• Title/Summary/Keyword: productivity and cost

Search Result 1,367, Processing Time 0.029 seconds

The Socioeconomic Cost of Injuries in South Korea (우리나라 손상의 사회경제적 비용)

  • Park, Kun-Hee;Lee, Jin-Seok;Kim, Yoon;Kim, Yong-Ik;Kim, Jai-Yong
    • Journal of Preventive Medicine and Public Health
    • /
    • v.42 no.1
    • /
    • pp.5-11
    • /
    • 2009
  • Objectives : This study was conducted to estimate the socioeconomic cost of injuries in South Korea. Methods : We matched claims data from national health insurance, automobile insurance and industrial accident compensation insurance(IACI), and mortality data obtained from the national statistical office from 2001 to 2003 by patients unique identifier. Socioeconomic cost included both direct cost and indirect cost: the direct cost was injury-related medical expenditure and the indirect cost included loss of productivity due to healthcare utilization and premature death. Results : The socioeconomic cost of injuries in Korea was approximately 1.9% of the GDP from 2001 to 2003. That is, 12.1 trillion KRW(Korean Won) in 2001, 12.3 trillion KRW in 2002, and 13.7 trillion KRW in 2003. In 2003, direct medical costs were 24.6%(3.4 trillion KRW), the costs for loss of productivity by healthcare utilization were 13.0%(1.8 trillion KRW), and the costs for loss of productivity by premature death were 62.4%(8.6 trillion KRW). Conclusions : In this study, the socioeconomic cost of injuries in Korea between 2001 and 2003 was estimated by using not only health insurance claims data, but also automobile insurance, IACI claims and mortality data. We conclude that social efforts are required to reduce the socioeconomic cost of injuries in Korea, which represented approximately 1.9% of the GDP for the time period specified.

Algorithm for Improvement Alternatives of the Multi-stage Manufacturing Process - For the Application of Enterprise Environment Enhance (다단계 제조공정의 개선을 위한 알고리듬 - 기업환경개선을 위한 활용을 중심으로)

  • 조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.121-131
    • /
    • 1995
  • The purpose of a business's existence is to make profit. The objective of business can be attained through the most profitable activities such as the improvement of productivity, quality and the reduction of the manufacturing cost. In order to produce the goods with above said goal, it can be achieved by inducing and improving the manufacturing process. In this viewpoint, We'd like to develope an algorithm for improving productivity, quality and cutting the manufacturing cost under the limitation of the resources. This paper showed a practical method which gradually improves three factors [productivity, quality and cost-down] by calculating the effective value of single and multi process mutually.

  • PDF

Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations (초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

Comparative Analysis of Financial Performance between Metropolitan General Hospitals and Non-metropolitan General Hospitals (수도권 종합병원과 비 수도권 종합병원의 재무성과 비교 분석)

  • Le, Jin-Woo
    • The Korean Journal of Health Service Management
    • /
    • v.11 no.1
    • /
    • pp.11-25
    • /
    • 2017
  • Objectives : The purpose of this study is to analyze the differences in financial performance, productivity, and patient care performance between metropolitan and non - metropolitan hospitals and examine the factors affecting profitability of both groups. Methods : The survey period consisted of three years of data that can identify the financial performance of the hospital. The survey subjects were selected from 58 metropolitan hospitals, 87 non - metropolitan hospitals and 147 hospitals. Results : There was a significant difference in stability, activity, cost index, productivity, and patient care performance between the metropolitan and non - metropolitan hospitals, and metropolitan hospitals showed a relatively higher ratio. Conclusions : In the metropolitan and non-metropolitan hospitals, the variables of productivity and cost index increase the profitability. However, if the factors with less influence on the results of the study are applied to the variables of various situations, it may have a great influence on the profitability increase.

A Study on the Productivity Analysis Model by R&D Investment (R&D 투자에 의한 생산성 분석 모형에 관한 연구)

  • 김만균;신헌수;함효준
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.41
    • /
    • pp.33-40
    • /
    • 1997
  • The main objective of this study is to analysis the relationship between productivity measurement model which describe and explain R&D(Research & Development) productivity based on production function of Cobb-Douglas and the structure of the R&D investment. The model focuses on the variables related to R&D investment in order to measure the efficiency of R&D largely. So, the proposed model describe the relationship between output(or / input) and factors of production such as capital cost, labor cost and R&D expense, etc. These factors are associated with a signigicant positive correlation between productivity and R&D investment.

  • PDF

Development of PV Module Process Using Automatic Arrangement Tool (자동배열장치를 이용한 태양전지모듈 제조 공정 개발)

  • Kang, Gi-Hwan;Yu, Gwon-Jong;Ahn, Hyung-Keun;Han, Deuk-Young
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.4
    • /
    • pp.1-9
    • /
    • 2003
  • In this study, a manufacturing process for PV module has been developed using an automatic arraying equipment. It is expected that this process could improve the productivity and curtail the production cost in the photovoltaic module production line. From the results, it is proved that this process reduces Line-stop and enhances the productivity more than 15% a day which can be related directly to the production line cost.

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

Productivity Analysis of Rebar Works in Apartment Housing Construction Project (공동주택 철근공사의 현장분석을 통한 생산성에 관한 연구)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Young-Joo;Ha, Min-Su;Ha, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.165-166
    • /
    • 2010
  • In this study, it was accomplished to analyze the productivity and manpower through the activity of rebar work for the application of rational construction cost in apartment house. And the rebar work is very important in the view of the expense and safety, and durability in the construction of R/C structure. Also the rebar work is very affected with productivity owing to the lack of manpower and materials cost rise.

  • PDF

The Improvement of a Acrylic Plate in using a Socket Process for the Productivity Increasing (생산성향상을 위한 콘센트용 아크로 플레이트 공정개선에 관한 연구)

  • Hwang, Kyu-Sung;Lee, Chan-Ho
    • Journal of Digital Convergence
    • /
    • v.10 no.11
    • /
    • pp.271-277
    • /
    • 2012
  • The purpose of this study is to increase productivity through decreasing defect ratio and improving product process. This study finds optimal temperature and pressure at Injection by experiment design and improves acrylic plate cast to increase productivity. In this study, there are some benefits such that Cycle time decreases to 51 (sec) from 70(sec), Operating Defect Ratio decreases to 0.5% from 20% and Cost of Production decreases to 201(won) from 240(won).

A Case Study on Efficiency Analysis of Cable Logging Operation in Korea (국내 가선집재 작업의 효율성 분석에 관한 사례연구)

  • You, JoungWon;Han, Hee;Chung, JooSang
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.35-44
    • /
    • 2019
  • The objectives of this study were to identify engineering problems in the design and installation of cable logging operation that affects productivity through case study of actual logging sites, and to analyze associated productivity loss and increased cost. As a result of the study, when the geographic conditions and engineering safety of the site are not sufficiently considered, deflection of the cable line can not be secured. Hourly productivity of the operation decreased to 65% and the logging cost increased by more than two times compared to the productive yarding operation, which lowered overall efficiency of the operation. Thus, it is required to spread filed technologies that minimize unnecessary production cost incurred due to the in-efficient logging operations as well as secure work safety and efficiency to expand cable logging operation throughout the country.