• Title/Summary/Keyword: procurement planning of resources

Search Result 14, Processing Time 0.02 seconds

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

A study on the state of customized visiting oral health programs (맞춤형 방문구강보건사업 현황조사)

  • Jung, Jae-Yeon
    • Journal of Korean society of Dental Hygiene
    • /
    • v.9 no.4
    • /
    • pp.606-619
    • /
    • 2009
  • Objectives : This study was to examine the state of customized visiting oral health programs in a bid to help facilitate the unified operation of the programs and the development of required guidelines. Methods : The subjects in this study were 49 dental hygienists who were professionals responsible for customized visiting health care programs across the nation. Results : 1. Regarding the form of employment of the dental hygienists were investigated many contract and daily workers. 2. As to the possession of equipment necessary for visiting oral health programs, denture cleaners(12.2%) were most widely possessed in some regions, followed by mobile scalers(10.2%) and mobile suctions(8.2%). In terms of expendable devices and materials, dental mirrors, pincettes and explorers were the most widely possessed dental checkup devices, and the most widely possessed oral hygiene supplies were toothbrushes, interdental brushes and denture cleaners. Those devices and materials were in more possession than the other types of devices and materials. The most widely possessed equipment for educational purpose was laptop computers, followed by beam projectors and screens. The most widely possessed teaching materials were dentiform, followed by CD-ROMs. 3. Those whom they visited the most for oral health care service were elderly people, followed by the disabled and patients with chronic diseases. The dental hygienists who went out to visit those people outnumbered the others who stayed at public health centers. Concerning the types of visiting oral health care service, the most prevalent service provided to the elderly included denture cleaning/management, oral massage and preventive treatment against dental caries. The most dominant service provided to the disabled involved education of the oral health care act, preventive treatment against dental caries and toothbrushing by professionals. The most common service offered to patients with chronic diseases was education of the oral health care act and oral health education. The dental hygienists paid a visit to a mean of 5.8 households a day. The average weekly number of households cared by the dental hygienists was 27.3. It took a mean of 37.1 minutes for them to take care of each household. 4. As for satisfaction level with the implementation of the visiting oral health programs, they expressed the greatest satisfaction at teamwork with professionals($3.56{\pm}0.94$), followed by the professionalism of their work($3.21{\pm}0.94$) and workload($3.08{\pm}0.94$). Their satisfaction level with the work conditions required for creative job performance($2.75{\pm}0.98$) and partnership with other institutions($2.64{\pm}1.03$) was below 3.0. In regard to the impact of their characteristics, marital status made a statistically significant difference to satisfaction level with workload. The unmarried dental hygienists were more pleased with their workload than the married ones(p<0.05). 5. As to needs for education for professionalism improvement, they asked for education about visiting oral health care skills the most, followed by education about oral health care for patients with chronic diseases, education of planning/evaluation and education of oral health care for the disabled. Conclusions : The top priority for the vitalization of the programs was the procurement of budget, followed by the procurement of equipment and educational media and the procurement of human resources.

  • PDF

Korea's Rural Development Characteristics and the Implications to Vietnam (한국의 농촌개발 경험이 베트남에 주는 시사점)

  • Im, Sang Bong
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • Korea is becoming a model country for the developing countries' agricultural and rural development. Drawing implications for Vietnam from Korea's experiences can help make development strategies and policies for other developing countries including North Korea as well as for Vietnam itself. Vietnam is facing an inefficiency in agricultural production and the gap between urban and rural growth has been widening. Farm sizes per household are small and farmlands are scattered. Diversification in rural industry is very restricted. To attack these problems, investment is urgently needed for rural infrastructure building as well as agricultural structure adjustment. In the process of rural development, there have been also encountered such problems as financial procurement, community's spontaneous participation, manpower development for adjusting to industrial structural change. Korea's experiences may be helpful for establishing rural development strategies and policies in Vietnam. Benchmark scopes can go beyond Saemaul Undong in 1970s. Korea's pre- and post-Saemaul Undong era as well as the Saemaul Undong era can be referred. In the wake of globalization, Vietnam has not only experienced compressed rapid economic growth but also encountered policy tasks to eradicate poverty, to realize self-reliance and income increase, and to lessen urban-rural development gap, at the same time. Korea's experiences show that priority needs to be put on the establishment of national and rural development strategies based on Vietnam-specific conditions, utilization of village's resources including community tradition and social capital, fund raising for rural development, farmland development and mobilization, production and living infrastructure building, technology transfer for farmers and vocational training for new job seekers.

A Study on the Cost Reduction Strategy of Aviation Ammunition (항공탄약 구매 비용 절감 방안에 관한 연구)

  • Kim, Yu-Hyun;Eom, Jung-Ho
    • Journal of National Security and Military Science
    • /
    • s.15
    • /
    • pp.57-86
    • /
    • 2018
  • The ROKAF has been training for a number of exercise for victory in the war, but the lack of aviation ammunition has become a big issue every year. However, due to the limitation of defense resources, there are many difficulties in securing and stockpiling ammunition for the war readiness. Therefore, there is a need to find a way to secure aviation ammunition for war readiness in a more economical way, so In this study, we analyze the precedent research case and the case of the reduction of the purchase cost of weapon system of other countries, and then I have suggested a plan that is appropriate for our situation. As a result of examining previous research cases for this study, there were data that KIDA studied in 2012, Precision-guided weapons acquisition cost reduction measures pursued by US Air Force And the use of procurement agencies that are being implemented by NATO member countries. Based on this study, the following four measures were proposed to reduce the purchase cost of aviation ammunition. First, the mutual aid support agreement was developed to sign the ammunition joint operation agreement. Second, join the NATO Support & Procurement Agency (NSPA) Third, it builds a purchasing community centered on the countries operating the same ammunition Fourth, participating in the US Air Force's new purchase plan for ammunition and purchase it jointly. The main contents of these four measures are as follows. 1. the mutual aid support agreement was developed to sign the ammunition joint operation agreement. Korea has signed agreements on mutual logistics support with 14 countries including the United States, Israel, Indonesia, Singapore, Australia, and Taiwan. The main purpose of these agreements is mutual support of munitions and materials, also supporting the training of the peace time and promoting exchange and cooperation. However, it is expected that there will be many difficulties in requesting or supporting mutual support in actual situation because the target or scope of mutual aid of ammunition is not clearly specified. Thus, a separate agreement on the mutual co-operation of more specific and expanded concepts of aviation ammunition is needed based on the current mutual aid support agreements 2. join the NATO Support & Procurement Agency (NSPA) In the case of NATO, there is a system in which member countries purchase munitions at a low cost using munitions purchase agencies. It is the NATO Purchasing Agency (NSPA) whose mission is to receive the purchasing requirements of the Member Nations and to purchase them quickly and efficiently and effectively to the Member Nations. NSPA's business includes the Ammunition Support Partnership (ASP), which provides ammunition purchase and disarming services. Although Korea is not a member of NATO, NSPA is gradually expanding the scope of joint procurement of munitions, and it is expected that Korea will be able to join as a member. 3. it builds a purchasing community centered on the countries operating the same ammunition By benchmarking the NSPA system, this study suggested ways to build a purchasing community with countries such as Southeast Asia, Australia, and the Middle East. First, it is necessary to review prospectively how to purchase ammunition by constructing ammunition purchasing community centered on countries using same kind of ammunition. 4. participating in the US Air Force's new purchase plan for ammunition When developing or purchasing weapons systems, joint participation by several countries can reduce acquisition costs. Therefore, if the US Air Force is planning to acquire aviation ammunition by applying it to the purchase of aviation ammunition, we will be able to significantly reduce the purchase cost by participating in this plan. Finally, there are some limitations to the method presented in this study, but starting from this study, I hope that the research on these methods will be actively pursued in the future.

  • PDF

Study of High Rate Filter. (고속여과의 효과에 관한 연구)

  • 박인규
    • Water for future
    • /
    • v.10 no.2
    • /
    • pp.91-100
    • /
    • 1977
  • This is an experimental study to raise higher efficiency of filteration than conve ntional filteration by increasing of filteration capacity for per unit area and by extending of filteration lasting time with biflow filter system which was improved from the conventional rapid sand filteration method in the process of water purification treatment. In order to raise more efficient function of filteration and giving consideration to the filter layer at upper and lower parts of the filter, the fine sand & an thracite were used as a filter medium. Although there is some difficulty than previous fine sand in procurement, it could confirm that such filter medium (fine sand & anthracite) was more effective in the field of load, lasting time and back wash, etc. In consideration of practical effect of filteration. The raw water which was used for this experimental study was not coagulated. As a result of this experiment, the filteration volume could increase more than 2 times than that of conventional method. Besides, much more advantages could be obtained for instance, the requirement of installation area was not much and installation cost could economize. On the other hand, the following results were found. The quality of filtered water became worse as time goes by and the turbidity of filtered water was more influenced by raw water turbidity than by rate of filteration. Lasting time of filteration on change of filteration rate in the filter layer reached 2 times in comparison with previous filter basin, and until loss gead reached to 1.0 meter and 1.5 meter, the following relate formulas between lasting time and rate of filteration were formed. ($T_{1.5}=181.96V^{-0.46},\;T_{1.0}=121.31V^{-0.46}$) Even though the lasting time can be shorten in case of the increase of the filteration rate, but the lasting time was prolonged more than 2 times than of previous method. With taking aim at contribution to the development of water treatment technique, we are planning to study continuously for the future study basing on the results in this papers.

  • PDF

A Study On Wartime Sealift Operation Using Simulation

  • Lee, Sangjin;Yunchul Cho
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.468-476
    • /
    • 2001
  • The ROK TRANSCOM is trying to establish a concrete wartime sealift operation plan. But there are many problems to be solved for setting up the plan. The most serious problem is to procure war materiel to be shipped in U.S.A and next one is to determine the number of sealift assets and to allocate them. The process of sealift operation can be described as follows. Before the order of vessel mobilization, all vessels appointed for activation would be scattered in worldwide in the state of Beaded or unloaded. After the order of vessel mobilization, vessels would go to SPGE(seaport of embarkation) to load war materiel. Some loaded ships should offload the commercial cargo to the near port as soon as they are activated, before they would go to SPOE. All vessels would load procured materiel in SPOE and then go to SPOD(seaport of debarkation). They would offload war materiel in SPOD and then go back to SPOE to load war materiel again. We will simulate this process using ARENA(1), evaluate the sealift capability of ROK and find omit problems of the sealift plan. This model ultimately evaluates the sealift capability and provides planners with critical information far establishing and correcting the plan. This study can also provide military planners with a flexible and accessible decision support tool to provide advance planning under a variety of conditions on the sealift capability. The military planner is expected to make use of this model as a standard for establishing effective and concrete sealift operation in the near future. We can conclude how procurement capability significantly affects the result of sealift operation through this model. We could decide the appropriate levee of sealift asset such as the number of vessels and the number of available berth. So we could allocate effectively the resources for completing the sealift operation within the TGT(Target) time.

  • PDF

Weights for Construction Performance Impact Factors of Public Construction Project (공공건설사업 건설성과 영향요인 가중치 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.373-379
    • /
    • 2012
  • Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.