• Title/Summary/Keyword: power of test

Search Result 10,124, Processing Time 0.045 seconds

Equivalent three-phase synthetic making test for medium voltage circuit breaker of distribution system using DC power (직류전원을 이용한 배전급 차단기의 등가 3상 합성투입시험법)

  • Park, Byung-Rak;Jo, Man-Yong;Kim, Jin-Seok;Shin, Hee-Sang;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.105-113
    • /
    • 2011
  • The study about three-phase synthetic making test using DC power has been performed in order to increase the making test capacity on Vacuum Circuit Breaker. And, it made possible to solve the limitations that short-circuit testing facilities can not fulfill the testing requirements of VCB exceeding three-phase 36[kV] 31.5[kA]. By using DC power and high speed spark-gap switch, this method made the equivalence with the pre-arc that occurred during the making process under the fault condition of power system. As results, KERI(Korea Electrotechnology Research Institute) could have capacity to carry out type test for VCB under three-phase 52[kV] 40[kV], which satisfies the IEC Standard.

Power-aware Test Framework for NoC(Network-on-Chip) (NoC에서의 저전력 테스트 구조)

  • Jung, Jun-Mo;Ahn, Byung-Gyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.3
    • /
    • pp.437-443
    • /
    • 2007
  • In this paper, we propose the power-aware test framework for Network-on-Chip, which is based on embedded processor and on-chip network. First, the possibility of using embedded processor and on-chip network isintroduced and evaluated with benchmark system to test the other embeddedcores. And second, a new generation method of test pattern is presented to reduce the power consumption of on-chip network, which is called don't care mapping. The experimental results show that the embedded processor can be executed like the automatic test equipments, and the test time is reduced and the power consumption is reduced up to 8% at the communication components.

  • PDF

Seismic behavior of simplified electrical cabinet model considering cast-in-place anchor in uncracked and cracked concretes

  • Bub-Gyu Jeon;Sung-Wan Kim;Sung-Jin Chang;Dong-Uk Park;Hong-Pyo Lee
    • Nuclear Engineering and Technology
    • /
    • v.55 no.11
    • /
    • pp.4252-4265
    • /
    • 2023
  • In the case of nuclear power plants near end of their design life, a reassessment of the performance of safetyrelated equipment may be necessary to determine whether to shut down or extend the operation of the power plant. Therefore, it is necessary to evaluate the level of performance decline due to degradation. Electrical cabinets, including MCC and switchgear, are representative safety-related equipment. Several studies have assessed the degradation and seismic performance of nuclear power plant equipment. Most of those researches are limited to individual components due to the size of safety-related equipment and test equipment. However, only a few studies assessed the degradation performance of electrical cabinets. The equipment of various nuclear power plants is anchored to concrete foundations, and crack in concrete foundations is one of the most representative of degradation that could be visually confirmed. However, it is difficult to find a study for analysis through testing the effect of cracks in concrete foundations on the response of electrical cabinet internal equipment fixed by anchors. In this study, using a simple cabinet model considering cast-in-place anchor in uncracked and cracked concretes, a tri-axial shaking table tests were performed and the seismic behavior were observed.

A Twin Symbol Encoding Technique Based on Run-Length for Efficient Test Data Compression

  • Park, Jae-Seok;Kang, Sung-Ho
    • ETRI Journal
    • /
    • v.33 no.1
    • /
    • pp.140-143
    • /
    • 2011
  • Recent test data compression techniques raise concerns regarding power dissipation and compression efficiency. This letter proposes a new test data compression scheme, twin symbol encoding, that supports block division skills that can reduce hardware overhead. Our experimental results show that the proposed technique achieves both a high compression ratio and low-power dissipation. Therefore, the proposed scheme is an attractive solution for efficient test data compression.

A characteristic test of Auxiliary power supply for High Speed Rolling stock 350 experimental (HSR-350x) (한국형고속열차 보조전원장치 특성시험)

  • Jeong, Sang-Hun;Kim, Dong-Hwan;Lee, Byung-Song;Lee, Tae-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.185-191
    • /
    • 2006
  • Auxiliary power supply developed by domestic technology has very important function that not only effect on main power converter & inverter system, traction motor and train control system which are related to performance of train, but also influence on power supply for HVAC(Heat, Ventilation, Air-conditioning) and lighting device which are related to comfort of passengers. This paper shows characteristic test results of auxiliary power supply such as working condition and performance, which is associated with velocity of train, operating mode and surrounding equipment, through test running. Also it shows the results deduced from comparison analysis between designed data and manufactory test data as measuring in put voltage of auxiliary power supply. And, it propose a modification of design parameter for stabilizing operation and improving reliability.

  • PDF

A modified test for multivariate normality using second-power skewness and kurtosis

  • Namhyun Kim
    • Communications for Statistical Applications and Methods
    • /
    • v.30 no.4
    • /
    • pp.423-435
    • /
    • 2023
  • The Jarque and Bera (1980) statistic is one of the well known statistics to test univariate normality. It is based on the sample skewness and kurtosis which are the sample standardized third and fourth moments. Desgagné and de Micheaux (2018) proposed an alternative form of the Jarque-Bera statistic based on the sample second power skewness and kurtosis. In this paper, we generalize the statistic to a multivariate version by considering some data driven directions. They are directions given by the normalized standardized scaled residuals. The statistic is a modified multivariate version of Kim (2021), where the statistic is generalized using an empirical standardization of the scaled residuals of data. A simulation study reveals that the proposed statistic shows better power when the dimension of data is big.

Type I Error Rates and Power for Omnibus Tests of Repeated Measures Measn in the Split-Plot Design : F test, $\widetilde{\xi}$F test, and CIGA test

  • Kim, Hyunchul
    • Communications for Statistical Applications and Methods
    • /
    • v.4 no.1
    • /
    • pp.139-149
    • /
    • 1997
  • For split plot designs exact univariate F tests of the within-subjects main effect are based on the assumption of multisample sphericity. Type I error rates and power are reported for the F test and two tests designed for use when multisample sphericity is violated: the $\widetilde{\xi}$-adjusted test and the Corrected Improved General Approximation(CIGA) test.The results indicate that even though the F test and the $\widetilde{\xi}$-adjusted test have better power than the CIGA test in some conditions, the F test and the $\widetilde{\xi}$-adjusted test do not control Type I error rates when the design is unbalanced and the F test dose not have a good control of Type I error rates when sphericity assumption is severely violated.

  • PDF

The Study on the Actual Examination of the Bidirectional Protection Device in the 22.9[kV] Distribution Power System Interconnected with the DG (분산전원이 연결된 22.9[kV] 배전계통의 양방향 보호기기 실증시험 연구)

  • Lee, Heung-Jae;Choi, Myeong-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.10
    • /
    • pp.102-108
    • /
    • 2011
  • The existing power flow has a single direction to the line end but the bidirectional power flow will possibly occur depending on the output capacity in the 22.9[kV] distribution power system connected with the dispersed generation(DG). So these characteristics would influence the power system management. The DG have many advantages such as assistance source, Load share etc. So the utility must apply the bidirectional protection system so as to maximize an advantage of DG. This paper describes the field test case of bidirectional protective device in order to investigate the device performance when applied to bidirectional power system. We have tested in the power system test site of KEPCO and these tests provide the basis for performance verification test of bidirectional protective device in the power system.

A Simulation Test of Load Rejection for Steam Turbine Generator in a 680MW Nuclear Power Plant (680MW 원자력발전소 증기터빈 발전기의 부하차단 모의시험)

  • Choi, In-Kyu;Jeong, Chang-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1605-1606
    • /
    • 2007
  • An electrical generator in power plant is driven and maintained its speed at rated by steam turbine. By the way, after synchronization in parallel with the power system, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip set point by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a field simulation test of generator load rejection to be implemented on the turbine governor in a 680MW nuclear power plant before its startup.

  • PDF

LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF