Seismic performance assessments of precast energy dissipation shear wall structures under earthquake sequence excitations

  • Zhang, Hao;Li, Chao;Wang, Zhi-Fang;Zhang, Cai-Yan
    • Earthquakes and Structures
    • /
    • v.18 no.2
    • /
    • pp.147-162
    • /
    • 2020
  • This paper presents a novel precast energy dissipation shear wall (PEDSW) structure system that using mild steel dampers as dry connectors at the vertical joints to connect adjacent wall panels. Analytical studies are systematically conducted to investigate the seismic performance of the proposed PEDSW under sequence-type ground motions. During earthquake events, earthquake sequences have the potential to cause severe damage to structures and threaten life safety. To date, the damage probability of engineering structures under earthquake sequence has not been included in structural design codes. In this study, numerical simulations on single-story PEDSW are carried out to validate the feasibility and reliability of using mild steel dampers to connect the precast shear walls. The seismic responses of the PEDSW and cast-in-place shear wall (CIPSW) are comparatively studied based on nonlinear time-history analyses, and the effectiveness of the proposed high-rise PEDSW is demonstrated. Next, the foreshock-mainshock-aftershock type earthquake sequences are constructed, and the seismic response and fragility curves of the PEDSW under single mainshock and earthquake sequences are analyzed and compared. Finally, the fragility analysis of PEDSW structure under earthquake sequences is performed. The influences of scaling factor of the aftershocks (foreshocks) to the mainshocks on the fragility of the PEDSW structure under different damage states are investigated. The numerical results reveal that neglecting the effect of earthquake sequence can lead to underestimated seismic responses and fragilities, which may result in unsafe design schemes of PEDSW structures.

Experimental Study On shear Capacity of P.C Vertical Joints (P.C 수직접합부의 전단내력에 대한 실험연구)

  • 김원종;김상식;지호청
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.362-367
    • /
    • 1994
  • In Precast Concrete Structure, safety of structure depends on strength of joint. Asa result, there exists a necessity to review the effects of elements consisting joints, since these elements are important factors for evalaution of joint strength. However, there elements are different for construction methods and may be changed even during construction. Obviously, the change of elements can cause the change of joint strength; yet, the effects of the variables are not clearly defined. The behavior of the joints are complicated and evaluated only through experiments. Consequently, the main objective of this paper is to review effects of components consisting Precast Joints, I order to keep higher joint strength than specified in the design code.

  • PDF

A Study on Manufacturing and Experimental Techniques for the 1/5th Scale Model of Precast Concrete Large Panel Structure (프리캐스트 콘크리트 대형판 구조물의 1/5 축소모델 제작 및 실험기법 연구)

  • 김상규;이한선
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.10a
    • /
    • pp.198-203
    • /
    • 1995
  • The objective of this study is to provide the information on the techniques of manufacturing and experiment in small scale modeling of precast concrete(P.C.)large panel structures. The adopted scale was 1/5th 4types of experiments were performed : material tests for model concrete and model reinforcement, compressive test of horizontal joint, shear test of vertical joint and cyclic static test of 2-story subassemblage structure. Based on the experimental results, the following conclusions are drawn: (1)Model concrete may have in general larger compressive strength than expected. (2) Model reinforcement can show less ductility if the annealing processes were performed without using vaccuum tube. (3) Failure modes of horizontal and vertical joints were almost same for both prototype and model. But the strength of model appears to be higher than required by similitude law. (4)Hysteretic behavior of 1/5 scale subassemblage model can be made quite similar to prototype's if the ductility of model reinforcement and compressive strength of model concrete could be representative of those of prototype.

  • PDF

An Application of Precast Concrete System for Steel Framed Residential Buildings and PC Framed System for Parking Structure (철골조 아파트의 PC 공법 적용성 및 지하주차장의 골조 PC 공법)

  • 김영수;김정연;임인혁;김두영;장월선
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.903-910
    • /
    • 2000
  • Because the construction type SFRB is completely different in comparison with that of RC apartment the construction and work process, which are currently used, have to be changed. The main purpose of study is to analyze the difficulties of this construction and to apply the technology for other construction area. In this study, it is investigated to the problems of construction for SFRB and the construction method of PC panel fabricated on SFRB in Yongin goosng. Later, it is estimated prefabricated method had an great effect on PC panel System as lower cost and shorter schedule in SFRB. The Precast concrete framed System has many merit than the reinforced concrete structures system at constructability, structural safety and quality, therefore, it will be widely applied at parking structure in the future.

