A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

A sutyd on Production Scheduling and Capacity Requirements in Discrete Demand, Fixed Production Quantity System (이산수요, 고정량 생산시스템의 생산일정과 소요용량에 관한 연구)

  • 김만수;강석호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.13 no.2
    • /
    • pp.59-65
    • /
    • 1988
  • This paper discusses the problem of coordinating aggregate planning and production schedules, minimizing the combined set-up inventory and capacity costs. In this study, by using the relation of fixed production quantity and the number of set-up we develop a heuristirc procedure of solving the discrete demand, fixed production quantity, variable capacity problem. First, we obtain the trade-off between set-up cost and capacity cost, then search the point minimizing the combined inventory and capacity costs.

  • PDF

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

Evolutionary Network Optimization: Hybrid Genetic Algorithms Approach

  • Gen, Mitsuo
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.195-204
    • /
    • 2003
  • Network optimization is being increasingly important and fundamental issue in the fields such as engineering, computer science, operations research, transportation, telecommunication, decision support systems, manufacturing, and airline scheduling. Networks provide a useful way to modeling real world problems and are extensively used in practice. Many real world applications impose on more complex issues, such as, complex structure, complex constraints, and multiple objects to be handled simultaneously and make the problem intractable to the traditional approaches. Recent advances in evolutionary computation have made it possible to solve such practical network optimization problems. The invited talk introduces a thorough treatment of evolutionary approaches, i.e., hybrid genetic algorithms approach to network optimization problems, such as, fixed charge transportation problem, minimum cost and maximum flow problem, minimum spanning tree problem, multiple project scheduling problems, scheduling problem in FMS.

  • PDF

금형공장의 공정관리를 위한 Modular Software System

  • 강무진;김영기
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1992.04a
    • /
    • pp.301-305
    • /
    • 1992
  • A mold plant is characterized by complex processes, frequent schedule changes, and lots of troubles. In order to control the production in mold plant efficiently, huge amount of informations are to be managed in the appropriate way. In this paper, a modular software system for production control is described, which is located between a higher level production planning system and a process control system. It contains the functions such as order processing, operations scheduling and control, tool managemant, NC program managememt including DNC functions, production data acquisition and progress control and statistics.

Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding (조선 도장공정 운영전략 수립을 위한 사전모의실험기법)

  • Chung, Kuy-Hoon;Park, Chang-Kyu;Min, Sang-Gyu;Park, Ju-Chull;Cho, Kyu-Kab
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.59-66
    • /
    • 2001
  • This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

  • PDF

Platform development of adaptive production planning to improve efficiency in manufacturing system (생산 시스템 효율성 향상을 위한 적응형 일정계획 플랫폼 개발)

  • Lee, Seung-Jung;Choi, Hoe-Ryeon;Lee, Hong-Chul
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.2
    • /
    • pp.73-83
    • /
    • 2011
  • In the manufacturing system, production-planning is very important in effective management for expensive production facilities and machineries. To enhance efficiency of Manufacturing Execution System(MES), a manufacturing system that reduces the difference between planning and execution, certain production-planning needs a dispatching rule that is properly designed for characteristic of work information and there should be a appropriate selection for the rule as well. Therefore, in this paper dispatching rule will be selected by several simulations based on characteristics of work information derived from process planning data. By constructing information that are from simulation into ontology, one of the knowledge-based-reasoning, production planning platform based on the selection of dispatching rule will be demonstrated. The platform has strength in its wider usage that is not limited to where it is applied. To demonstrate the platform, RacerPro and Prot$\acute{e}$g$\acute{e}$ are used in parts of ontology reasoning, and JAVA and FlexChart were applied for production-planning simulation.

Design and Prototype Implementation of the Curved Plates Flow Tracking and Monitoring System using RFID (RFID 기술을 이용한 곡가공 부재 추적 및 모니터링 시스템 설계 및 프로토타입의 구현)

  • Noh, Jac-Kyou;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.424-433
    • /
    • 2009
  • In order to improve productivity and efficiency of ship production process, production technology converged with Information Technology can be considered. Mid-term scheduling based on long-term schedule of ship building and execution planning based on short-term production schedule have an important role in ship production processes and techniques. However, data used in the scheduling are from the experiences of the past, cognitive, and often inaccurate, moreover the updates of the data by formatted documents are not being performed efficiently. This paper designs the tracking and monitoring system for the curved plates forming process with shop level. At first step to it, we redefine and analyze the curved plates forming process by using SysML. From the definition and analysis of the curved plates forming process, we design the system with respect to operational view considering operational environment and interactions between systems included and scenario about operation, and with respect to system view considering functionalities and interfaces of the system. In order to study the feasibility of the system designed, a prototype of the system has been implemented with 13.56 MHz RHD hardware and application software.

Tire Industry and Its Manufacturing Configuration

  • Lee, Young-Sik;Cpim;Lee, Jin-Kyu
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.135-138
    • /
    • 2000
  • This paper is intended to propose what manufacturing configuration (manufacturing planning and shop floor control) is suitable for the tire industry. Basically tire-manufacturing process is mixed-products, parallel-disconnected-flow-shop. Both throughput time and cycle tine are very short, the variety of tires is very high, the setup time is long, shop floor data reporting requirements is high, and there are many equipments and people working. And with no exception, tire industry also now confronts increasing requirements of delivery conformance with the above peculiar characteristics of tire manufacturing and changing market environments, this paper suggests, weekly master scheduling with no MRP is desirable and traditional kanban is right selection for shop floor control/scheduling. This paper describes why this configuration should be, using the manufacturing engineering principles and some new insights like four primitives of parallel flow shop. Generally known that shop with high parallel-product-mix and long setup time isn't good candidate for kanban. The four primitives of parallel flow shop explain why kanban is also useful scheduling technique in that environment.

  • PDF

Large Step Optimization Approach to Flexible Job Shop Scheduling with Multi-level Product Structures (다단계 제품 구조를 고려한 유연 잡샵 일정계획의 Large Step Optimization 적용 연구)

  • Jang, Yang-Ja;Kim, Kidong;Park, Jinwoo
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2002.05a
    • /
    • pp.429-434
    • /
    • 2002
  • For companies assembling end products from sub assemblies or components, MRP (Material Requirement Planning) logic is frequently used to synchronize and pace the production activities for the required parts. However, in MRP, the planning of operational-level activities is left to short term scheduling. So, we need a good scheduling algorithm to generate feasible schedules taking into account shop floor characteristics and multi-level job structures used in MRP. In this paper, we present a GA (Genetic Algorithm) solution for this complex scheduling problem based on a new gene to reflect the machine assignment, operation sequences and the levels of the operations relative to final operation. The relative operation level is the control parameter that paces the completion timing of the components belonging to the same branch in the multi-level job hierarchy. In order to revise the fixed relative level which solutions are confined to, we apply large step transition in the first step and GA in the second step. We compare the genetic algorithm and 2-phase optimization with several dispatching rules in terms of tardiness for about forty modified standard job-shop problem instances.

  • PDF