• Title/Summary/Keyword: plant operation

Search Result 2,268, Processing Time 0.031 seconds

Bioreactor Operating Strategy in Scultellaria baicalensis G. Plant Cell Culture for the Production of Flavone Glycosides (Flavonoid 배당체 생산을 위한 Scutellaria baicalensis G. 식물 세포 배양에서 생물반응기 운전전략)

  • 최정우;조진만;이정건;이원홍;김익환;박영훈
    • KSBB Journal
    • /
    • v.13 no.3
    • /
    • pp.259-267
    • /
    • 1998
  • Optimal feeding strategies in bioreactor operation of Scutellaria baicalensis G. plant cell culture were investigated to maximize the production of flavone glycosides by using a structured kinetic model which can predict culture growth and flavone glycosides synthesis in a rigorous, quantitative manner. For the production of baicalin and wogonin-7-0-GA, the strategies for glucose feeding into Scutellaria baicalensis G. plant cell culture were proposed based on the model, which are a periodic fed-batch operation with maintenance of cell viability and of specific production rate respectively, and a perfusion operation with maintenance of specific production rate for baicalin and wogonin-7-0-GA. Simulation results showed that the highest volumetric concentration of flavone glycosides was obtained in a periodic fed-batch operation with maintenance of cell viability among all the suggested strategies. In the periodic fed-batch operations, the higher volumetric production of flavone glycosides was achieved compared with that in the perfusion operation. It can be concluded that a periodic fed-batch operation with maintenance of cell viability would be the optimal and practical operating strategy of Scutellaris baicalensis G. plant cell culture for the production of flavone glycosides.

  • PDF

TECHNICAL EVALUATION OF THE CONTINUED OPERATION OF NPP

  • Kim, Tae-Ryong;Jin, Tae-Eun
    • Nuclear Engineering and Technology
    • /
    • v.40 no.4
    • /
    • pp.277-284
    • /
    • 2008
  • Recently, the long-term operation of a nuclear power plant beyond its licensed term has become a worldwide trend as long as the safety of the plant is maintained in the extended period. Kori Unit 1, the oldest PWR in Korea, is the foremost example of this type of long-term operation in Korea. Comprehensive technical evaluation of the long-term operation of this plant was completed to confirm the overall safety of the plant. The technical evaluation included a review of PSR results, an assessment on aging management programs and time limited aging analyses, and a statement of radiological impact on the environment. Based on all of the results of the technical evaluation activities, Kori Unit 1 was approved to operate for an additional 10 years beyond its original design life of 30 years.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

A Study of the Sustainable Operation Technologies in the Power Plant Facilities (발전 설비 지속 가능 운영 기술 연구)

  • Lee, Chang Yeol;Park, Gil Joo;Kim, Twehwan;Gu, Yeong Hyeon;Lee, Sung-iI
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.842-848
    • /
    • 2020
  • Purpose: It is important to operate safely and economically in obsolescent power plant facilities. Economical operation is related in the balance of the supply and demand. Safety operation predicts the possible risks in the facilities and then, takes measures to the facilities. For the monitoring of the power plant facilities, we needs several kinds of the sensing system. From the sensors data, we can predict the possible risk. Method: We installed the acoustic, vibration, electric and smoke sensors in the power plant facilities. Using the data, we developed 3 kinds of prediction models, such as, demand prediction, plant engine abnormal prediction model, and risk prediction model. Results: Accuracy of the demand prediction model is over 90%. The other models make a stable operation of the system. Conclusion: For the sustainable operation of the obsolescent power plant, we developed 3 kinds of AI prediction models. The model apply to JB company's power plant facilities.

An Intelligent Simulation of a Phosphoric Acid Plant (인산제조공정의 모사연구)

  • 여영구
    • Journal of the Korea Society for Simulation
    • /
    • v.3 no.1
    • /
    • pp.167-178
    • /
    • 1994
  • For the identification of the optimal operating conditions of phosphoric acid plant, an intelligent simulation was performed based on the dissolution reaction of phosphate rock. A phosphoric acid plant consists of three main processes : ball-mill grinding process, rock reaction process and slurry filteration process. The grinding and filteration processes are relatively simple processes and most of the simulation works are on the reaction process. The practical operation data of phosphoric acid plant at Namhae Chemical Corp. were utilized in the simulation. The operation of the phosphoric acid plant is highly dependent on the heuristics of operators and so the expert system technology was employed. The operation of phosphoric acid plant varies with the origin of phosphate rock. Results of the simulation showed the optimal values of major process variables and optimal operating conditions. The knowledgebase for the expert system was constructed based on the interview with the experienced plant operators.

