• Title/Summary/Keyword: preventive repair

Search Result 158, Processing Time 0.025 seconds

A Study on High Speed Railway Track Deterioration Prediction (고속선 궤도틀림진전예측에 관한 연구)

  • Shim, Yun-Seop;Kim, Ki-Dong;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.261-267
    • /
    • 2010
  • Present maintenance of a high speed railway is after the fack maintenance that executes a task when measured value goes over threshold value except some planned maintenance. It is difficult from efficient management of maintenance human resource and equipment commitment because it is difficult to predict quantity of maintenance targets. Corrective maintenance is pushed back on the repair priority of other target to need repair and it is exceeded repair cost potentially. For safety and dependable track management because track deterioration prediction is linked directly with track's life and safety of train service, it is very important that track management be based on preventive maintenance. In this study, we propose statistics model of track quality to use track inspection data and forecast model for track deterioration prediction.

  • PDF

Development of Stochastic Expected Cost Model for Preventive Optimal- Maintenance of Armor Units of Rubble-Mound Breakwaters (경사제 피복재의 예방적 최적 유지관리를 위한 추계학적 기대비용모형의 개발)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.5
    • /
    • pp.276-284
    • /
    • 2013
  • A stochastic expected cost model has been suggested by combining the nonlinear cumulative damage model with the expected cost model together which can be useful for doing the preventive optimal-maintenance of the armor units of rubble-mound breakwaters. The suggested model has been satisfactorily calibrated by comparison of the results from others models, also the sensitivity analysis has been carried out in detail under the variation of the associated parameters with the model. The optimal repair times can be directly evaluated by minimizing the expected cost rates that depend on the social importances, damage intensity functions and resistance limits. Finally, the present cost model has been straightforwardly applied to the armor units of rubble-mound breakwaters. Based on the assumption of turning the damaged structure back to the state as good as new after repairs, the required optimal repair times and magnitudes can be determined quantitatively in terms of the optimum balance between the costs and benefits on the preventive maintenance.

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

The Role of Gene-environment Interaction in Environmental Carcinogenesis (환경성 발암 기전에서 유전자-환경 상호작용의 역할)

  • Han, So-Hee;Lee, Kyoung-Mu
    • Journal of Environmental Health Sciences
    • /
    • v.36 no.1
    • /
    • pp.1-13
    • /
    • 2010
  • Evidences supporting gene-environment interaction are accumulating in terms of environmental exposure including lifestyle factors and related genetic variants. One form of defense mechanism against cancer development involves a series of genes whose role is to metabolize (activation/detoxification) and excrete potentially toxic compounds and to repair subtle mistakes in DNA. The purpose of this article is to provide a brief review of the notion of gene-environment interaction, environmental/occupational carcinogens and related cancers, and previous studies of gene-environment interaction on cancers caused by exposure to carcinogenesis. With a number of studies on the interaction between lifestyle factors (e.g., smoking and diet) and genetic polymorphisms in genes involved in xenobiotic metabolism and DNA repair excluded, only several studies have been conducted on the interactive effects between polymorphisms of CYPs, GSTs, ERCCs, XRCCs and environmental/occupational carcinogens such as vinyl chloride, benzo[a]pyrene, and chloroform on carcinogenesis or genotoxicity. Future studies may need to be conducted with sufficient number of subjects and based on occupational cohorts to provide useful information in terms of advanced risk assessment and regulation of exposure level.

A Determination of an Optimal Repair Number under Achieved Availability Constraint (성취가용도를 고려한 최적 수리횟수 결정모델에 관한 연구)

  • Na, In-Sung;Park, Myeong-Kyu
    • Journal of Applied Reliability
    • /
    • v.7 no.1
    • /
    • pp.13-22
    • /
    • 2007
  • A preventive maintenance model, caller FNBM (${\alpha},{\delta},{\gamma}$) model, is proposed to decide an optimal repair number under achieved availability requirements (r) along with taking two types of failures (repairable or irrepairable) into account. In this model, the current system is replaced by a new one in case when it doesn't meet the achieved availability requirement, even though it is repairable failure; Othewise it is replaced in time of the first irrepairable failure. Assumed that the j-th failure is repairable with probability ${\alpha}_j$ minimal repairs are allowed for repairable failure between replacements. Expected cost rate for preventive maintenance model is developed using NHPP (Non - Homogeneous Poisson Process) in order to de term in the optimal number $n^*$, also numerical examples are shown in order to explain the proposed model. Since the proposed FNBM (${\alpha},{\delta},{\gamma}$) model includes Park FNBM model (1979) and Nakagawa FNBM (p) model (1983) m this proposed model is thought to be better than previous model, especially for weapon system which requires availability as primary parameter.

  • PDF

Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD (EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발)

  • Lee, Byoung Hak;Lee, Hyuk Soon
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF

A Research on the Determining Model of the Optimizing Maintenance Interval in TBM for the Preventive Maintenance of Facilities (설비예방보전을 위한 TBM의 최적보전주기 설정모델 연구)

  • Kwon Oh-Woon;Lee Hong-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.105-117
    • /
    • 2003
  • The purpose of this research aimed at performing the easy design. and also the easy on-the-job application or the maintenance interval determination methodology by presenting the determining model or the optimizing maintenance interval in TBM for the preventive maintenance or facility TBM(time-based maintenance) as the preventive maintenance requires the adequate determination or the maintenance interval. The maintenance interval or TBM shall be applied differently for the each interval such as He patrol inspection, maintenance, overhaul inspection. exchange. And it is based on the composition level of equipment. The already informed theories or interval determination methodology for the patrol inspection. repair. and overhaul inspection are difficult for adopting because or the several restriction problems in applying the maintenance schemes as the theory So, the model for determining the optimizing exchange interval or part, maintenance interval of auxiliary machine, unit equipment etc. was presented to apply in the maintenance easily and appropriately.

  • PDF

Development of the Preventive Maintenance System for an Urban Transit (도시철도 차량을 위한 예방보전시스템 개발)

  • Ha, Seong-Hoon;Chang, Suk-Hwa;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.1-7
    • /
    • 2007
  • This paper addresses a the maintenance system based on the concept of RAMS (Reliability, Availability, Maintenance, Safety) for the effective maintenance of the urban transit. A systematic approach for developing a cost-effective maintenance strategy based on the component reliability of the system in question is performed according to the following steps : definition of function, functional failures of the systems, construction of RBD (Reliability Block Diagram), and the calculation of reliability indices. The developed preventive maintenance system generates maintenance plan and repair request based on the analysed RAMS data of components and maintenance experience.

The Prevention Countermeasure against Breakdown of GIS using the Preventive Diagnostic Technology (예방진단기술을 활용한 GIS 고장예방대책)

  • Choi, Jong-Soo;Kim, Jong-Gu;Park, Jun-Sung
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.423-427
    • /
    • 2009
  • In the circumstances which a highly reliable operation in electric power facilities of extra high voltage and large capacity is needed, the importance of a preventive diagnostic technology is growing large day and day. The settlement of a preventive diagnostic technology for optimization and efficient management on the electric power facilities like GIS enable the reduce of repair fee, the improvement of safety and the systematic management of electric power facilities. The remaining life prediction of facilities will play a decisive role as a core technology of a preventive diagnostics in the future. And so it is necessary a continuous research and concern for the development of a preventive diagnostic technology hereafter.

  • PDF