• 제목/요약/키워드: progress control

검색결과 1,293건 처리시간 0.025초

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안 (The Program of progress control and quality control for the high-rise compound building)

  • 정을규;임칠순
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

내역물량 측정에 의한 건설공사진도율 산정시스템 (Construction Progress Measurement System by tracking the Work-done Performance)

  • 최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.137-145
    • /
    • 2003
  • 건설공사관리체계는 실적자료를 바탕으로 운영되어야 하며, 공사실적을 정확하게 파악하기 위해서는 합리적인 건설공사진도 율 측정기준 및 그에 따른 진도 율 산정방법이 필요하다. 본 연구에서는 건설공사관리체계 구축에 필수적인 건설공사진도율 산정시스템 개발 및 그 시스템의 합리적인 운용 방안을 제시하였다. 그 방법으로서 분할된 단위작업들은 공사 진행에 따라 집행된 내역물량을 기준으로, 상위레벨의 작업범위에 대하여는 실행기성(earned value)을 바탕으로 건설공사의 진도 율을 산정 할 수 있는 시스템(construction progress measurement system; CPMS)을 제시하였다 일반 PC의 Window환경에서 제공되는 프로그래밍 인터페이스(interface) 기능인 ODBC(Open DataBase Connectivity)는 상이한 프로그램간의 데이터 교환을 통해 정보공유를 가능케 하고 있다 본 연구에서 제시하는 건설공사진도 율 산정 시스템은 ODBC를 통해, 상용 일정관리프로그램을 활용해서 생성된 데이터를 그대로 이용하고, 시스템 내에서 생성된 데이터는 일정관리프로그램에 갱신(update)된 정보로 제공된다. 제안된 건설공사진도 율 측정시스템의 실용화를 촉진시키기 위해서는 진도 율 측정에 의한 수치 값을 분석하여 향후 공사의 전망 등을 예측할 수 있어야 하는데 이에 대한 연구가 필요하다.

철도 공사의 효율적인 공정 관리를 위한 진도율 예측 기법 연구 (A Study on Forecasting Method for Efficient Schedule Management in Railway Construction)

  • 박진정;김현승;최광열;신민호;강인석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1518-1524
    • /
    • 2010
  • Measures on poor process should be identified by reviewing analysis of planned progress and actual progress for successful performance of Process Control. However, the existing Process Control only performances follow-up measures on poor process but it cannot prevent poor process which is not occurred. To solve these problems, this study suggests the three types of methods of process prediction(Regression Analysis) by using a progress rate which consists of planned progress rate and Actual progress rate.

  • PDF

담배규제전략과 발전방향 (Tobacco control in Korea and recommendations for further improvement)

  • 오유미
    • 보건교육건강증진학회지
    • /
    • 제33권4호
    • /
    • pp.11-19
    • /
    • 2016
  • Objectives: FCTC is the first international convention in public health field. Global progress report is about the implementations of the FCTC that are conducted with comparison and analysis for recent trend of tobacco control policies and convention performances on the global level. Methods: By conducting literature review related to tobacco control, expecially through reviewing Implementation of the WHO FCTC GPR(2014), this report compared and analyzed Korea's status of tobacco control based on tobacco control policy in every member state. Results: As a result of the comparison of FCTC to Korea's tobacco control policy, for the first, the most outstanding article that has been peformed continuously is Article 8, 12, 14. Secondly, the policy that has been partially renovated and reinforced is Article 6, 9, 10, 11, and for the last, the policy that has no progress and needs improvement is Article 13. Conclusions: For improvement in Korea's tobacco control policy in the future, first, betterment in policies on categories about advertisements, promotions, sponsorships on tobacco products that passed FCTC commitment period is required along with the modifications of FCTC related laws and reinforcement of the policies, and development of national core competence for an effective implementation of the convention.

The Development of Coating Weight Model and Control Logics in Continuous Galvanizing Line

  • Kook, Chae-Hong;Tae, Shin-Ki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.121.5-121
    • /
    • 2001
  • For the last decade, remarkable progress in the coating weight uniformity of hot dip galvanized product has been made to overcome the tightening quality constraints and produce cost-effective galvanized products. This progress results from research and development works for more efficient air knife, more accurate model of coating process, more precise measurement of coating weight and more efficient control logics. The activities for an efficient mathematical model to predict coating weight and several control logics which has been implemented on the No.1 CGL, No. 2 CGL, and PGL at KwangYang Steel Works are reviewed in this article.

  • PDF

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • 박정로;유승규;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF