• 제목/요약/키워드: process plant

검색결과 3,823건 처리시간 0.031초

저온 플라즈마 공정을 이용한 상용설비의 배연가스 처리 기술개발 (Technical Development of Flue Gas Control at Commercial Plant Using the Non-thermal Plasma Process)

  • 유정석;백민수;김태희;김정일;김유석;최석호
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집D
    • /
    • pp.939-944
    • /
    • 2001
  • For the application of simultaneous $DeSO_{2}\;&\;DeNO_{x}$ equipment using non-thermal plasma process to the industrial and power plants, the many types of plasma device and process were studied. The e-beam and pulsed plasma corona discharge process are outstanding for the study to apply commercial large-scale plant from among these. In this paper, non-thermal plasma of technical trends and the characteristics of system developed by Doosan heavy industries & construction Co., Ltd. are explained. We have researched pulsed plasma corona discharge process since 1994. At the basis of reasonable results for the pilot plant, we constructed the demonstration plant at a domestic coal-fired power plant in 1999, as the previous step for commercial use. In near future, enough information about designs and costs of commercial-size system will be obtained.

  • PDF

암모니아 반응기의 분해 효율 최적화를 통한 암모니아 분해 및 수소 정제 공정 모델 연구 (Optimization of Ammonia Decomposition and Hydrogen Purification Process Focusing on Ammonia Decomposition Rate)

  • 조대명;박종화;유돈상
    • 한국수소및신에너지학회논문집
    • /
    • 제34권6호
    • /
    • pp.594-600
    • /
    • 2023
  • In this study, a process model and optimization design direction for a hydrogen production plant through ammonia decomposition are presented. If the reactor decomposition rate is designed to approach 100%, the amount of catalyst increases and the devices that make up the entire system also have a large design capacity. However, if the characteristics of the hydrogen regeneration process are reflected in the design of the reactor, it becomes possible to satisfy the total flow rate of fuel gas with the discharged tail gas flow rate. Analyzing the plant process simulation results, it was confirmed that when an appropriate decomposition rate is maintained in the reactor, the phenomenon of excess or shortage of fuel gas disappears. In addition, it became possible to reduce the amount of catalyst required and design the optimized capacity of the relevant processes.

표준화력발전소의 발전폐수 통합을 이용한 용수 사용량 절감 (Curtailment of Water use Through the Integration of Process Waste Waters at the Standard Thermal Power Plant)

  • 문경석;장희수
    • 한국물환경학회지
    • /
    • 제22권3호
    • /
    • pp.437-443
    • /
    • 2006
  • The Water usage is relationship which is close with the administrative cost from industrial facility. It is not easy to reduce a water usage. This research is the optimization of the waste water quantity which process waste water integration of the standard thermal power plant in system operate time. The turbine rotates by force of the steam and it produces an electricity. Demineralization Water is manufacture purity manufacturing equipment and it is supplied in power plant channel. We knew a possibility of reducing from pure control process. When it is reduced the Back Washing time, Rinsing time of the gravity filter and the activated carbon filter. Also, It is possible even from regeneration phase in Condensate Polishing Demineralization System. In addition, There is also the water which the drain of the sampling water for watching the condition of power plant process will be able to use. Integrates these processes it will be able to reduce an annual 30,000 ton degree. The research is want to use the fundamental data for the water curtailment of the power plant.

복잡(複雜)한 물류(物流)SYSTEM을 가진 설비계획(設備計劃)문제의 SIMULATION 분석(分析) (Analysis of facility expansion plan using simulation technique)

  • 윤상규
    • 산업공학
    • /
    • 제1권1호
    • /
    • pp.27-37
    • /
    • 1988
  • In the multi-stage and multi-process plant, it is not an easy task to describe the interrelationships among each process and facility. The purpose of this simulation study is to analyze the effect of additional facilities on productivity in a steel mill. The simulation was performed using SLAM Simulation Language for Alternative Modeling. The results of this study was used by the plant engineers in making decisions on the expansion of the plate mill. The prediction of which process would cause bottle-necks enabled the plant engineers to invest most effectively.

  • PDF

Optimization of Biphenyl Chloromethylation Process

  • Pak, V.V.;Karimov, R.K.;Shakhidoyatov, Kh.M.;Soh, Deawha
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2000년도 하계학술대회 논문집
    • /
    • pp.707-710
    • /
    • 2000
  • Optimization of the biphenyl chloromethylation process with para-formaldehyde has been investigated in the presence of ZnCl$_2$with HCI gas by the Box-Wilson method of mathematical planning of experiment. The 4,4'- (dichloromethyl)-biphenyl yield dependence on the biphenyl para-formaldehyde ratio, temperature and reaction duration has been studied. A mathematical model of the process has been developed and optimal conditions for the biphenyl chloromethylation procedure has been determined.

  • PDF

OPTIMIZATION OF BIPHENILE CHLOROMETHYLATION PROCESS

  • Pak, V.V.;Karimov, R.K.;Shakhidoyatov, Kh.M.;Soh, Deawha
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2004년도 SMICS 2004 International Symposium on Maritime and Communication Sciences
    • /
    • pp.77-79
    • /
    • 2004
  • Optimization of the biphenile chloromethylation process with paraphormaldegide has been done in the presence of ZnCl$_2$ with HCI gas by the Box-Wilson method of mathematical planning of experiment. The 4, 4'-( dichloromethyl)-biphenile yield dependence on the biphenile - paraphormaldegide ratio, temperature and reaction duration has been studied. A mathematical model of the process has been developed and optimal conditions for the biphenile chloromethylation procedure has been determined

  • PDF

Process Optimization of Biphenile Chloromethylation

  • Pak, V.V.;Karimov, R.K.;Shakhidoyatov, Kh.M.;Soh, D.W.
    • 동굴
    • /
    • 제73호
    • /
    • pp.1-8
    • /
    • 2006
  • Optimization of the biphenile chloromethylation process with paraphormaldegide has been done in the presence of $ZnCl_2$ with HCl gas by the Box-Wilson method of mathematical planning of experiment. The 4,4'-(dichloromethyl)-biphenile yield dependence on the piphenile -paraphormaldegide ratio, temperature and reaction duration has been studied. A mathematical model of the process has been developed and optimal conditions for the biphenile chloromethylation procedure has been determined.

하수처리장 Retrofit 공정의 현장적용성 평가 및 세균 군집 분포 연구 (Evaluation of Field Application for the Developed Retrofitting Process and Analysis of Bacterial Community Structure in Pilot Plant)

  • 김미경;홍준혁;김연권;안태석;신응배
    • 대한환경공학회지
    • /
    • 제28권3호
    • /
    • pp.240-248
    • /
    • 2006
  • 본 연구에서는 선행연구를 통하여 개발된 고도처리 공정의 현장적용을 용이하게 하기 위하여 이를 개조한 retrofitting 공정을 제안하였으며, 제안된 공정을 $50m^3$/일 규모의 pilot plant 운전을 통하여 현장 평가하였다. 또한 pilot plant 내에서 미생물의 배양 상태를 확인하기 위하여 FISH 법을 이용하여 세균 군집구조를 조사하였다. 제안된 retrofitting 공정은 배양조를 별도로 건설하지 않음으로써 16%($60,000m^3$/일 규모 고도처리시설 도입 기준)의 초기건설비를 절감할 수 있는 것으로 평가되었으며, 동절기를 포함한 장기간의 pilot plant 운전을 통하여 수처리 효율과 유지관리 측면에서 현장적용성이 우수한 것으로 사료되며 방류수질 기준을 만족하는 것으로 평가되었다. 또한 pilot plant와 대조군(A2/O 공정, B 하수처리장)에서 총세균수는 큰 차이가 없으나, pilot plant의 bioreactor에 의해서 세균 군집 변화가 다르게 나타났다. 우점종은 주로 하수처리에서 중요한 역할을 하는 토양 미생물이 속한 ${\beta}$-proteobacteria group이고, bioreactor 유출수에서 유입수 대비 $25{\sim}607%$ 증가하는 것으로 확인되었으며, 이렇게 증가된 ${\beta}$-group의 미생물은 시스템 내에서 일정 농도를 유지하는 것으로 확인되었다.

플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 - (A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective -)

  • 홍대근;임용택
    • 시스템엔지니어링학술지
    • /
    • 제15권1호
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • 한국해양공학회지
    • /
    • 제34권3호
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.