• Title/Summary/Keyword: preliminary feasibility

검색결과 399건 처리시간 0.041초

광/열유체 부품의 접합공정 개발 (Development of bonding processes for micro-optical and thermo-fluidic components)

  • 김정호;이지혜;유중돈;최두선
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.137-140
    • /
    • 2002
  • The main objectives in the first year include selection of the MEMS bonding methods and feasibility study of selected methods. The ultrasonic bonding method is chosen for MEMS packaging, and the processes to provide localized heating are proposed. The ultrasonic bonding process is analyzed using a lumped model. Preliminary experiments using the eutectic solder and copper pin were performed to verify possibility to MEMS packaging. The preliminary results show possibility of the ultrasonic bonding method for MEMS packaging.

  • PDF

예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구 (Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data)

  • 문준부;윤성민
    • 한국건설관리학회논문집
    • /
    • 제24권1호
    • /
    • pp.3-11
    • /
    • 2023
  • 현재 국내에서는 건설공사 사후평가 제도에 따라 사업 준공 후 공사내용 및 그 효과를 조사하여 프로젝트의 성과를 평가하고 향후 계획된 유사 건설사업의 효율적인 수행을 위한 자료로 활용하고 있다. 그러나 건설사업의 성과를 보다 효과적으로 관리하기 위해서는 프로젝트 진행 과정에서 단계별 성과를 평가하여 그에 따른 유연한 관리전략을 수립할 수 있어야 한다. 따라서 건설사업의 효율적인 성과관리를 위해서는 건설사업 단계별 성과평가체계가 필요하다. 본 연구는 건설사업 초기단계의 성과를 평가할 수 있는 계획단계 벤치마킹을 위한 기초 모델을 제시하고자 한다. 이를 위하여 본 연구에서는 한국개발연구원에서 제공하고 있는 예비타당성 조사 보고서 중 완료된 도로공사 354건에 대해 데이터베이스를 구축하였다. 계획단계 성과를 평가할 성과지표로 시설용량을 기준으로 한 표준공사비와 표준공사기간 지표를 개발하여 도로사업의 계획단계의 성과를 분석할 수 있는 벤치마킹 모델을 제시하였다. 이를 통해 도로사업 계획단계의 표준공사비 및 표준공사기간을 산정하고, 도로사업의 특성별 차이를 분석하였다. 본 연구의 결과를 활용하여 계획단계의 성과와 설계 및 시공단계의 성과를 연계하여 분석한다면 건설사업 생애주기 동안의 성과관리가 가능할 것으로 기대된다.

농업용 보를 이용한 소수력발전소의 타당성 분석 (Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose)

  • 이철형;박완순
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 춘계학술발표대회 논문집
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

도서관법 개정에 따른 공공도서관 설립 타당성 사전평가의 실효성 분석 (Effectiveness Analysis of Preliminary Evaluation of Public Library Establishment Feasibility Based on the Revised Library Act)

  • 김효윤
    • 한국도서관정보학회지
    • /
    • 제53권3호
    • /
    • pp.119-135
    • /
    • 2022
  • 본 연구의 목적은 도서관법 개정에 따라 의무 적용되는 공공도서관 설립 타당성 사전평가가 도서관의 질적인 측면을 개선할 수 있을지 파악하는 것이다. 이에 도서관법 개정 전 같은 목적으로 시행되었던 공공도서관 건립지원 사업 사전평가의 사례 분석을 통해 사전평가의 실효성을 분석하였다. 사전평가를 거쳐 건립된 도서관들의 경우 도서관법 시행령에서 요구하는 법정 사서 최소 기준 3명을 대부분 확보하고 있어 기본적인 도서관 인력 확보에는 도움이 된다고 할 수 있었다. 하지만 당초 계획하였던 만큼의 인력을 확보하여 운영하는 도서관은 거의 존재하지 않았고 신청서에는 도서관 운영을 직접 운영하겠다고 신청하였지만 실제 개관 시 위탁운영으로 변경된 사례도 있어 사전 검토 내역이 충실히 반영되지 않았다는 측면도 있었다. 본 연구는 사례 분석을 통하여 형식적으로 거쳐야 하는 사전 절차가 되지 않도록 법 개정에 따른 현실성 있는 사서 배치 기준의 재확립과 도서관 등록제를 활용한 사후평가 도입을 제안하였다.

