• Title/Summary/Keyword: post assessment and management

Search Result 231, Processing Time 0.025 seconds

Improvement of Post-earthquake Risk Assesment System for Damaged Buildings by Case Study on '11.15 Earthquake' (11.15 지진 사례를 통한 지진피해 시설물 위험도 평가 체계 개선)

  • Kang, Hyeong Gu;Yun, Nu-Ri;Kim, David;Lee, Jung Han;Kim, Hye Won;Oh, Keum Ho
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.185-191
    • /
    • 2018
  • Post-earthquake risk assessment technique in Korea is developed in 2013 by National Disaster Management Research Institute, at the same time, related manual and standard regulation is distributed to every local government by National Emergency Management Agency. The objectives of this research are to investigate and evaluate the post-earthquake risk assessment of 9.12 Earthquake (M5.8, Gyeongju City, 2016) and 11.15 Earthquake (M5.4, Pohang City, 2017). To suggest and improve the assessment process of post-earthquake risk, first post-earthquake risk assessment method of advanced foreign countries including US, New Zealand and Japan are compared, and post-earthquake evaluation activities in 9.12 Earthquake and 11.15 Earthquake are analyzed. From the results, it is needed to expand the adapted building and structure types and strengthen the earthquake disaster response capacity of local government.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Environmental Impact Assessment and Environmental Monitoring: Monitoring Factors and Organization (환경영향평가와 측정 : 환경처 업무 중심으로)

  • Kang, In-Goo;Chang, Chun-Ki;Han, Eui-Jung;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.69-75
    • /
    • 1994
  • Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.

  • PDF

Environmental Impact Assessment and Environmental Monitoring in Korea (한국에서의 환경영향평가와 환경측정)

  • Kang, In-Goo;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.31-39
    • /
    • 1995
  • Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.

  • PDF

Establishment on Management Plan of Environmental Noise with Noise Map (소음지도를 활용한 환경소음 관리계획 수립)

  • Sun, Hyosung
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.

A Method of Improving Air Quality Impact Assessment and Prediction (대기질 영향평가와 예측방법에 대한 개선방향)

  • Park, Jong-Kil;Won, Gyeong-Mee;Kim, Seong-Su
    • Journal of Environmental Science International
    • /
    • v.3 no.2
    • /
    • pp.77-88
    • /
    • 1994
  • When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.

  • PDF

A Quality Strategy and Self-Assessment Method for Organizational Excellence

  • Dahlgaard, Jens-J.;Park, Mi-Su
    • International Journal of Quality Innovation
    • /
    • v.4 no.1
    • /
    • pp.20-39
    • /
    • 2003
  • Based on a combination of theories, experiences and cases a sustainable change strategy and self-assessment method with a focus on the human dimension in TQM are suggested and discussed. The Post Denmark TIQ (Total Involvement in Quality) case will be used to illustrate how breakthrough in people attitudes and organisational culture happened and became the foundation for a new culture focusing on change, continuous improvements and everybody's participation.

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF

Development and Application of Simulation-based Nursing Education Program for Post-myomectomy Care in Nursing Students (간호 대학생의 시뮬레이션 기반 자궁근종절제술 후 간호교육 프로그램 개발과 적용)

  • Kim, Hee Sook;Noh, Gie Ok
    • Journal of East-West Nursing Research
    • /
    • v.22 no.1
    • /
    • pp.60-67
    • /
    • 2016
  • Purpose: This study was conducted to develop and apply simulation-based nursing education program for post-myomectomy care in nursing students. Methods: One group pre-post design was utilized. One hundred and thirty two participants consisting of 66 nursing students 132 participants consisting of 66 nursing students team were recruited. The data were collected from March 2 to June 12, 2015. Eight hours of simulation-based education program for post-myomectomy care was operated. Forty five items of Clinical Competence Assessment Scale was developed and content validity was tested using the content validity index. Results: The total score of Clinical Competence Assessment Scale was 90 and mean score of it was 82 (SD 4.2). The item showing the lowest mean score was 'education for Foley catheter management'. Mean score of performance was 92.7%, education 90.2% and assessment 89.9% respectively. Conclusion: The findings suggest that it would be useful to use the simulation-based education program for post-myomectomy care for evaluating clinical performance in nursing students.