• Title/Summary/Keyword: power resource

Search Result 1,511, Processing Time 0.063 seconds

The AQR Control in the SCADA System of Manless Power Plant (무인발전소 SCADA SYSTEM 에서의 AQR 제어 운영)

  • Ok, Yeon-Ho;Lee, Eun-Woong;Byun, Ill-Hwan;Kim, Ki-Won;O, Seok-Yeong;Choi, Hyeong-Cheol;Lee, Nam-Hyung
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.58_59
    • /
    • 2009
  • Generator excitation system, supplying the voltage to power system, is controlled by various manners as aspects of power system. Previously excitation systems mainly used AVR(Automatic Voltage Regulator) and FCR(Field Current Regulator) to control voltage, but nowadays the excitation systems have the tendency to adopt AQR(Automatic Reactive power Regulator) and APFR(Automatic Power Factor Regulator) to do it so as to get into step with diverse requirements of power system and high digital technology. This paper presents which operation methods is effective for the equipment, according to increase the unmanned power station thanks to automation technic.

  • PDF

The Study on the Human Resource Forecasting Model Development for Electric Power Industry (전력산업 인력수급 예측모형 개발 연구)

  • Lee, Yong-Suk;Lee, Geun-Joon;Kwak, Sang-Man
    • Korean System Dynamics Review
    • /
    • v.7 no.1
    • /
    • pp.67-90
    • /
    • 2006
  • A series of system dynamics model was developed for forecasting demand and supply of human resource in the electricity industry. To forecast demand of human resource in the electric power industry, BLS (Bureau of Labor Statistics) methodology was used. To forecast supply of human resource in the electric power industry, forecasting on the population of our country and the number of students in the department of electrical engineering were performed. After performing computer simulation with developed system dynamics model, it is discovered that the shortage of human resource in the electric power industry will be 3,000 persons per year from 2006 to 2015, and more than a double of current budget is required to overcome this shortage of human resource.

  • PDF

A Power Factor Analysis due to Interconnecting Photovoltaic Resource (계통연계형 태양광전원 투입에 따른 역률 분석)

  • Kim, Sang-Hyub;Rhee, Sang-Bong;Lyu, Seung-Heon
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.503-505
    • /
    • 2008
  • Photovoltaic(PV) resource connected in the power system can be affect to the power quality. To analyze the power quality, this paper simulate the variation of power factor by PV resource connected to the low voltage system. The power factor calculator and full-bridge inverter of PV system are modeled by EMTP/MODELS. Simulation results according to the PV capacity and load are presented.

  • PDF

A Study on the Marital Power processes Perceived by Korean Urban Husbands (한국도시 남편이 지각한 부부권력 과정에 관한 연구-권력자원과 권력 과정을 중심으 로-)

  • 이정연
    • Journal of Families and Better Life
    • /
    • v.9 no.2
    • /
    • pp.267-284
    • /
    • 1991
  • The Purpose of this study is to explain marital power processes perceived by Korean urban husbands. To do the task, this study examined the possibility of classifying the power processes and the effect of resources by using resource theory and normative resource theory . The main results were as follows. 1) Power precesses are classified into five factors, such as, 'induction'. 'isolation' quarreling' 'carelessness' and 'withdrawal of love'. Induction, which makes control attempts by using verbal, indirect communication strategies, is proved to be the most factor. 2) Power resource variables are proved to be significant in their effects on the power processes. That is, objective are proved to be significant in their effects on the power processes. That is , objective resources are influencing on 'induction' and 'isolation' behavior and subjective variables are influencing on the other control attempts, Thus, it is found that including subjective variables as well as objective ones is very important. Above all, that the concept of the centrality of patriarchy is supported to be an appropriate concept for the study on the marital power processes i8s a fruitful result in research. But the variances explained by resource variables are relatively small. It is suggested. therefore, further study should include more significant subjective resource variables.

  • PDF

Tidal Power Station Excitation System for a Considering Wave Characteristic (파랑특성을 고려한 조력발전소 여자시스템 적용에 관한 연구)

  • Kim, Hyun-Han;Kim, Kwang-Ho;Jeong, Jong-Chan;Park, Sung-Ho;Ok, Yeon-Ho;Choi, Hyung-Chol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.251-252
    • /
    • 2008
  • Si-Hwa tidal power station is using difference of the ebb and flow. The active power is dependent on up and down sea water level but if it is drastically changed because of a typhoon or waves the generator terminal voltage and active power is changed that is a chief cause of power station unstability. Therefore this paper arrange a present state of power or frequency fluctuation and generator terminal phase difference in case of occurrence a drastic change of sea water level.

  • PDF

Feasibility for the Application of Wind Power Energy in SI WHA (시화지구의 풍력에너지 활용 가능 타당성)

  • Hong, Yeong-Jae;Chae, Ji-Seog;Kim, Hee-Gon;Kim, Ki-Won;Lee, Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1725-1727
    • /
    • 2005
  • Korea Water Resource Corporation is planning the active application on the New-Renewable energy enterprise at Si-Wha region which is located in Kyonggi-Do, builded up as the national policy enterprise and also currently carrying out a tidal electric power station construction. This research is considered of geography circumstance of the region. We are to analyze a wind power resources application feasibility in the side of economical efficiency and see simultaneously application of the wind power system also.

  • PDF

Resource Assessment of Tidal Current Energy Using API in Korea (API를 적용한 국내 조류에너지 잠재량 추정)

  • Jo, Chul-Hee;Lee, Kang-Hee;Cho, Bong-Kun;Hwang, Su-Jin
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.1
    • /
    • pp.75-81
    • /
    • 2016
  • The west and south coastal regions of Korea are known to be of strong tidal current speed. With the increasing demand for renewable energies, the resource assessment has been a crucial issue which should be conducted before any detail planning and development of the potential sites for tidal current farm. Although there are several results of resource assessment of tidal current energy in Korea, the resource assessment method is not officially announced. This undefined methodology makes the results unreliable and useless. Recently new renewable energy potential definition has been announced by KIER (Korea Institute of Energy Research). This categorizes energy potential as four steps; theoretical, geographical, technical and market potentials. This paper describes the resource assessment of tidal current power in Korea based on API (Averaged Power Intercepted). The results show that the Incheon-Gyeonggi and Jeollanam-do are very promising areas for tidal current power in Korea.

The Analysis about Trouble of GOVERNOR (속도 및 제어시스템의 부조화에 따른 조속기 에러 원인 분석)

  • Ok, Yeon-Ho;Oh, Sueg-Young;Kim, Ki-Won;Byun, Ill-Hwan;Go, Young-Hwan;Im, Seung-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.252-253
    • /
    • 2011
  • Many errors are broken out when hydro power plants are operating connected to electric power system. To minimize ripple effects of accidents, a hydro power plant is separated by a circuit breaker consisting of each protection equipments. In this paper, I will analyze a cause of abnormal events of emergency stop and therefore I take measures and suggest solutions for similar cases.

  • PDF

Estimation Method of Small Hydro Power Potential Using a Resource Map (자원지도에 의한 소수력 잠재량 산출)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.322-326
    • /
    • 2008
  • This paper presents an estimation method of small hydro power(SHP) potential using a SHP resource map. As a basic unit of SHP energy potential at a certain area, capacity and annual energy production of unit head was calculated from the catchment area given by a SHP resource map which was established by numerical hydrologic simulation so that a logical and relatively accurate potential estimation was possible comparing with the performance analysis model for SHP sites. The performance characteristics for Samok-Ri site were analyzed, using the SHP resource map and the developed model. It was found that the SHP resource map and the developed model is useful tool to estimate SHP potential.

  • PDF

A Study on Developement of Optimization Model for Single Action Tidal Power Station (단류식 창조발전의 조력발전소 최적화 운영 Model 개발에 관한 연구)

  • Kim, Hyun-Han;Kim, Man-Kie;Kim, June-Kyou;Ok, Yeon-Ho;Kim, Kwang-Ho;Jeong, Jong-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1144_1145
    • /
    • 2009
  • Tidal power station is using the difference of the ebb and flow and the single action tidal power is dependent on tide amplitude and basin volume. Therefore the inflow of basin in rainy season has also effect on the daily power. Also if operating units are changed then starting head too changed. Therefore the number of units are very important for the optimization model. According to our study the primary point when we make a determination of optimization is starting head and governorl control mode. On this study optimization model for tidal power station is considered all of this conditions.

  • PDF