• Title/Summary/Keyword: pre-project planning phase

Search Result 17, Processing Time 0.023 seconds

A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects (건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구)

  • Min, Kyung-Min;Ham, Nam-Hyuk;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan (전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로)

  • Sung, Hyun-Chan;Kim, Kwi-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA (IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석)

  • Ha, Sung-Wook;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.59-67
    • /
    • 2015
  • Overseas expansion of domestic construction over the past 10 years has been fast growing. But as a result of simple construction business practices and a focus on EPC, sales margins was reduced. Domestic construction companies have been trying to redirect business to high-value-added-areas but have faced difficulty because there areas are current monopolized by global leading companies in the field of PMC. They have recently carried out 16 PMC related project in order to expand their experience and increase their competitiveness. Most of these construction companies that do PMC overseas have been focusing on the civil engineering sector. analyzing the important and performance result 50 separate PMC tasks in detail using IPA, it became clear that domestic construction companies should also focus on tasks and were analyzed in order to advance to overseas architecture PMC sector overseas. There are large gaps in the importance and performance result of both the planning and pre-construction phase. Importance compared to the current performance levels in the planning phase gap is largest, pre-construction phase has been analyzed in the following order. In particular, one should strengthen detailed tasks in the planing phase. This study is expected to be used as a basic to determine the performance level and tasks items. It is expected strengthen the capacities of domestic companies in the PMC field, for especially in the high value-aded-areas as indicated in the results of the analysis from this study.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF