• Title/Summary/Keyword: prestressed concrete structure

Search Result 151, Processing Time 0.023 seconds

Calculation of Creep Coefficient for Concrete Structures Applying Time Step Analysis for Relative Humidity and Temperature (상대습도 및 온도에 대한 시간 단계 해석을 적용한 콘크리트 구조의 크리프계수 산정 )

  • Kyunghyun Kim;Ki Hyun Kim;Inyeol Paik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.5
    • /
    • pp.75-83
    • /
    • 2023
  • As part of a study to analyze the excessive camber occurring in prestressed concrete railway bridges, this paper presents a calculation method and analysis results for the creep coefficient which defines the increase in camber of a concrete structure over time. Using the creep coefficient formula of the design code, the coefficient is obtained by applying the climatic conditions (relative humidity and temperature) of 12 regions in Korea. The effects of differences in climatic conditions by region and starting time of load on the creep coefficient are analyzed. In order to properly calculate the creep, most of which occurs in the early stages of loading, a detailed analysis is performed by applying a time step analysis method to consider varying climate conditions through loaded period. The creep coefficient obtained by applying the average climate conditions of the region is similar to the average of the creep coefficients obtained by time step analysis. Through time step analysis, it is shown that the offset and overlap effects of relative humidity and temperature on the creep coefficient and the climate effect at the time of initial loading can be appropriately represented.

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

Spatial mechanical behaviors of long-span V-shape rigid frame composite arch bridges

  • Gou, Hongye;Pu, Qianhui;Wang, Junming;Chen, Zeyu;Qin, Shiqiang
    • Structural Engineering and Mechanics
    • /
    • v.47 no.1
    • /
    • pp.59-73
    • /
    • 2013
  • The Xiaolan channel super large bridge is unique in style and with greatest span in the world with a total length of 7686.57 m. The main bridge with spans arranged as 100m+220m+100m is a combined structure composed of prestressed concrete V-shape rigid frame and concrete-filled steel tubular flexible arch. First of all, the author compiles APDL command flow program by using the unit birth-death technique and establishes simulation calculation model in the whole construction process. The creep characteristics of concrete are also taken into account. The force ratio of the suspender, arch and beam is discussed. The authors conduct studies on the three-plate webs's rule of shear stress distribution, the box girder's longitudinal bending normal stress on every construction stage, meanwhile the distribution law of longitudinal bending normal stress and transverse bending normal stress of completed bridge's box girder. Results show that, as a new combined bridge, it is featured by: Girder and arch resist forces together; Moment effects of the structure are mainly presented as compressed arch and tensioned girder; The bridge type brings the girder and arch on resisting forces into full play; Great in vertical stiffness and slender in appearance.

Application of Post-Tension Technology on Tall Buildings

  • Chung, Kwangryang;Park, Jungwoo;Kim, Younghye;Kim, Dohun
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.285-296
    • /
    • 2017
  • It's been a decade since post-tension system began to be applied in earnest to buildings in Korea. In the meantime, post-tension system has been used in various buildings as main structural system including tall buildings. And post-tension system plays a role to overcome architectural limit of regular RC tall buildings particularly in the realization of long span with shallower depth than other structural system. The post-tensioned building market of Korea has been steadily grown in recent years with such advantage. Recently, post-tension technology is adapted for special structural members like belt walls. In this paper, the authors would like to explain design and construction of tall buildings in Korea using post-tension technology.

A Study on the Design of Special Circular Plate Anchorage for Post-tension (원형 정착판을 사용한 포스트텐션 특수정착구의 설계에 관한 연구)

  • Choi, Kyu-Hyung;Lho, Byeong-Cheol;Lim, Jung-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.6
    • /
    • pp.73-83
    • /
    • 2016
  • Bearing stress near anchor plates is usually very high due to prestressing force in anchorage zone of concrete structure used post-tensioned prestressed method. In order to effective utilization of cross section and crack control, appropriate size of anchorage plates should be used to prevent crack initiation and failure of concrete structures eventually. This study aims to suggest equation for effective area of bearing plate of rectangle type and circular type by Highway Bridge Design Specification and PTI etc. A shape factor according to bearing plate shape is suggested based on numerical analysis, and it can be used suitability for design of special anchorage plate dimension.

New Patent Technology for Retaining Wall and Bridge Abutment (옹벽 및 교대 신기술 특허)

  • Kim, Kyeong-Ho;Choi, Jung-Ho;An, Jung-Seng;Kim, Nak-Gyeom
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.895-898
    • /
    • 2008
  • This research paper intends to investigate and review the new technology of patent registration trend for the most recent domestic retaining wall and bridge abutment, and to apply the technology appropriately to the actual retaining wall and bridge abutment construction. Investigated new technological patents for retaining wall include pre-fabricated PC retaining wall construction method that reduces section force with prestressed PS steel bars, pre-fabricated Coupler-Tension retaining wall, clay reinforced retaining wall block for road, earth reinforced retaining wall block that induces uniform settlement, and etc. Investigated new technologies for abutment are abutment construction method that uses sheet pile, monolithic bridge with complex abutments, construction method for abutment bridge, earth reinforced abutment structure and etc.