  • PDF

Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure (초대형 건축물의 PC부재 양중작업 사례연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method (LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구)

  • Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF

Application of Hybrid Structural System Using Coupled Vibration Control Structure and Seismic Isolated Structure in High-Rise Building

  • Nakajima, Shunsuke
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.219-227
    • /
    • 2021
  • This building is a forty-eight story, 170 meters high multiple dwelling house with Dual Frame System (DFS), a coupled vibration system connecting two independent structures with hydraulic dampers. Generation of large deformation between two structures during earthquakes contributes to make the hydraulic dampers effective. To improve the aseismic performance more, this building adopts DFS hybrid system that consists of DFS and base isolation system. About typical floors, columns and beams are constructed with LRV precast concrete method that shorten the construction period greatly by integrating column-beam joints in column members.

Experimental study on shear performance of partially precast Castellated Steel Reinforced Concrete (CPSRC) beams

  • Yang, Yong;Yu, Yunlong;Guo, Yuxiang;Roeder, Charles W.;Xue, Yicong;Shao, Yongjian
    • Steel and Composite Structures
    • /
    • v.21 no.2
    • /
    • pp.289-302
    • /
    • 2016
  • A new kind of partially precast or prefabricated castellated steel reinforced concrete beam, which is abbreviated here as CPSRC beam, was presented and introduced in this paper. This kind of CPSRC beam is composed of a precast outer-part and a cast-in-place inner-part. The precast outer-part is composed of an encased castellated steel shape, reinforcement bars and high performance concrete. The cast-in-place inner-part is made of common strength concrete, and is casted with the floor slabs simultaneously. In order to investigate the shear performance of the CPSRC beam, experiments of six CPSRC T-beam specimens, together with experiments of one cast-in-place SRC control T-beam specimen were conducted. All the specimens were subjected to sagging bending moment (or positive moment). In the tests, the influence of casting different strength of concrete in the cross section on the shear performance of the PPSRC beam was firstly emphasized, and the effect of the shear span-to-depth ratio on that were also especially taken into account too. During the tests, the shear force-deflection curves were recorded, while the strains of concrete, the steel shapes as well as the reinforcement stirrups at the shear zone of the specimens were also measured, and the crack propagation pattern together with the failure pattern was as well observed in detail. Based on the test results, the shear failure mechanism was clearly revealed, and the effect of the concrete strength and shear span-to-depth ratios were investigated. The shear capacity of such kind of CPSRC was furthermore discussed, and the influences of the holes on the steel shape on the shear performance were particularly analyzed.

Reversed Cyclic Loading Test of Post-Tensioned Precast Concrete Beam-Column Connections with 2400MPa Prestressing Strands (2400MPa 긴장재가 적용된 포스트텐션 프리캐스트 콘크리트 보-기둥 접합부의 반복가력실험)

  • Hwang, Jin-Ha;Choi, Seung-Ho;Lee, Deuck Hang;Kim, Kang Su;Woo, Woon Tack
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.45-52
    • /
    • 2017
  • The precast concrete (PC) method has many advantages in fast construction, quality control, etc. In domestic construction market, however, its application has been quite limited because of the concerns about structural integrity and seismic performances due to the discrete connections between precast concrete members. By applying the post-tensioning method, the precast beam-column connection can be well tightened, allowing improved structural integrity, and proper seismic performances can be also achieved. In this study, reversed cyclic tests have been conducted on the beam-column connection specimens, where the test variables included the compressive strength of grouting mortar and the tensile strengths of prestressing strands, based on which their seismic performances have been examined in detail. The post-tensioned PC beam-column connections showed good seismic performances comparable to that of the monolithic reinforced concrete connection specimen. When 2400 MPa prestressing strands are applied to the beam-column connection, it is preferable to adjust the prestress level similar to that applied for the 1860 MPa prestressing strands to avoid premature local crushing failures at the beam-column connections.