Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.20
no.1
/
pp.119-126
/
2022
This study provides technical information about the nuclear fuel handling process, which consists of various subprocesses starting from new fuel receipt to spent fuel shipment at a nuclear power plant and the design requirements of fuel handling equipment. The fuel handling system is an integrated system of equipment, tools, and procedures that allow refueling, handling and storage of fuel assemblies, which comprise the fuel handling process. The understanding and reaffirming of detailed code requirements are requested for application to the design of the fuel handling and storage facility. We reviewed the design requirements of the fuel handling equipment for its adequate cooling, prevention of criticality, its operability and maintainability, and for the prevention of fuel damage and radiological release. Furthermore, we discussed additional technical issues related to upgrading the current code requirements based on the modification of the fuel handling equipment. The suggested information provided in this paper would be beneficial to enhance the safety and the reliability of the fuel handling equipment during the handling of new and spent fuel.
For electrical vehicles, switched reluctance drives present a promising alternative-compared to asynchronous and synchronous (permanent magnet) concepts. For these applications, a very wide field weakening range is a key issue. Other requirements include high torque output from a small machine and low current ripple at the DC-side without the use of bulky filters - when powered from fuel cells or advanced Lithium-Ion-batteries. A new converter and control strategy according to these requirements is presented and compared to existing designs. The comparison is done for a drive system with a continuous power rating of 30 to 40 kW.
Air-cooling method is adopted on the basis of the requirements for the thermal stability and convenient field use of an electrical source transmitter. The power losses of the transmitter are determined after calculating the losses of the alternating current (AC)-direct current (DC) power supply, the constant-current circuit, and the output circuit. According to the analysis of the characteristics of a heat sink with striped fins and a fan, the engineering calculation expression of the Nusselt number and the design process for air-cooled dissipation are proposed. Experimental results verify that the error between calculated and measured values of the transmitter losses is 12.2%, which meets the error design requirements of less than 25%. Steady-state average temperature rise of the heat sink of the AC-DC power supply is $22^{\circ}C$, which meets the design requirements of a temperature rise between $20^{\circ}C$ and $40^{\circ}C$. The transmitter has favorable thermal stability with 40 kW output power.
Seong Rae Kim;Keon Woo Nam;Tae Kyong Lee;Dae Young Kang;Joon Young Kim
Journal of the Korean Society of Systems Engineering
/
v.19
no.2
/
pp.74-91
/
2023
This study provides an in-depth comparison and analysis of various risk assessment models widely used in modern industries, and proposes the most suitable model for risk assessment of offshore wind power in Korea. The assessment models were selected by considering various factors such as the purpose of risk assessment, stakeholder requirements, and characteristics of offshore wind power. We also emphasized the importance of using different risk assessment models in combination in situations of high uncertainty. To systematize the combination of risk assessment models, we used systems engineering which is effective to develop a new system. Systems engineering was used to define the complete, traceable functions from site requirements, and model-based systems engineering was used to manage the design information from requirements to detailed functions in a single model. The developed risk assessment module provide automatic conversion between risk assessment models to enable risk assessment suitable for offshore wind power. The functionality and usability of the offshore wind risk assessment module were verified by the evaluation of three wind power experts.
Rixin Wang;Lizhen Liang;Congguo Gong;Longyang Wang;Jun Tao
Nuclear Engineering and Technology
/
v.56
no.6
/
pp.2395-2403
/
2024
With the rapid development of DC high voltage accelerator, higher requirements have been raised for the design of DC high voltage power supply, requiring more stable high voltage with lower output ripple. Therefore, it also puts forward higher requirements for the parameter design of the voltage doubling rectifier circuit, which is the core component of the DC high voltage power supply. In order to obtain output voltage with better performance, the effects of the working frequency, the stage capacitance and the load resistance on the output voltage of the voltage doubling rectifier circuit are studied in detail by simulation. It can be concluded that the higher the working frequency of the transformer, the larger the stage capacitance, the larger the load resistance and the better the output voltage performance in a certain range. Based on this, a 2.5 MV voltage doubling rectifier circuit driven by a 120 kHz frequency transformer is designed, developed and tested for the power supply of the neutron source device towards BNCT. Experimental results show that this voltage doubling rectifier circuit can satisfy the design requirements, laying a certain foundation for the engineering design of DC high voltage power supply of neutron source device.
Instrumentation and control systems in nuclear power plants have been digitalized for the purpose of maintenance and precise operation. This digitalization, however, brings out issues related to cyber security. In the most recent past, international standard organizations, regulatory institutes, and research institutes have performed a number of studies addressing these systems cyber security.. In order to provide information helpful to the system designers in their application of cyber security for the systems, this paper presents methods and considerations to define attack vectors in a target system, to review and select the requirements in the Regulatory Guide 5.71, and to integrate the results to identify applicable technical security control requirements. In this study, attack vectors are analyzed through the vulnerability analyses and penetration tests with a simplified safety system, and the elements of critical digital assets acting as attack vectors are identified. Among the security control requirements listed in Appendices B and C to Regulatory Guide 5.71, those that should be implemented into the systems are selected and classified in groups of technical security control requirements using the results of the attack vector analysis. For the attack vector elements of critical digital assets, all the technical security control requirements are evaluated to determine whether they are applicable and effective, and considerations in this evaluation are also discussed. The technical security control requirements in three important categories of access control, monitoring and logging, and encryption are derived and grouped according to the elements of attack vectors as results for the sample safety system.
This seminar outlines the technology involved in the backlighting of TFT LCDs. It covers basic terminology, lighting requirements, lamp types and optical techniques. These will be reviewed and compared. Optical factors will be covered and related to space constraints. The spectral requirements, luminance levels, system efficacy, power requirements, lamp temperature, as well as other parameters affecting system performance will be discussed.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.4
/
pp.358-364
/
1999
The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.
A Summary is given of conventional electrical engineering university education and a description of the employment scene for the graduates. The training requirements of graduates for three different industrial employers are given and the steps taken to meet some of these requirements are explained in detail. The steps taken include tow training programmes, one an undergraduate final year course and the other a graduate training programme. The final year course teaches to design and construct a real product to specifications, whereas the graduate training programme employs a new graduate or postgraduate student on industrial projects which can be closely supervised for maximum benefit. Both programmes are described in detail and the conclusion developed as to future requirements.
Distribution management system or microgrid energy management system plays an important role in monitoring, operation and control of electrical distribution systems by utilizing IT infrastructure. Nowadays, the rapid increase of the distributed resources makes the conventional management system have some additional functionality for the reliable operation due to intermittent renewables and the efficient operation on the economical purpose. In this paper, the brief standard software functional requirements of microgrid energy management system are provided through survey of the recent commercial products of the major vendors, and furthermore the architectures of microgrid energy management system are provided in comparison with major suppliers' microgrid energy management system. The summary of investigation will be able to make the developers and researchers focus on the specific functionality in the real world.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.