  • PDF

Condition assessment of reinforced concrete bridges using structural health monitoring techniques - A case study

  • Mehrani, E.;Ayoub, A.;Ayoub, A.
    • Smart Structures and Systems
    • /
    • v.5 no.4
    • /
    • pp.381-395
    • /
    • 2009
  • The paper presents a case study in which the structural condition assessment of the East Bay bridge in Gibsonton, Florida is evaluated with the help of remote health monitoring techniques. The bridge is a four-span, continuous, deck-type reinforced concrete structure supported on prestressed pile bents, and is instrumented with smart Fiber Optic Sensors. The sensors used for remote health monitoring are the newly emerged Fabry-Perot (FP), and are both surface-mounted and embedded in the deck. The sensing system can be accessed remotely through fast Digital Subscriber Lines (DSL), which permits the evaluation of the bridge behavior under live traffic loads. The bridge was open to traffic since March 2005, and the collected structural data have been continuously analyzed since. The data revealed an increase in strain readings, which suggests a progression in damage. Recent visual observations also indicated the presence of longitudinal cracks along the bridge length. After the formation of these cracks, the sensors readings were analyzed and used to extrapolate the values of the maximum stresses at the crack location. The data obtained were also compared to initial design values of the bridge under factored gravity and live loads. The study showed that the proposed structural health monitoring technique proved to provide an efficient mean for condition assessment of bridge structures providing it is implemented and analyzed with care.

Research on cold-formed steel connections: A state-of-the-art review

  • Qin, Ying;Chen, Zhihua
    • Steel and Composite Structures
    • /
    • v.20 no.1
    • /
    • pp.21-41
    • /
    • 2016
  • Cold-formed steel structures are increasingly attractive due to their benefits of good mechanical performance and constructional advantages. However, this type of construction is still not fully exploited as a result of the acknowledged difficulties involved in forming construction-efficient and cost-effective connections. Furthermore, there is a lack of information on the structural behavior of the cold-formed steel connections. In this study, the research on various cold-formed steel connections was comprehensively reviewed from both fundamental and structural points of view, based on the available experimental and analytical data. It reveals that the current design codes and guidelines for cold-formed steel connections tend to focus more on the individual bearing capacity of the fasteners rather than the overall structural behavior of the connections. Significant future work remains to be conducted on the structural performance of cold-formed steel connection. In addition, extensive previous research has been carried out to propose and evaluate an economical and efficient connection system that is obtained from the conventional connecting techniques used in the hot-rolled industry. These connecting techniques may not be suitable, however, as they have been adopted from hot-rolled steel portal frames due to the thinness of the sheet in cold-formed steels. The review demonstrates that with the increasing demand for cold-formed steel constructions throughout the world, it is crucial to develop an efficient connection system that can be prefabricated and easily assembled on site.

3-D Information Model for High-speed Railway Infrastructures (고속철도시설물을 위한 3차원정보모델)

  • Shim, Chang-Su;Kim, Deok-Won;Youn, Nu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.241-246
    • /
    • 2008
  • Design of a high-speed railway line requires collaboration of heterogeneous application systems and of engineers with different background. Object-based 3D models with metadata can be a shared information model for the effective collaborative design. In this paper, railway infrastructure information model is proposed to enable integrated and inter-operable works throughout the life-cycle of the railway infrastructures, from planning to maintenance. In order to develop the model, object-based 3-D models were built for a 10km railway among Korea high-speed railway lines. The model has basically three information layers for designers, contractors and an owner, respectively. Prestressed concrete box-girders are the most common superstructure of bridges. The design information layer has metadata on requirements, design codes, geometry, analysis and so on. The construction layer has data on drawings, real data for material and products, schedules and so on. The maintenance layer for the owner has the final geometry, material data, products and their suppliers and so on. These information has its own data architecture which is derived from similar concept of product breakdown structure(PBS) and work breakdown structure(WBS). The constructed RIIM for the infrastructures of the high-speed railway was successfully applied to various areas such as design check, structural analysis, automated estimation, construction simulation, virtual viewing, and digital mock-up. The integrated information model can realize virtual construction system for railway lines and dramatically increase the productivity of the whole engineering process.

  • PDF

Vibration reduction design of the Hangzhou Bay cable-stayed bridges

  • Liu, Weiqing;Xu, Xiuli;Wang, Rengui;Wang, Zijun;Wu, Xiaolan
    • Structural Engineering and Mechanics
    • /
    • v.24 no.3
    • /
    • pp.339-354
    • /
    • 2006
  • Hangzhou Bay Bridge spans the Hangzhou Bay and is located at Zhejiang province in the southeast seacoast of China. The total length of the bridge is 36 km. The bridge is composed of bridge approaches made up of multi-span prestressed concrete box girders and two cable-stayed bridges over the north and south navigable spans respectively. The seismic response analysis of the bridge model shows that if the navigable spans are designed as the routine earthquake-resistance system, the displacements and internal forces in pylons, piers and deckes are too large to satisfy the anti-seismic requirement of the structure. Therefore, the seismic reduction design was carried out by using viscous dampers to dissipate the kinetic energy of the structure both longitudinally and transversely. Using the vibration reduction system and aiming at the reasonable optimal goal, the purpose to reduce the seismic responses in south and north navigable spans has been achieved.