• Title/Summary/Keyword: power plant boiler

Search Result 346, Processing Time 0.025 seconds

Simulation and Data Sampling Modelling for 1000MW Boiler Process (1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션)

  • Park, Doo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF

Development of Process Control Graphic System for Power Plant Using Multiple Microcomputers (다중 마이크로 컴퓨터를 이용한 발전소 공정제어 그래픽 시스템의 개발)

  • ;;;Zeungnam Bien
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.38 no.3
    • /
    • pp.217-227
    • /
    • 1989
  • A process control graphic system is proposed as an efficient tool for monitoring the operation of power plant. It uses the multi-processor structure with 60 Kbyte shared memory as an implemental type of the distributed computer system, so that it is flexible, functionally extensible, and applicable to real-time process. The shared memory is used as a real-time database handling the process values and operator's commands. The database files, generated by the user-interactive graphic editor developed for the system or text editor, have the characteristics of simplicity and user-friendliness. The process control graphic system, that can monitor the operation of boiler and function as a backup controller in case of failure in boiler controller, is applied to Ulsan power plant. As a result, it displays the operating data of the boiler process without error by 14 pages of color graphic image according to the operation menu, and additionally functions well as a fault-tolerant control system.

Improvement of Boiler Performance on 550 MW Coal Fired Thermal Power Plant via Baffle Plates (다공판 연소가스 유량제어를 통한 석탄화력발전소 보일러 성능 개선)

  • Kim, Chi Ho;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.17 no.1
    • /
    • pp.38-49
    • /
    • 2021
  • In order to increase power plant efficiency, the steam temperature was increased to 610 ℃ which deteriorates the durability of the boiler tube and as the use of low-calorie coal increases the post combustion and delayed combustion phenomenon, the overheating of the final reheater and the tube rupture are becoming frequent. In order to prevent overheating of the final reheater, desuperheater water injection was increased, leading to a decrease in boiler efficiency. In this study install a baffle plate at the back of some overheated tube groups, thereby reduce the temperature of the tube by reducing the amount of combustion gas, and the reduced combustion gas moves to an adjacent place to increase the temperature of other tubes. As a result of the study, the temperature deviation between tubes decreased 1.5. And the heat-reducing injection amount was reduced to 6,929 kg/h and the maximum tube temperature was reduced to 623.4℃ which is 6.6℃ more below than the control standard of 630℃.

기술사마당 - 도시 쓰레기 소각에서 발생하는 다이옥신으로부터 국민건강을 지키자

  • Choi, Hae-Wuk
    • Journal of the Korean Professional Engineers Association
    • /
    • v.46 no.2
    • /
    • pp.44-50
    • /
    • 2013
  • The treatment of city life wastes is headache problem. Now, only small portion of burnable wastes is burnt at modern process incinerators, the other large portion is buried in the soil by landfill method. The burnable wastes will be increased year by year. The dioxin, the cancer-causing agent, produced by incineration of wastes influences harmful effect to national human health. The new idea of burnable wastes treatment is using the city life wastes as auxiliary fuel of fluidizing bed combustion boiler of large scale coal-fired power plant. The dioxin-free treatment of burnable wastes is sucessfully achieved by burning the wastes, in flyash storm at fluidizing bed combustion boiler.

  • PDF

The Study of Optimized Combustion Tuning for Fossil Power Plant (발전보일러의 최적연소조정에 대한 실험적 연구)

  • Jung, Jae-Jin;Song, Jung-Il
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.102-108
    • /
    • 2009
  • Fossil power plants firing lower grade coals or equipped with modified system for NOx controls are challenged with maintaining good combustion conditions while maximizing generation and minimizing emissions. In many cases significant derate, availability losses and increase in unburned carbon levels can be attributed to poor combustion conditions as a result of poorly controlled local fuel and air distribution within the boiler furnace. In order to develop a on-line combustion tuning system, field test was conducted at operating power boiler. During the field test the exhaust gases' $O_2$, NOx and CO was monitored by using a spatially distributed monitoring grid located in the boiler's high temperature vestibule and upper convective back-pass region. At these locations, the flue gas flow is still significantly stratified, and air in-leakage is minimal which enables tracing of poor combustion zones to specific burners and over-fire air ports. using these monitored information we can improving combustion at every point within the furnace, therefore the boiler can operate at reduced excess $O_2$ and gas temperature deviation, reduced furnace exit gas temperature levels while also reducing localized hot spots, corrosive gas conditions, slag or clinker formation and UBC. Benefits include improving efficiency, reducing NOx emissions, increasing output and maximizing availability. Discussion concerning the reduction of greenhouse gases is prevalent in the world. When taking a practical approach to addressing this problem, the best way and short-term solution to reduce greenhouse gases on coal-fired power plants is to improve efficiency. From this point of view the real time optimized combustion tuning approach is the most effective and implemented with minimal cost.

  • PDF

The Study of Optimized Combustion Tuning Method for Fossil Power Plant (발전용 보일러의 최적연소조정기법에 대한 실험적 연구)

  • Jung, Jae-Jin;Song, Jung-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.5
    • /
    • pp.45-52
    • /
    • 2009
  • Fossil power plants firing lower grade coals or equipped with modified system for $NO_x$ controls are challenged with maintaining good combustion conditions while maximizing generation and minimizing emissions. In many cases significant derate, availability losses and increase in unburned carbon levels can be attributed to poor combustion conditions as a result of poorly controlled local fuel and air distribution within the boiler furnace. In order to develop a on-line combustion tuning system, field test was conducted at operating power boiler. During the field test the exhaust gases' $O_2,\;NO_x$ and CO was monitored by using a spatially distributed monitoring grid located in the boiler's high temperature vestibule and upper convective rear pass region. At these locations, the flue gas flow is still significantly stratified, and air in-leakage is minimal which enables tracing of poor combustion zones to specific burners and over-fire air ports. using these monitored information we can improving combustion at every point within the furnace, therefore the boiler can operate at reduced excess $O_2$ and gas temperature deviation, reduced furnace exit gas temperature levels while also reducing localized hot spots, corrosive gas conditions, slag or clinker formation and UBC. Benefits include improving efficiency, reducing $NO_x$ emissions, increasing output and maximizing availability. Discussion concerning the reduction of greenhouse gases is prevalent in the world. When taking a practical approach to addressing this problem, the best way and short-term solution to reduce greenhouse gases on coal-fired power plants is to improve efficiency. From this point of view the real time optimized combustion tuning approach is the most effective and implemented with minimal cost.

A Study on the Back-up Control of Boiler Controller for a Thermal Power Plant (발전소 보일러 제어기의 back-up 제어에 관한 연구)

  • Kim, J.H.;Cho, Y.J.;Chung, K.K.;Bien, Z.
    • Proceedings of the KIEE Conference
    • /
    • 1987.07a
    • /
    • pp.213-215
    • /
    • 1987
  • As a means of improving the reliability of the analog type controller for the thermal power plant, an efficient method is proposed, which is to place the hardware redundancy, i.e. a back-up controller with fault detecting capability. FTCS is implemented by using multi-processors and it is experimentally verified that the back-up controller takes over the role of the original controller, controlling the faulty loop.

  • PDF

Expert System for ABC Tuning of Once-Through Bboiler

  • Matsumura, S.;Kojima, Y.;Tozaki, T.;Shirasaka, Y.;Suzuki, M.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.744-748
    • /
    • 1989
  • A newly developed Expert System (ES) for the tuning of thermal power plant control equipment is described. The system is furnished with the rules for controller tuning which were obtained by analysis and arranging the data and knowledge from the experts or tuning records. Based on these rules, automatic tuning or setting of the control parameters is performed in real-time base. The performance of the test equipment, a combination of ES and a boiler simulator, was examined in the automatic tuning test for steam pressure, steam temperature, and load controllers of a constant-pressure once-through boiler model. It was confirmed from the test results that the system is quite promising for future application to actual plants, since the tuning results obtained by the proposed system were similar to those by tuning experts.

  • PDF

A realization of simulator for reliability verification on turbine controller for boiler feed Pump (급수펌프 구동용 증기터빈 제어기의 신뢰성 검증을 위한 시뮬레이터 구현)

  • Choi, I.K.;Jeong, W.J.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2307-2309
    • /
    • 2002
  • A simulator had been developed and will be used for reliability verification on turbine control programs for boiler feed pump in power plant prior to its actual operation in field. A mathematical model on thermal dynamics pertaining to prime mover steam turbine and pump was realized and included in this simulator. Also, many design and operating data acquired from fields were utilized in order to decide mechanical and thermal dynamic characteristics such as friction loss windage loss and inertia. A user can decide closing or opening velocity of steam stop valves and steam regulation valves. This simulator is able to generate steam pressure, turbine speed, pump power.

  • PDF

Thermodynamic model of one of the super heaters and the related spray in the Nekka power plant and Presenting SCO method to control boiler temperature

  • Zalloi, Mehdi;Barghandan, Saeed;Badamchizadeh, M.A.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.129-133
    • /
    • 2005
  • In this paper, first the thermodynamic model is presented to one of the super heaters and sprays of the Nekka power plant and then its unknown parameters are identified according to the registered data of the power plant. SCO control method is introduced to control the external steam temperature of super heater. Finally the conventional method in power plant for controlling external steam temperature of super heater is compared with new method and their performances are presented..

  • PDF