식혜(食醯) 생산(生産)라인의 공정(工程)/배치(配置) 설계(設計)에 대한 사례 연구 (A Case Study for a Process/Layout Design of a Sikhye Production Line)

  • 양문희
    • 산업공학
    • /
    • 제16권4호
    • /
    • pp.450-462
    • /
    • 2003
  • In this paper, we deal with a process and layout design for producing a planned amount of Sikhye in a given limited time period under a reasonable production schedule. We represent a Sikhye production line as a vector N, the element of which denotes the number of tanks required in each process and our objective is to find an appropriate vector which minimizes the total investment cost. We suggest a systematic method for finding an appropriate N and an appropriate layout to N. In detail, first, we decide the required sequence of processes and the required operations for each process and we estimate standard operating times. Second, constructing a precedence diagram, we find a critical path in order to reduce the total production lead time for a batch of Sikhye. Third, given a limited N space, we manage to construct manually each production schedule using both the processing times of the critical operations and transfer times. Finally, we find an optimal vector N which gives a minimum investment cost and meets both the time constraint and quantity constraint. In addition, with the estimated relative size of each tank, we suggest an appropriate conceptual layout design including an expansion area for future demands, based on the span technique used in the field of architectural design.

불확실한 환경 하에서 중간 평가가 있는 시간-비용 프로젝트 문제 (Project Time-Cost Tradeoff Problem with Milestones under an Uncertain Processing Time)

  • 최병천;정지복
    • 한국경영과학회지
    • /
    • 제38권2호
    • /
    • pp.25-42
    • /
    • 2013
  • We consider a project time-cost tradeoff problem with two milestones, where one of the jobs has an uncertain processing time. Unless each milestone is completed on time, some penalty cost may be imposed. However, the penalty costs can be avoided by compressing the processing times of some jobs, which requires additional resources or costs. The objective is to minimize the expected total costs subject to the constraint on the expected project completion time. We show that the problem can be solved in polynomial time if the precedence graph of a project is a chain.

동시공학 환경에서 자원제약이 있는 프로세스 모델의 성능분석에 관한 연구 (A Study on the Performance Analysis of Process Model with Resource Constraints in Concurrent Engineering Environment)

  • 강동진;이상용;유왕진;정용식
    • 산업경영시스템학회지
    • /
    • 제22권51호
    • /
    • pp.231-240
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload in a period of process. As a general rule, leveling the peak of workload in certain period is difficult because concurrent processing is comprised of various processes, including overlapping, paralleling looping and so on. Therefore, the workload management with resource constraints is so beneficial that effective methods to analyze design process are momentous. This study presents the Timed Petri Nets approach of precedence logic networks, and provides an alternative for users to analyze constraint processes to resolve conflicts of resources. Another approach to Continuous Time Markov Chain using Stochastic Petri Nets is also proposed. These approaches are expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

2-Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method

  • Igarashi, Kento;Yamada, Tetsuo;Inoue, Masato
    • Industrial Engineering and Management Systems
    • /
    • 제13권1호
    • /
    • pp.52-66
    • /
    • 2014
  • Promotion of a closed-loop supply chain requires disassembly systems that recycle end-of-life (EOL) assembled products. To operate the recycling disassembly system, parts selection is environmentally and economically carried out with non-destructive or destructive disassembly, and the recycling rate of the whole EOL product is determined. As the number of disassembled parts increases, the recycling rate basically increases. However, the labor cost also increases and brings lower profit, which is the difference between the recovered material prices and the disassembly costs. On the other hand, since the precedence relationships among disassembly tasks of the product also change with the parts selections, it is also required to optimize allocation of the tasks in designing a disassembly line. In addition, because information is required for such a design, the recycling rate, profit of each part and disassembly task times take precedence among the disassembly tasks. However, it is difficult to obtain that information in advance before collecting the actual EOL product. This study proposes and analyzes an optimal disassembly system design using integer programming with the environmental and economic parts selection (Igarashi et al., 2013), which harmonizes the recycling rate and profit using recyclability evaluation method (REM) developed by Hitachi, Ltd. The first stage involves optimization of environmental and economic parts selection with integer programming with ${\varepsilon}$ constraint, and the second stage involves optimization of the line balancing with integer programming in terms of minimizing the number of stations. The first and second stages are generally and mathematically formulized, and the relationships between them are analyzed in the cases of cell phones, computers and cleaners.

공정계획과 재료선정의 동시적 해결을 위한 계층구조 전문가시스템 (A Hierarchical Expert System for Process Planning and Material Selection)

  • 권순범;이영봉;이재규
    • 지능정보연구
    • /
    • 제6권2호
    • /
    • pp.29-40
    • /
    • 2000
  • Process planning (selection and ordering of processes) and material selection for product manufacturing are two key things determined before taking full-scale manufacturing. Knowledge on product design. material characteristics, processes, time and cost all-together are mutually related and should be considered concurrently. Due to the complexity of problem, human experts have got only one of the feasilbe solutions with their field knowledge and experiences. We propose a hierarchical expert system framework of knowledge representation and reasoning in order to overcome the complexity. Manufacturing processes have inherently hierarchical relationships, from top level processes to bottom level operation processes. Process plan of one level is posted in process blackboard and used for lower level process planning. Process information on blackboard is also used to adjust the process plan in order to resolve the dead-end or inconsistency situation during reasoning. Decision variables for process, material, tool, time and cost are represented as object frames, and their relationships are represented as constraints and rules. Constraints are for relationship among variables such as compatibility, numerical inequality etc. Rules are for causal relationships among variables to reflect human expert\`s knowledge such as process precedence. CRSP(Constraint and Rule Satisfaction Problem) approach is adopted in order to obtain solution to satisfy both constraints and rules. The trade-off procedure gives user chances to see the impact of change of important variables such as material, cost, time and helps to determine the preferred solution. We developed the prototype system using visual C++ MFC, UNIK, and UNlK-CRSP on PC.

  • PDF

실시간 능동 데이터베이스에서 triggering 관계를 고려한 동시성 제어 기법 (Concurrency Control Based on Triggering Relationship for Real-Time Active Database)

  • 홍석희
    • 정보처리학회논문지D
    • /
    • 제8D권1호
    • /
    • pp.10-23
    • /
    • 2001
  • 실시간 능동 데이터베이스 시스템은 외부의 환경의 변화에 반응하여 트랜잭션들을 주어진 시간 내에 처리할 수 있어야 한다. 본 논문에서는 실시간 능동 트랜잭션들을 위한 동시성 제어 기법인 다중버전 실시간 능동 동시성 제어 기법을 제안한다. 능동 규칙에 의해서 트랜잭션들 사이에는 triggering 관계가 성립하며 공유되는 데이터에 대한 충돌을 해결하기 위해 사용되는 중요한 개념이다. 제안하는 동시성 제어 기법은 데이터 충돌에 포함된 트랜잭션들 사이의 triggering 관계와 우선순위, 선행관계 등을 참조하여 데이터 충돌을 해결한다. 우선순위가 높은 트랜잭션은 낮은 우선순위의 트랜잭션 보다 유리한 서비스를 받는다. 그러나, 낮은 우선순위의 트랜잭션이라도 종료시점에 근접했다면 철회됨으로서 낭비될 시스템 자원을 보존하기 위해서 유리한 서비스를 받을 수 있다. 또한, 트랜잭션들 사이의 triggering 관계를 기반으로 intra triggering 충돌과 inter triggering 충돌로 분류해 각각 다른 방식으로 데이터 충돌을 해결한다. 본 논문에서는 모의실험을 통해서 제안한 동시성 제어기법의 성능을 비교 평가하였다.

  • PDF

OCL을 이용한 자동화된 코드스멜 탐지와 리팩토링 (Automated Code Smell Detection and Refactoring using OCL)

  • 김태웅;김태공
    • 정보처리학회논문지D
    • /
    • 제15D권6호
    • /
    • pp.825-840
    • /
    • 2008
  • 리팩토링은 내부적으로는 시스템의 품질을 개선하고, 외부적으로는 시스템의 기능을 유지하는 일종의 소프트웨어를 변경하는 과정이다. 이러한 리팩토링을 적용하여 기존 소스코드를 개선하기 위해서는 개선할 사항이 무엇인지를 아는 것이 우선이다. 이를 위해 Martin Fowler와 Kent Beck은 코드속의 나쁜 냄새(코드스멜)를 식별할 수 있는 방법을 제시 하였다. 또한 코드스멜을 탐지하고 어디에 어떤 리팩토링을 적용할 것인가를 결정하는 문제와 관련된 몇몇 연구가 발표되었다. 그러나 이러한 연구들은 코드스멜에 대한 명확한 표현이 부족하거나 한정된 코드스멜만을 탐지하는 단점이 있다. 그리고 리팩토링을 적용할 경우 행위보존을 위한 선행조건들의 표현방법이 리팩토링 절차에 포함되어 있거나 정형화되지 않아 행위보존의 모호함이 발생되는 단점을 가지고 있다. 이에 본 논문에서는 OCL을 이용하여 코드스멜의 정보를 정확히 명세화하고, OCL 번역기를 통해 코드스멜을 자동으로 탐지하여 리팩토링하는 프레임워크를 제안한다. 또한 적용사례를 통하여 자바소스코드속의 코드스멜을 OCL로 명세화하여 자동탐지하고, 리팩토링을 적용해 봄으로써 활용성과 효용성을 검증해본다.

프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM) (Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time)

  • 장성용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.68-74
    • /
    • 2007
  • CCPM(Critical Chain Project Management)은 기존의 사업관리 방법론인 PERT/CPM의 장점을 살리고 단점을 보완한 것으로서 각 과업의 예상 작업시간을 여유시간(padding)을 제거한 평균작업시간을 사용하고 핵심자원(Bottleneck)의 자원경합을 해소한 후 크리티컬 체인을 결정하고 일정계획을 수립하되, 각 과업의 여유시간의 일정 부분을 크리티컬 체인의 뒤에 공통의 프로젝트 버퍼(buffer)로 두어 일정관리 상의 변동을 흡수할 수 있도록 고안되었다. 또한 크리티컬체인에 포함되지 않은 비크리티컬 체인에 속한 과업들이 전체 일정의 지연을 초래하는 것을 방지하기 위해 공급버퍼를 두어 변동을 흡수할 수 있도록 하였으며, 자원의 조달 상의 불확실성을 완화하기 위해 자원 버퍼를 두고 있다. 프로젝트 버퍼 빛 공급 버퍼 관리를 통해 일상적인 일반변동 요인(common cause variation)에 일정 지연 흡수뿐 아니라 특별변동 요인(special cause variation)에 의한 위험의 관리 및 완화가 가능하도록 되어 있다. 프로젝트 버퍼 및 공급버퍼의 크기는 일반적으로 해당 체인의 전체 길이 1/2을 사용한다. 버퍼관리가 프로젝트 실행 및 통제 매커니즘으로 활용된다. 버퍼관리에서는 버퍼길이를 OK 영역, 주시 및 계획 영역 그리고 행동영역으로 나누고, 프로젝트 상태가 주시 및 계획 영역에 진힙하게 되면 위험상태에 대비해서 비상조치계획을 수립하며, 행동역역에 들어가게 되면 계획된 비상조치계획을 실행함으로써 일정지연을 만화하게 된다. CCPM에서는 작업자들은 자신의 작업을 최선을 다해 열심히 일하고 과업 종료시 즉시 프로젝트 책임자에게 보곰함으로써 후속 과업이 조기에 작업을 개시할 수 있는 릴레이경주 방식의 작업 메커니즘을 따르도록 요청받게 된다. 또한 일정 지연의 가장 큰 주범인 멀티태스킹 작업은 철저하게 금지되도록 관리한다.