공공사업 타당성 평가의 개선 방안에 관한 연구 (A Study on Improvement of Feasibility Evaluation for Public Projects)

  • 박승준
    • 한국융합학회논문지
    • /
    • 제8권2호
    • /
    • pp.163-168
    • /
    • 2017
  • 기존의 공공사업 타당성 평가는 경제성분석을 위주로 추진되었으나, 계층분석법(AHP: Analytic Hierarchy Process)을 도입하면서 정책성, 지역균형발전, 기술성 등의 항목이 추가로 평가되고 있다. 이 연구는 최근 3년간 건설사업과 연구개발사업의 예비타당성조사 데이터를 분석하고, 비용편익비(Cost-Benefit Ratio)와 계층분석의 가중치(weight) 간의 상관관계 분석을 통해 상호 관련성을 검증하고자 한다. 연구결과 비용편익비와 AHP 가중치의 상관관계가 건설사업의 경우 0.744, 연구개발사업의 경우 0.899로 나타났다. 즉, 사업시행 여부를 결정하는 AHP 결과가 비용편익분석 결과에 의해 크게 좌우됨으로, 경제성 위주의 평가를 보완하기 위해 도입된 AHP가 당초 기대와는 달리 종합적 분석의 역할을 충분히 수행하지 못하고 있다. 따라서 AHP 분석의 효과를 극대화 할 수 있는 다양한 연구설계가 지속적으로 논의될 필요가 있다.

CO2 포집을 고려한 가스터빈 복합화력 발전 플랜트의 시스템 대안 평가를 위한 공학 설계 (Engineering design procedure for gas turbine combined cycle power plant with post-combustion CO2 capture)

  • 이수현;최상민
    • 한국연소학회:학술대회논문집
    • /
    • 한국연소학회 2014년도 제49회 KOSCO SYMPOSIUM 초록집
    • /
    • pp.333-335
    • /
    • 2014
  • As the user demand for power plants becomes various, design objective becomes complicated. To review the system feasibility, system objective and evaluation criteria need to be newly defined. In this study, engineering design procedure of the multi-purpose power plant, such as barge-mounted combined cycle power plant with $CO_2$ capture, was shown as a previous work for the feasibility review of the system alternatives. For the system design, heat and mass balance for each system configuration was firstly performed. Using the thermal analysis results, conceptual design of system alternatives was carried out. And then, preliminary design of the major equipment was done. The engineering calculation results of this study would be used as the evaluation data for system feasibility review.

  • PDF

A Feasibility Study on In-Vessel Core Debris Cooling through Lower Cavity Flooding

  • Yang, Soo-Hyung;Baek, Won-Pil;Chang, Soon-Heung
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1996년도 추계학술발표회논문집(1)
    • /
    • pp.309-314
    • /
    • 1996
  • Feasibility study has been accomplished to evaluate the effectiveness of the in-vessel core debris cooling through lower cavity flooding using two dimensional finite difference scheme. The volume of cerium pool and decay power rate generated in corium pool were evaluated as important parameters to the temperature distribution on the reactor vessel lower head through previous works. In this study, the corium volume based on the System 80+ core structure and time dependent decay power rate are considered for feasibility evaluation. In addition, preliminary plans for the in-vessel core debris cooling through lower cavity flooding as severe accident management strategy, i.e. flooding timing, method and capacity, are suggested based on the result of the numerical study, international tendency related to in-vessel core debris cooling through lower cavity flooding.

  • PDF

신설아파트 열병합발전 도입에 대한 예비 타당성 분석기법 개발 (Development of a Method of Pre-Feasibility Study for the Application of Co-Generation System in New Apartment)

  • 기우봉;김광호
    • 산업기술연구
    • /
    • 제27권A호
    • /
    • pp.185-193
    • /
    • 2007
  • The object of this study is the development of a Method which is enable to review the preliminary feasibility for co-generation system in new apartment buildings. In Korea co-generation systems have been installed in most of large industrial plants and commercial buildings which consume a large quantity of electric and heat energy, for energy saving and cutting products cost, under positive governmental supports. However for apartment buildings which consume quite a large electric and heat energy, are still remained in conventional energy supply system, and are not popular to utilize useful co-generation system. One of the major reason for these is the lack of clear and easy justification tool. In this circumstance, this study can provide a tool to verify the feasibility of co-generation in apartment buildings with this handy tools for planners and designers beforehand.

  • PDF

가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토 (Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines)

  • 박준영;이윤건;장영식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권2호
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.