• Title/Summary/Keyword: production batch size

Search Result 89, Processing Time 0.029 seconds

생산 라인에서의 실시간 배치 크기 결정 (Real-Time Batch Size Determination in The Production Line)

  • 나기현;김민제;이종환
    • 산업경영시스템학회지
    • /
    • 제42권1호
    • /
    • pp.55-63
    • /
    • 2019
  • This paper develops an algorithm to determine the batch size of the batch process in real time for improving production and efficient control of production system with multiple processes and batch processes. It is so important to find the batch size of the batch process, because the variability arising from the batch process in the production system affects the capacity of the production. Specifically, batch size could change system efficiency such as throughput, WIP (Work In Process) in production system, batch formation time and so on. In order to improve the system variability and productivity, real time batch size determined by considering the preparation time and batch formation time according to the number of operation of the batch process. The purpose of the study is to control the WIP by applying CONWIP production system method in the production line and implements an algorithm for a real time batch size decision in a batch process that requires long work preparation time and affects system efficiency. In order to verify the efficiency of the developed algorithm that determine the batch size in a real time, an existed production system with fixed the batch size will be implemented first and determines that batch size in real time considering WIP in queue and average lead time in the current system. To comparing the efficiency of a system with a fixed batch size and a system that determines a batch size in real time, the results are analyzed using three evaluation indexes of lead time, throughput, and average WIP of the queue.

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권4호
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

생산라인의 병목공정에서 배치크기 결정 모형 (A Batch Sizing Model at a Bottleneck Machine in Production Systems)

  • 구평회;고시근
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.246-253
    • /
    • 2007
  • All of the machines in a production line can be classified into bottleneck and non-bottleneck machines. A bottleneck is a resource whose capacity limits the throughput of the whole production facility. This paper addresses a batch sizing problem at the bottleneck machine. Traditionally, most batch sizing decisions have been made based on the EOQ (economic order quantity) model where setup and inventory costs are considered while throughput rate is assumed to be given. However, since batch size affects the capacity of the bottleneck machine, the throughput rate may not be constant. As the batch size increases, the frequency of the setup decreases. The saved setup time can be transferred to processing time, which results in higher throughput. But, the larger batch size may also result in longer lead time and larger WIP inventory level. This paper presents an alternative method to determine batch size at the bottleneck machine in a manufacturing line. A linear search algorithm is introduced to find optimal throughput rate and batch size at the same time. Numerical examples are provided to see how the proposed method works and to investigate the effects of some parameters.

다품종 소량생산시스템하에서의 로트크기 결정기법에 관한 사례연구 (A study on Lot sizing Technique for Multi-product Small batch production system : A case study)

  • 송수정;김태호;강경식
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.177-186
    • /
    • 1994
  • Economic Lot size decision is studied on this thesis foe the muti-product small batch production system. Even though economic lot size decision has been studied for the MRP system. this could be applied at the industry under the multi-product small batch production system because of very complicate and manager's lack of understand. Therefore, this technique is applied at the industry in order to minimize ordering cosy based on optimal quantity and period, and holding cost according to optimize inventory level under the muti-product small batch production system. After that, lot size decision technique is compared with lot size decision technique which has been used for analyzing and emphasizing productivity

  • PDF

다단계 생산시스템에서 재작업정책의 비교분석 (Comparative Analysis of Rework Policies in Multistage Production System)

  • 신재선;한주윤;정봉주
    • 대한산업공학회지
    • /
    • 제32권1호
    • /
    • pp.29-41
    • /
    • 2006
  • As the quality and environmental problems become one of the most concerned issues of company, the rework policy needs to be efficiently designed and implemented to sustain the company's competitiveness. This paper examines three basic rework policies in multi-stage production systems and analyzes them in terms of costs of setup, production, inspection, and inventory. For analyzing the performance of the rework policies, we propose mathematical models which can compute total production cost and determine the optimal production batch size to minimize the total production cost. The rework policies are classified by the number and location of inspection stages. Using the mathematical models, we could analyze the performances of rework policies and suggest the optimal rework policy according to each manufacturing environment. The analyses show that the proposed model can be used to analytically evaluate and choose the rework policies.

Monascus anka로부터 유기배양에 의한 적색소의 대량생산 (Red Pigment Overproduction by Fed-Batch Culture of Monascus anka)

  • 김희구;박근태;손홍주
    • 한국식품영양학회지
    • /
    • 제11권6호
    • /
    • pp.617-621
    • /
    • 1998
  • The production of red pigment from glucose by fed-batch culture of Monascus anka was investigated. In batch culture using fermentor, 200 rpm of agitation speed, 1vvm of aeration volume, and 10% (v/v) of inoculum size were optimal, respectively. The red pigment production was increased by removal of wall-attached mycelium. In an intermittent feeding fed-batch culture, dry cell weight increased to 30 g/l, adn the red pigment content reached 350 of absorbance at 495nm. In a continuous feeding fed-batch culture, dry cell weight increased to 22g/l, and the red pigment content reached 190 of absorbance at 495nm.

  • PDF

Batch Scheduling Problem with Multiple Due-dates Constraints

  • Mohri, Shintaro;Masuda, Teruo;Ishii, Hiroaki
    • Industrial Engineering and Management Systems
    • /
    • 제10권1호
    • /
    • pp.1-6
    • /
    • 2011
  • This paper describes the issue of batch scheduling.In food production, the lead-time from produc-tion to sale should be decreased becausefreshness of the product is important. Products are shipped at diverse times depending on a demand of sellers, because the types of sellers has become diversified such as super-markets, convenience stores and etc. production of quantity demanded must be completed by time to ship it then. The authors consider a problem with due-dates constraints and construct the algorithm to find the opti-mal schedule that satisfy the due-dates constraint, batch size constraint, inventory time constraint and mini-mize total flow time.

An Algorithm for Scheduling Repetitive Projects with Resource Continuity and Different Batch Sizes

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.565-578
    • /
    • 2013
  • Batch production is common in repetitive construction projects, and it is not unusual for different batch sizes to be used by contractors in one project. While several scheduling methods, such as the Linear Scheduling Method (LSM) and the Repetitive Scheduling Method (RSM) have been proposed and used, no mathematical method for repetitive construction projects has been developed, and it is difficult to consider different batch sizes with the existing methods. An original mathematical algorithm for scheduling repetitive projects with different batch sizes is proposed in this study. This algorithm is illustrated with assumptions of resource continuity and single path in a project and introduces new terms, control batch and critical batch. The algorithm logics and mathematical equations are validated by comparison with the outcomes from a graphical scheduling approach through a simple and practical hypothetic project. As a result, it is expected that the proposed algorithm can be easily adapted and extended to computer software for scheduling, and can be a starting point for research on batch size management in repetitive construction projects.

Crystallization of High Purity Ammonium Meta-Tungstate for production of Ultrapure Tungsten Metal

  • Choi, Cheong-Song
    • 한국결정성장학회:학술대회논문집
    • /
    • 한국결정성장학회 1997년도 Proceedings of the 13th KACG Technical Meeting `97 Industrial Crystallization Symposium(ICS)-Doosan Resort, Chunchon, October 30-31, 1997
    • /
    • pp.1-5
    • /
    • 1997
  • The growth mechanism of AMT(Ammonium Meta-Tungstate) crystal was interpreted as two-step model. The contribution of the diffusion step increased with the increase of temperature, crystal size, and supersaturation. The crystal size distribution from a batch cooling crystallizer was predicted by the numerical solution of a mathematical model which uses the kinetics of nucleation and crystal growth. Temperature control of a batch crystallizer was studied using Learning control algorithm. The purity of AMT crystal producted in this investigation was above 99.99%.

  • PDF

준비비와 재고비를 고려한 직렬 비연속 공정과 중간 저장조의 최적설계 (Optimal design of batch-storage serial trains considering setup and inventory holding cost)

  • 이경범
    • 제어로봇시스템학회논문지
    • /
    • 제3권4호
    • /
    • pp.398-405
    • /
    • 1997
  • This article presents a new model which is called Periodic Square-Wave(PSW) to describe the material flow of the periodic processes involving intermediate buffer. The material flows incoming into and outgoing from the intermediate buffer are assumed to be periodic square shaped. PSW model gives the same result as that of Economic Production Quantity(EPQ) model for determining optimal lot size of single stage batch storage system. However, for batch storage serial train system, PSW model gives a different optimal solution of about 6 % reduced total cost. PSW model provides the more accurate information on inventory and production system than the classical approach by maintaining simplicity and increasing computational burden.

  • PDF