  • PDF

Design of a Plant Life Cycle Data Management System for Plant Operation and Maintenance (플랜트 설계 및 운영 데이터 통합관리 시스템 설계)

  • Lee, Jae Hyun;Suh, Hyo Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.42 no.3
    • /
    • pp.241-248
    • /
    • 2016
  • Plant life cycle consists of design, construction, certification, operation, and maintenance phases, and various and enormous plant life cycle data is involved in each phase. Plant life cycle data should be linked with each other based on its proper relationships, so that plant operators can access necessary plant data during their regular operations and maintenance works. Currently, the relationships of plant life cycle data may not be defined explicitly, or they are scattered over several plant information systems. This paper proposes high level design of a plant life cycle data management system based on pre-defined plant life cycle database design. ISO-15926 standard is adapted for the database design. User-interface designs of the plant life cycle data management system are explained based on analysis of plant owners' requirements. A conceptual design of the database is also described with the entity-relationship diagram.

A Study on the Improvement of Optimal Load Range for Sliding Pressure Operation of coal-fired Power Plant (석탄화력 발전소 최적 변압운전 부하 범위 개선에 대한 연구)

  • Lee, Sang-Hun;Wang, Min-Seok;Wee, Sang-Bong;Son, Yung-Deug
    • Journal of IKEEE
    • /
    • v.23 no.2
    • /
    • pp.675-680
    • /
    • 2019
  • The coal-fired power plant is operated by a combined operation method, which is operated by sliding pressure operation under low load and by fixed pressure operation under high load for improved efficiency. The combined operation is divided into two and three valve open modes. Each plant is operated by selecting the turbine control valve mode in accordance with the manufacturer's recommendation, but is not really operating at the optimal sliding pressure operation according to load range, also Load range of each plant is configured differently. The internal efficiency of the high-pressure turbines is reduced due to loss of the turbine valves and the plant efficiency is reduced. To solve these problems, In this paper, the optimum load range is selected through the analysis method of thermal performance by each load in order to improve the optimum variable pressure operation load range by turbine control valve mode.

The study on Measuring of Environmental Radioactivity in the Vicinity of Yonggwang Nuclear Power Plant (영광 원자력 발전소 주변 환경 방사능 측정에 관한 연구)

  • 박종섭
    • Economic and Environmental Geology
    • /
    • v.32 no.3
    • /
    • pp.273-280
    • /
    • 1999
  • In order to protect inhabitans' health and to collect data for prediction of the effcts from accidental emission of rasioactive materials from nuclear power plant, exposed dose rate be monitored within the limit dose rate. This research was carried out to investigate the accumulation of environmental radioactivity around Younggwang Nuclear Power Plant, and to infer and in infer and assay the additional exposed dose rate of inhabitants in Younggwang site from the operation of nuclear plant operation. External radiation dose rate, radiation environmental samples, and exposed dose rate of inhabitants in Younggwang site were investigated for estimaing environment activity in the vicinity of the nuclear power plant area. For the external radiation dose rate, the result showed that range of normal variation was found and any artificial radioisotope was not deteted in the analysis of environmental samples. Exposed dose rate of inhabitants was lower than 0.4% of the limit value of ICRP and it may be concluded that there was no effect on inhabitants and environment from the operation of nuclear power plant.

  • PDF

Development of Dynamic Simulation Software for Power Plant and its Application to Once-Through Boiler (플랜트 동특성 해석용 소프트웨어 개발 및 초임계압 관류형 보일러에의 적용)

  • Lee, Ki-Hyun;Lee, Dong-Su;Cho, Chang-Ho
    • Proceedings of the KSME Conference
    • /
    • 2000.11b
    • /
    • pp.656-661
    • /
    • 2000
  • In the recent trend of electric power supply market, a variable pressure operation supercritical once-through steam generator is highlighted as a thermal power plant for cycling load because of its superiority in load regulation. Almost all thermal power plants of the future are expected to be variable pressure operation supercritical once-through units. APESS(Advanced Plant Engineering & Simulation System) is a dynamic simulation software for power plant which is under being developed by Korea Heavy Industries & Construction Co., Ltd. This paper present the introduction of APESS and the result of simulation for variable pressure operation supercritical once-through steam generator.

  • PDF

EXTENSION OF OPERATIONAL LIFE-TIME OF WWER-440/213 TYPE UNITS AT PAKS NUCLEAR POWER PLANT

  • Katona, Tamas Janos;Ratkai, Sandor
    • Nuclear Engineering and Technology
    • /
    • v.40 no.4
    • /
    • pp.269-276
    • /
    • 2008
  • Operational license of WWER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Prolongation by additional 20 years of the operational lifetime is feasible. Moreover, enhancement of the reactor thermal power by 8% will increase both the net power output and the competitiveness of the plant. Paks NPP is a pioneer considering the power up-rate and preparation of long-term operation of WWER-440/213 design. Systematic preparatory work for long-term operation of Paks NPP has been started in 2000. A regulatory framework and a comprehensive engineering practice have been developed. According to the authors view, creation of a gapless engineering system via consequent application of best practices, and feed-back of experiences together with proper consideration of WWER-440/V213 features are the decisive elements of ensuring the safety of long-term operation. That systematic engineering approach is in the focus of recent paper. Key elements of justification and measures for ensuring the safety of long-term operation of Paks NPP WWER-440/213 units are identified and discussed. These are the assessment of plant condition and review of adequacy of ageing management programmes, also the review, validation and reconstitution of time limited ageing analyses as core tasks of licence renewal.