A Experimental Study on Structural Behavior of Hybrid Precast Concrete Panel (복합 프리캐스트 콘크리트 패널의 구조 거동에 대한 실험적 연구)

  • Lee, Sang-Sup;Park, Keum-Sung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.9
    • /
    • pp.11-18
    • /
    • 2018
  • As the height of the modular buildings increases, their stability becomes more and more dependent on the core. All traditional construction methods in structural concrete and steel can be utilized for cores in modular buildings but a core system with dry connection is more desirable to complete a greater degree of factory finish and faster erection of modular buildings. In order to do that, the hybrid PC(precast concrete) panel, which has a pair of C-shaped steel beams combined at the top and bottom of a concrete wall, was developed, In this study the cyclic lateral loading test on the hybrid PC panel is carried out and the panel configurations are examined to enhance the structural performance in comparison with the RC wall. Experimental results show that the strength of hybrid PC panel is about 70% of thar ot RC wall and the anchorage of vertical reinforcing bar welded to C-shaped steel beam needs to be improved.

Performance Assessment of Precast Concrete Segmental Bridge Columns with Shear Resistance Connecting Structure (전단저항 연결체를 갖는 프리캐스트 세그먼트 교각의 성능평가)

  • Kim, Tae-Hoon;Kim, Young-Jin;Kim, Seong-Woon;Shin, Hyun-Mock
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.591-601
    • /
    • 2008
  • The purpose of this study was to investigate the performance of precast concrete segmental bridge columns with shear resistance connecting structure. The system can reduce work at a construction site and makes construction periods shorter. A model of precast concrete segmental bridge columns with shear resistance connecting structure was tested under a constant axial load and a cyclically reversed horizontal load. A computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures was used. An bonded or unbonded tendon element based on the finite element method, that can represent the interaction between tendon and concrete of prestressed concrete member, is used. A joint element is newly modified to predict the inelastic behaviors of segmental joints. The proposed numerical method gives a realistic prediction of performance throughout the loading cycles for several test specimens investigated.

A Test Study on the Static/Dynamic Response of PC Structures According to the Connection Method and Damage Degree of PC Concrete Structures for Rapid Application of PC Concrete Construction Around Railway Stations (철도정거장 주변 PC 콘크리트 급속 시공 적용을 위한 PC 콘크리트 구조물 연결 방법 및 손상 정도에 따른 PC 구조물 정적/동적 응답에 대한 실험적 연구)

  • Park, Chang-Jin;Jeong, Han-Jung;Park, Yong-Gul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.5
    • /
    • pp.53-60
    • /
    • 2020
  • In this study, smart precast-in-place concrete, such as continuity with Precast any technology that can be the Application of Building Structures and railway stations, civil structures. After the same way in the field installation design based on the criteria railways and derived the right section, through the Static and Dynamic Response Analysis. Dynamic sensor and the triaxial acceleration measured by attaching the sensor acceleration response according to the extent of the damage of Precast Panel Structures and mode of Precast Structures, by comparing the data. Data for the stability and improvement of the uncertainty in along a railroad and Future of Precast Panel Structures of time to replace. This is to use this data as basic data on damage prediction.

Influence of connection detailing on the performance of wall-to-wall vertical connections under cyclic loading

  • Hemamalini, S.;Vidjeapriya, R.
    • Advances in concrete construction
    • /
    • v.9 no.5
    • /
    • pp.437-448
    • /
    • 2020
  • In high rise buildings that utilize precast large panel system for construction, the shear wall provides strength and stiffness during earthquakes. The performance of a wall panel system depends mainly on the type of connection used to transfer the forces from one wall element to another wall element. This paper presents an experimental investigation on different types of construction detailing of the precast wall to wall vertical connections under reverse cyclic loading. One of the commonly used connections in India to connect wall to wall panel is the loop bar connection. Hence for this study, three types of wet connections and one type of dry connection namely: Staggered loop bar connection, Equally spaced loop bar connection, U-Hook connection, and Channel connection respectively were used to connect the precast walls. One third scale model of the wall was used for this study. The main objective of the experimental work is to evaluate the performance of the wall to wall connections in terms of hysteretic behaviour, ultimate load carrying capacity, energy dissipation capacity, stiffness degradation, ductility, viscous damping ratio, and crack pattern. All the connections exhibited similar load carrying capacity. The U-Hook connection exhibited higher ductility and energy dissipation when compared to the other three connections.

