoul, Korea.
|
7 |
Lee, W., Kim, S., Kim, S., Lee, D., and Won, I. (2010). "A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size." Proceedings of the Korean Institute of Building Construction Conference, pp. 191-194.
|
8 |
Woo, H. (2012). "A Study of Cost Management and reduction strategy in construction work." Ulsan Univ, of Ulsan, Korea.
|
9 |
Yang, W. (2017). "A model about manpower allocation of engineer for apartment complex construction using effect of the project risk." Sungkyunkwan University, of Seoul, Korea.
|