JSTS:Journal of Semiconductor Technology and Science
/
제14권4호
/
pp.407-418
/
2014
As the high-throughput requirement in the next generation communication system increases, it becomes essential to implement high-throughput SISO (Soft-Input Soft-Output) decoder with minimal hardware resources. In this paper, we present the comparison results between cascaded radix-4 ACS (Add-Compare-Select) and LUT (Look-Up Table)-based radix-4 ACS in terms of delay, area, and power consumption. The hardware overhead incurred from the retiming technique used for high speed radix-4 ACS operation is also analyzed. According to the various analysis results, high-throughput radix-4 SISO decoding architecture based on simple path metric recovery circuit is proposed to minimize the hardware resources. The proposed architecture is implemented in 65 nm CMOS process and memory requirement and power consumption can be reduced up to 78% and 32%, respectively, while achieving high-throughput requirement.
Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.
Urban transit is system that offer target Performance and function because various lower part system such as vehicles, signaling, power supply, rail track is consisted as complex. It is important first of all that describe correctly system requirement until configuration of system, design, manufacture, installation and test verification so that the complicated urban transit system is to act safety and reliable and to display target Performance and function properly. The system requirement assist the system developer to comprehensive the performance and function of system in basic design. Therefore, In this paper wishes to study way to analyze system of system requirement and apply to Urban transit.
Battery energy storage system(BESS) attract the attention of the power system operators with its fast response to a disturbance in spite of its limited energy capacity. This paper proposes the operating method of BESS for following the Automatic Generation Control(AGC) frequency control which is centrally distributed by a system operator. As BESS needs to just meet the control requirement from the system operator, it should be able to properly manage the state of charge(SOC) of BESS to be available to control signal. For doing these, the proposed method distributes the control requirement to available batteries in proportion to its SOC. In addition, unavailable batteries are controlled to recover the SOC to an appropriate range, and the recovering power is supplied by available batteries meeting the control requirement. Moreover, the proposed method manages the efficiency of power conversion system (PCS) by limiting the number of PCS to be assigned for the low control requirement. Finally, the case studies are carried out to verify the effectiveness of proposed strategy.
A laboratory model test was carried out with a newly designed model to figure out the vibration characteristics of the vibratory tillage tool according to the method of forced vibration, i.e., horizontally and vertically forced vibrations. The results are summarized as follows: 1. The reduction ratios of the draft force of the vibratory blade were 14.2-42.6% for the case where the vibration was forced parallel to the travelling direction of the blade, and 15-54.5% for the vertically forced vibration. And it was thought that the method of vertically forced vibration was preferable to the reduction of the draft force. 2. The ratio of the draft force of a vibratory blade to that of a static one could be represented as a function of V/At. It was found to be possible to reduce the draft force by taking a lower value of (V/Af) and this meant that the effictiveness of tillage practice using the vibratory system would be limited. 3. The torque to the main rotating shaft to vibrate the model blade increased frequency and amplitude. This tendency varied according to the physical properties of tested soil. In case of horizontally forced vibration, the torque was 8~34% less than in case of vertically forced vibration. 4. With the increase of frequency, the total power requirement increased linearly, and also the portion of oscillating power requirement in the total power tended to increase. The magnitude of the total power requirement was 1.4-13 times greater than that of a static one for the case of horizontal vibration, and 1.5-15 times greater for the case of vertical vibration. It was thought that the horizontal vibration of the blade was preferable to the vertical vibration in view of the power requirement. 5. A linearity was found between the amplitude of moment oscillogram and magnitude of oscillating acceleration. Only positive values of moment occurred when the blade was forced to vibrate vertically, but negative values occurred in rarity in the case of amplitude A3 when the blade was forced to vibrate horizontally.
The engines mounted on power-tillers are used as power source in various kinds of works such as plowing, harrowing, transporting, spraying, water pumping and threshing, etc. But the engines have not been used effectively from a standpoint of fuel consumption because of lack of proper power transmission system and lack of understanding of fuel consumption characteristics of the engines. Therefore, this study was attempted to establish proper power transmission system between the power-tiller engines and various implements. In order to accomplish the above objective, firstly, power requirement and pulley sizes for various implements, which are driven by the power-tiller engines, were investigated to find out whether the power transmission system is proper. Secondly, partload variable engine-speed test was conducted for 3 different sizes of diesel engines to measure to specific fuel consumption. Thirdly, the present power transmission systems were analyzed in terms of specific fuel consumption, and proper power transmission systems were suggested for various implements. The results of this study are summarized as follows: 1. Power requirement for each fixed-type implement of power-tiller varied from 1.5 ps to 11 ps according to its type and operating conditions, but generally in the range of 2.5 ps to 7 ps. 2. Each power tiller and implement were equipped with only one size of pully with few exeptions. With the present power transmission systems, the engines can't be utilized effectively in terms of fuel economy. The pulley size of engine or implement should be diversified to provide the optimum engine speed for different implements. 3. For a diesel eninge with the rated power output of 6 ps, the optimum engine speed to minimize specific fuel consumption was 2200 rpm for the power reguirement in the range of 6 ps or more, 1700 rpm in the range of 4 to 6 ps, and 1200 rpm in the range of 4 ps or less. 4. For a diesel engine with the rated power output of 8 ps, the optimum engine speed was 2200 rpm for the power requirement in the range of 7 ps or more, 1700 rpm in the range of 4.8 to 7 ps, and 1200 rpm in the range of 4.8 ps or less. 5. For a diesel engine with the rated power output of 10 ps, the optimum engine speed was 2200 rpm for the power requirement in the range of 8.4 ps or more, 1700 rpm in the range of 5.4 ps to 8.4 ps, and 1200 rpm in thr range of 5.4 ps or less. 6. Provided the existing implements are dirven by 8 ps diesel engines, the optimum size of engine pulley should be larger than 120mm for the works of requiring less than 4 ps and 90-110mm for the works requiring 4.5-6.5 ps in order to minimize fuel consumption.
This paper estimates the capacity of shunt type active power filters(APF) for harmonic/reactive power compensation with a thyristor converter load. The base capacity requirement of APF is defined for idealized converter load current waveform and the effect of commutation overlap on the APF capacity is examined. The APF capacity required for reactive power compensation in addition to the harmonic elimination is estimated to give maximum achievable power factor for various operating condition of the partially-loaded thyristor converter. The method of current limit of APF is introduced, and it is shown that the APF capacity can be considerably reduced by deliberately limiting the peak current while maintaining the filtering performance to meet the level std 519 regulation.
In the electric power industry, It is important that the supply of energy must always be guaranteed. To satisfy these requirements, various forms of technologies are needed, such as RFID tag, reader, sensor network, middleware and so on. WSN (Wireless Sensor Network) technologies of the electric power industry are in the early stage and there is no clear guideline for developing electric facility management system using WSN. Relevant experience is limited, the challenge will be to derive requirement from business practice and to determine whether it is possible or not. To explore this issue, we focus on researching and field test of prototype system in Korea Electric Power Corporation (KEPCO). In this paper we describe requirement from power industry. And we introduce design and implementation of the power facility monitoring system.
The products to meet the requirement of are installed in nuclear power plant and the reliability target should be provided in the requirement. However, it is not easy to set a reliability target using quantitative analysis. The objective of this paper is to propose a method of reliability target setting considered warranty cost for process controller and then compare a reliability target with reliability analysis result.
International Journal of Aeronautical and Space Sciences
/
제17권3호
/
pp.401-408
/
2016
During daylight, the solar array of low earth orbit satellites harvests electrical power to operate satellites. The power conversion of the solar array is carried out by control of the operation point using the solar array regulator when the solar array faces the sunlight. Thus, the design of the solar array should comply with not only the power requirement of satellite system but also the input voltage requirement of the solar array regulator. In this paper, the design requirements of the solar array for low earth orbit satellites are defined, and the means of satisfying these requirements are described. In addition, the architecture of a multi-distributed interface is suggested to maximize the power harvested from a solar array having high temperature deviation between each panel. The power analysis in this paper shows the optimal number of multi-distributed interfaces with a converter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.