A study on the Shrinkage Properties of precast concrete using Calcium hardening accelerator (칼슘계 경화촉진제를 사용한 프리캐스트 콘크리트의 수축특성에 관한 연구)

  • Min, Tae-Beom;Jo, In-Seong;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.44-45
    • /
    • 2014
  • On this study, initial crack index was evaluated by performing FEM analysis to crack propagation from hydration heat for development of precast concrete. On the result, as increased the usage of hardening accelerator, initial compressive strength were improved and setting time also was shortened. Additionally, central temperature of concrete was increased, the reaching time for the highest temperature could be shortened. By the result to assess crack index, there was no problem about crack despite of growth of initial high hydration heating. This result guessed because of small size element when analyzed trough FEM, realization for mass concrete's crack index should be performed.

  • PDF

A Study to Analyze the Assembly Process of Precast Concrete Wall Panels in Beam-Column Frame Apartment Buildings (보-기둥구조 PC공동주택 PC벽체의 조립공정 분석 연구)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Min-Jun;Lee, Dong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.495-506
    • /
    • 2024
  • Unlike reinforced concrete(RC) construction, the primary determinant of construction schedule for precast concrete(PC) apartment buildings is the lifting equipment. To establish a dry process-centric construction schedule, this study analyzes the lifting unit process for core, internal, and external PC wall components, which differ from traditional PC components. By examining the assembly process of these wall types, the study aims to determine the construction cycle for a standard floor frame of a PC apartment building. The findings will serve as foundational data for developing construction schedules for PC apartment buildings utilizing PC walls.

A Study of Analysis and Improvement Measures for Productivity in PC Project (PC공사의 생산성 분석 및 향상방안에 관한 연구)

  • Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.96-97
    • /
    • 2013
  • PC(Precast Concrete) technology has been widely used for reduction of construction period and manpower in domestic construction industry since it was introduced from advanced countries in the 1960s. But most of existing researches are shortage of research which proves the efficiency of PC methods quantitatively. Therefore, this study analyzed productivity targeting construction site workers who are working on projects using the PCF(Precast Concrete Frame) system out of PC methods that is used most typically in construction sites, and in order to provide basic data to prove the efficiency of PC project quantitatively.

  • PDF

A Study on the Development of Assembling Soil Nailing Method and Its Applications (조립식 쏘일네일링 공법의 개발과 시험시공사례에 관한 연구)

  • Kwon, Young-Ho;Park, Shin-Young;Ryu, Jeong-Soo;Gang, In-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.113-120
    • /
    • 2005
  • Soil nailing system can be mentioned to a method of supporting as the shear strength of in-situ soils is increased by passive inclusions. In the general soil nailing system, facing walls are used in two kind of a lattice concrete block or a cast in placed concrete wall. A case of lattice concrete blocks is used in slow slopes greater than 1:0.7. Also, a case of a cast in placed concrete wall is used in steep slopes less than 1:0.5. The cast in placed concrete walls are constructed to 30cm thick together with a shotcrete facing. In this study, the assembling soil nailing method as a new soil nailing system is proposed. This method is constructed assembly using precast concrete panels. Therefore ability of the construction and quality of the facings can be modified than a usual soil nailing system. Also, this method can be obtained the effects that a global slope stability increase, as precast concrete panels is put on cutting face after excavating a slope.

  • PDF

A basic study of steel-joint connection method of composite precast concrete members (합성 PC부재의 Steel-joint Connection Method 개발 기초연구)

  • Kim, Geun-Ho;Lee, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.10-11
    • /
    • 2013
  • Green Frame is a column-beam system formed by composite precast concrete column and beam connected with steel buried in both members. During the installation of Green columns, the columns of Green Frame, covering 3 floors per each piece and beams, the eccentricity can be observed due to the construction error and the weight of beam itself. Such eccentricity may have a little influence on a single frame, yet, it can develop critical issues to the installation of subsequent beams or beams on the upper floors in the context of a building as a whole that has multiple frames. These issues lead to delay in frame installation, decrease of productivity and increase of cost, etc. Therefore, this study presents a steel-joint connection method in order to solve the issues. The steel-joint connection method exists on slope plane and reinforcing plate in steel frame buried in composite PC members. Through this method, the issues can be resolved without requiring additional equipment or manpower.

  • PDF

A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members (PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구)

  • Son, Seung-Hyun;Kim, Ki-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF