• Title/Summary/Keyword: precast structures

Search Result 285, Processing Time 0.021 seconds

Structural behavior of precast concrete deck with ribbed loop joints in a composite bridge

  • Shin, Dong-Ho;Chung, Chul-Hun;Oh, Hyun-Chul;Park, Se-Jin;Kim, In-Gyu;Kim, Young-Jin;Byun, Tae-Kwan;Kang, Myoung-Gu
    • Smart Structures and Systems
    • /
    • v.17 no.4
    • /
    • pp.559-576
    • /
    • 2016
  • This study is intended to propose a precast bridge deck system, which has ribbed loop joints between the decks and lacks internal tendons to improve the workability of existing precast deck system. A composite bridge deck specimen was fabricated using the proposed precast deck system, and static and fatigue load tests were conducted to evaluate the structural behavior and the crack pattern of the deck. Leakage test of the deck joints was also conducted and finite element analysis was carried out to compare with the test results.

Design of Prestress for prefabricated bridge piers (조립식 교각의 프리스트레스 설계)

  • Kim, Hyun-Ho;Shim, Chang-Su;Chang, Chul-Hun;Kim, Cheol-Hwan;An, Dong-Geun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.225-228
    • /
    • 2006
  • Fast construction of bridge structures is a new trend of bridge design. Accelerated bridge construction includes the construction of superstructures and substructures. In order to reduce the construction time for substructures, precast prestressed bridge piers are increasingly applied in other countries. One of the main concern in the design of precast piers is the determination of the axial prestress forces. The behavior of the piers should be investigated under service loadings and ultimate conditions. In this paper, the magnitude of prestress is calculated to control the stress at the joint of precast piers. Considering long-term behavior of prestressed piers, P-M diagrams for precast piers are obtained to verify the ultimate behavior of the piers. Based on these studies, precast piers are applied to the light-railway bridge piers.

  • PDF

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • v.13 no.4
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.

An Experimental Study of Precast Concrete Alters Cement Types of High-Strength Concrete (시멘트종류를 변화시킨 프리캐스트 고강도 콘크리트의 실험적 연구 - 압축강도특성을 중심으로 -)

  • Park, Heung-Lee;Ki, Jun-Do;Kim, Sung-Jin;Lee, Hoi-Keun;Park, Byung-Keun;Jung, Jang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.65-68
    • /
    • 2009
  • Recently, as architectural concrete structures become high-rise and megastructured, concrete become high-strengthened and, by ensuring products of more stability, and rationalization of construction are required.large cross-sectional precast concrete members such as columns show large temperature increase in manufacturing process not only by external heating but also by concrete itself's hydration heating. Therefore, it is expected that specimen for management to predict strength and compression strength of precast concrete member shows different strength characteristics. Concerning this, in order to suggest strength characteristics of high strength mass concrete suitable for precast concrete application, this study comprises the inclusive investigations on the relations between core strength and the strength characteristics per member cross-section dimensional value and per water-bonding material ratio value.

  • PDF

Durability Comparison of Precast Segment Lining and Cast-in-place Concrete Lining (프리캐스트 세그먼트 라이닝과 현장 타설 콘크리트 라이닝의 내구성 비교)

  • Gyuphil Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.13-18
    • /
    • 2023
  • Cast-in-place concrete lining is commonly used in tunnel lining, but cast-in-place concrete lining has problems with construction and quality control. Precast segment lining is being used to solve these problems. In general, precast segment lining is known to have improved durability and easy maintenance such as rehabilitation of structures. This study compared the durability of 22 tunnel linings constructed with precast segments or cast-in-place reinforced concrete.

Stress Analysis of Precast Concrete Large Panel Structures Taking Account of Stiffness of Vertical Joints (수직접합부 강성을 고려한 프리캐스트 콘크리트 대형판구조물의 응력해석)

  • 장극관;이한선;신영식;류진호
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.149-156
    • /
    • 1993
  • Precast concrete (P.C.) large panel structures have usually weaker stiffness at joints than that of monolithic in-situ reinforced concrete structures. But structural designers do not in general take into account this characteristics of P. C. large panel structures and use the same analytical models as for the monolithic structure. Therefore, the results of analysis obtained by using these models may be quite different from those actually occuring in real P.C. structure. In this study, the change in force and stress distribution and deflections of structure caused by applying lower shear stiffness at vertical joints are investigated through trying several finite element modeling schemes specific for P.C. structures. Finally, for engineers in practice. a simplified model, which takes account of the effect of lower shear stiffness at vertical joints, is proposed with the understanding on possible amount of errors.

  • PDF

The Experimental study on the behavior of precast Girder-Infilled Steel Tube Column joint (프리캐스트 보와 충전형 강관 기둥 접합부의 거동에 관한 실험적 연구)

  • 정재우;박성무
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.10a
    • /
    • pp.317-322
    • /
    • 1995
  • This study is to examine the usefulness in using precast girder-infilled steel tube column in reinforced concrete structures through the analysis of the test results, in order to develope the new composite structural system using precast girder-Infilled steel tube column, The variables of specimen are strength of concrete, the numble of hoops, the form of beam-column The variables of specimen are strength of concrete, the number of hoops, the form of beam-column joints. By raising strength of concrete and incresing number of hoops in beam-column joint, it becomes clear to take similar structure capacity to monolithic structures.

  • PDF

Modelling and integrity assessment of shear connectors in precast cast-in-situ concrete bridges

  • Moyo, Pilate;Sibanda, Bongani;Beushausen, Hans
    • Structural Engineering and Mechanics
    • /
    • v.42 no.1
    • /
    • pp.55-72
    • /
    • 2012
  • Precast-cast insitu concrete bridge construction is widely practiced for small to medium span structures. These bridges consist of precast pre-stressed concrete beams of various cross-sections with a cast in-situ reinforced concrete slab. The connection between the beams and the slab is via shear links often included during the manufacturing process of the beams. This form of construction is attractive as it provides for standardisation, reduced formwork and construction time. The assessment of the integrity of shear connectors in existing bridges is a major challenge. A procedure for assessment of shear connectors based on vibration testing and finite element model updating is proposed. The technique is applied successfully to a scaled model bridge model and an existing bridge structure.

Evaluation of Structural Behavior of Precast-Concrete Column and H-Beam using Non-linear Finite Element Analysis (비선형 유한요소해석을 이용한 PC 기둥-H 형강보의 구조거동 분석)

  • Park Jeong-sim;Park Soon-kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.425-428
    • /
    • 2004
  • Nonlinear finite element analysis is conducted to predict the structural behavior of precast concrete column and steel beam connected by using bolted connections. The Nonlinear FEM program is based on the modified compression field theory which has good accuracy in the concrete structures. The link element is properly used to model the discontinuity between precast concrete column and steel beam. Predictions from the proposed model are compared with experimental results and it is concluded that structural behaviors of the composite structures, such as strength capacity, crack pattern and failure mode, can be predicted quite successfully.

  • PDF

Analysis on the Shear Behavior of Existing Reinforced Concrete Frame Structures Infilled with L-Type Precast Wall Panel (L형 프리캐스트 콘크리트 벽패널로 채운 기존 철근 콘크리트 골조 구조물의 전단 거동 분석)

  • Yu, Sung-Yong;Ju, Ho-Seong;Ha, Soo-Kyoung
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.2
    • /
    • pp.105-117
    • /
    • 2015
  • The purpose of this study is to develop a new seismic resistant method by using precast concrete wall panels for existing low-rise, reinforced concrete beam-column buildings such as school buildings. Three quasi-static hysteresis loading tests were experimentally performed on one unreinforced beam-column specimen and two reinforced specimens with L-type precast wall panels. The results were analyzed to find that the specimen with anchored connection experienced shear failure, while the other specimen with steel plate connection principally manifested flexural failure. The ultimate strength of the specimens was determined to be the weaker of the shear strength of top connection and flexural strength at the critical section of precast panel. In this setup of L-type panel specimens, if a push loading is applied to the reinforced concrete column on one side and push the precast concrete panel, a pull loading from upper shear connection is to be applied to the other side of the top shear connection of precast panel. Since the composite flexural behavior of the two members govern the total behavior during the push loading process, the ultimate horizontal resistance of this specimen was not directly influenced by shear strength at the top connection of precast panel. However, the RC column and PC wall panel member mainly exhibited non-composite behavior during the pull loading process. The ultimate horizontal resistance was directly influenced by the shear strength of top connection because the pull loading from the beam applied directly to the upper shear connection. The analytical result for the internal shear resistance at the connection pursuant to the anchor shear design of ACI 318M-11 Appendix-D except for the equation to predict the concrete breakout failure strength at the concrete side, principally agreed with the experimental result based on the elastic analysis of Midas-Zen by using the largest loading from experiment.