A previous feasibility study for the Korean lead plant, PLiM Phase I, showed a strong possibility of continued operation beyond the original licensed period. In 1998, PLiM Phase II study was initiated aimed at performing additional detailed evaluations on a wider range of components. The objective of this paper is to present the Korean PLiM efforts for Class 1 piping which is identified as one of the critical components with regard to long-term operation. The key findings such as typical design features, degradation mechanisms, technical issues, draft results from the lifetime evaluation for Class 1 piping of the lead plant are briefly described.
Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed with hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of gasification process to type and structure of gasifier. For this purpose, the performance characteristics of gasification reaction are analyzed with the operation characteristic of pilot-scale 2-stage coal gasifier. It is found that gasification reaction, floating characteristic of melted slag, particle stick of inside of the gasifier, particle stick and deposit of Syngas cooler are the causes in the different performance characteristics.
Proceedings of the Korea Society for Energy Engineering kosee Conference
/
2003.05a
/
pp.403-414
/
2003
Periodic safety review on Kori Unit 1 has been successfully done for the first time in Korea. 11 safety factors of the review were fully evaluated in accordance with the domestic legal system. Although it is the oldest nuclear power plant in Korea, Kori Unit 1 was found to have maintained good operating conditions and continuously enhanced its safety by implementing post-TMI action plans and other safety issues, such as replacing steam generators and process/control system. It can be therefore confirmed that safe operation of Kori Unit 1 is guaranteed until next periodic safety review. Nevertheless, some corrective action items were recommended to enhance further its safety level, such as equipment qualification, additional ageing management program, strengthening of some procedures related to administration and human factor. The results of PSR can be utilized for the continued operation beyond the design life as long as the plant safety is maintained and improved. Experiences of the PSR on Kori Unit 1 can be also applied to PSR on other plants.
$CO_2$ emission amount and characteristics of combined heat and power (CHP) plant in industrial complex of Korea is evaluated by using the fuel analysis method. Fuel analysis methods of several foreign countries and developed one which is developed considering the operation characteristics of the surveyed CHP plants are used. The operation data is surveyed for all of the CHP plants in industrial complex and is composed of fuel consumption amount, generation, sale and efficiency of heat and electricity, condensed steam enthalpy, and etc of the each CHP.
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.3
/
pp.79-89
/
2011
Since commercial operation of Kori-1 nuclear power plant in 1978, twenty units are under operation and six units are under construction at 2011 present. Nuclear power become a main energy source in our country. However, the plant was constructed by a USA vendor in its beginning period, the Quality Assurance requirements of USA was applied. Even though Quality Assurance requirements were newly established to the Korea Atomic Energy Act, its contents are quite similar to those of USA. And 10 CFR 50 App.B, ASME NQA-1 apply to most of nuclear industries as a quality assurance plan. In this paper, Quality Assurance requirement of domestic nuclear industries has been investigated and applicable method of ISO Quality Assurance application to the nuclear industries is suggested by a comparison ISO 9000 and nuclear quality assurance specification.
Journal of the Korean Professional Engineers Association
/
v.30
no.5
/
pp.82-95
/
1997
A Study of Improvement in Reactor Thermal Power Measurement Method using Kalman Filter. The objectives of the safety analysis of nuclear power plants are to maintain the surface temperature of fuel and fuel cladding within limit value in case of Loss of Coolant accident (LOCA) so that it ensures the safety and reliability of nuclear power plants. The new technique evaluating the reactor power and improvement of existing plant system increase the safety margin of nuclear power plant operation, and accordingly, economic effect will be anticipated. Hereby, 1 would like to introduce reactor power measurement method using Kalman filter that enables to calculate the reactor power more precisely combining the parameters, for example, turbine output as the 1 st stage pressure of high pressure turbine, and reactor power using energy equilibrium relation. It is expected that the new technique will enhance the accuracy of measurement of reactor power and maintain the reliability of nuclear power operation by increasing operational safety margin, and gain the economic benefit
A graphic display and operator console system is developed for monitoring the operation of power plant. It has multiprocessor structure using VME bus and common memory. The graphic monitoring system is applied to fault tolerant control system for enhancing reliability of boiler analog controller. As a result, it displays all the operating date as color graphic images with 14 pages. Moreover, it can transfer the operator commands to the other micro-processors through common memory.
Park, Hyung-Joon;Chung, Chan-Soo;Lee, Hae-Soo;Lee, Sang-Chul
Proceedings of the KIEE Conference
/
2007.07a
/
pp.2046-2047
/
2007
This paper is about the energy efficiency calculation of operating electric motors in production facilities. The most important 1st step to efficient operation of plants is the evaluation of the energy efficiency of the production facilities in that plant. Through this procedure, we can decide that which facilities i.e. induction motors, in this paper, should do maintenance or not. There are mainly 2 types of energy which are used in production facilities, the one is electric energy and the other is heat energy but in order to make calculation simple, in this paper, we are only focusing on electric energy, efficiency and energy loss of the electric motors under operation conditions. As a case study, we chose electric motors in a certain process in a production facilities, and calculated efficiency and loss by using measured data.
Proceedings of the Korea Technical Association of the Pulp and Paper Industry Conference
/
2004.11a
/
pp.212-220
/
2004
In this work the Dynamic Matrix Control method is applied to control the grade change operations in paper mills. Paper process trained by neural network regards a real-plant. The model obtained with operation data is used to achieve DMC. Results of simulations for DMC control of grade change operations are compared with plant operation data response. From the comparison, we can see that the proposed DMC method exhibits faster response for the grade change of paper and achieves stable steady-state.
Park, Ju-Seok;Kim, Hyun-Kab;An, Chang-Hwan;Whang, Jung-Ki;Ahn, Sang-Jun
Journal of Korean Society of Water and Wastewater
/
v.13
no.3
/
pp.29-35
/
1999
The purpose of this study is to remove the organics, nitrogen and phosphorus using biosorption for the domestic sewage. The new process using biosorption is based on the methods of contact-stabilization, which remove the organics by absorbing them to the surface of the microorganism in the activated sludge. This process consists of biosorption reactor, biosorption clarifier, nitrifying reactor, nitrifying clarifier, denitrifying reactor, phosphorus uptake(polishing) reactor and final clarifier. The efficiency of removal could be reached 91% for organics, 76% for nitrogen, 90% for phosphorus in Eujungbu pilot plant. We operated the plant which irrigated $10m^3$ per day for sewage. During our operation the HRT(Hydraulic Retention time) was maintained for 10.5hr, but it could be reduced as 8.5hr according to our operation results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.