• 제목/요약/키워드: plan-based model

Search Result 1,636, Processing Time 0.032 seconds

Optimal three step-stress accelerated life tests for Type-I hybrid censored data

  • Moon, Gyoung Ae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.26 no.1
    • /
    • pp.271-280
    • /
    • 2015
  • In this paper, the maximum likelihood estimators for parameters are derived under three step-stress accelerated life tests for Type-I hybrid censored data. The exponential distribution and the cumulative exposure model are considered based on the assumption that a log quadratic relationship exits between stress and the mean lifetime ${\theta}$. The test plan to search optimal stress change times minimizing the asymptotic variance of maximum likelihood estimators are presented. A numerical example to illustrate the proposed inferential procedures and some simulation results to investigate the sensitivity of the optimal stress change times by the guessed parameters are given.

A Study on Unmanned Post Office Service Model for the Disabled Person (무인우체국 장애인 서비스 모델 수립에 관한 연구)

  • Choi, Jiyoung;Lee, Jeong-hun;Kim, Jaechul
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.1-14
    • /
    • 2017
  • Recently, despite the presence of a large number of people with disabilities, facilities and services for the disabled are insufficient in comparison with the advanced countries. Especially, unmanned facilities and devices are not available for disabled people without help. As interest in disabled people increased, the convenient facilities for the disabled person should be legally installed in the public places. Moreover, social consensus formation and technical approaches are being actively pursued. In this paper, we propose a five-step scenario to use an unmanned post office. Based on the proposed scenario, we present the method to improve the accessibility of the user interface of the unmanned facilities. And we present a plan for establishing the short- and medium-term service models. This plan is expected to be highly practicable because it reflects the current situations of Korea Post and analysis result of the domestic and oversea cases.

An ERP Customizing Methodology Based on Process Model

  • Park, Ji-Hyun;Shon, Joo-Chan;Baik, Jong-Myoung
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.467-475
    • /
    • 2001
  • As a result of the policy for enforcing the information technology led by government and the effort of companies to get over economic crisis through the reformation of business process, the ERP market is being active. However, because imported ERP products that are supplied currently are designed for standard and rationality, they have a limit to support custom processes of domestic companies in South Korea. On the contrary, ERP products by domestic companies in South Korea are unable to support a consistent methodology of constructing ERP system. This is main reason why much time and costs are consumed than that of an original plan. To succeed in ERP construction, the purpose of ERP setup must be defined. To accomplish this end, it is required to analysis business process completely and to make a plan in detail. For ERP providers, they must support a characterized ERP construction methodology and lower the construction cost by improving an ERP package easy to customize[5].

  • PDF

COLLABORATIVE PROCESS PLANNING AND FLOW ANALYSIS FOR AUTOMOTIVE ASSEMBLY SHOPS

  • Noh, S.D.;Kim, G.
    • International Journal of Automotive Technology
    • /
    • v.7 no.2
    • /
    • pp.217-226
    • /
    • 2006
  • To maintain competitiveness in the modern automotive market, it is important to carry out process planning concurrently with new car development processes. Process planners need to make decisions concurrently and collaboratively in order to reduce manufacturing preparation time for developing a new car. Automated generation of a simulation model by using the integrated process plan database can reduce time consumed for carrying out a simulation and allow a consistent model to be used throughout. In this research, we developed a web-based system for concurrent and collaborative process planning and flow analysis for an automotive general assembly using web, database, and simulation technology. A single integrated database is designed to automatically generate simulation models from process plans without having to rework the data. This system enables process planners to evaluate their decisions quickly, considering various factors, and easily share their opinions with others. By using this collaborative system, time and cost put into the assembly process planning can be reduced and the reliability of the process plan would be improved.

The Study about a plan to develop an ITSM building framework applied ITIL Continuous Service Improvement Process (ITIL 프로세스 개선 모델을 적용한 ITSM 구축 모형 개발 방안에 관한 연구)

  • Kwon, Sang-Kook;Kim, Jeong-Jung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.134-141
    • /
    • 2006
  • Today, the role of IT is so important that it is regarded as a partner of business, not a simple supporter. The more important the role of IT becomes, the higher the level of business needs rises and the more customers want. In the market of IT, more and more enterprises are establishing ITSM processes based on the ITIL for these environments: however they are experiencing the processes of trial and errors because of the shortage of references To improve these problems, in this study, we developed the ITSM model defined by investigation of the instance to which we have applied the ITIL Continuous Service Improvement Process which contains five phases such as High level Business Objectives. Assessment. Measurable Targets, Process Improvement, Measurement and Metrics. This model is an ITSM building framework to understand the concepts over the length and breadth of ITIL and minimize the trial and errors appearing during the building of the ITSM processes, and this paper presents a plan to develop the frameworks.

  • PDF

Validation of NCS based Vocational Curriculum Procedures Developing Models Recognized by National Competency Standards Experts (국가직무능력표준 개발 전문가들이 인식하는 NCS 기반 직업교육과정 개발 절차 모형의 타당화)

  • Kim, Dong-Yeon;Kim, Jinsoo
    • 대한공업교육학회지
    • /
    • v.40 no.1
    • /
    • pp.64-86
    • /
    • 2015
  • The objective of this study is to develop NCS-based vocational curriculum procedures developing models recognized by experts in the National Skill Standards and to verify them. As for a research method for efficiently achieving this study, Delphi research has been conducted three times based on the result of preliminary Delphi investigation, contents of in-depth interview (review and advice), and consideration of previous studies and literature research related to NCS in Korea and abroad. Major results of study in regard of validation of NCS-based vocational curriculum procedures developing models recognized by experts of National Skill Standards are as follows. First, validity of conceptual model(plan) of NCS-based vocational curriculum developing procedures was verified. According to the result of implementing it on 10 members of verification for Delphi preliminary investigation tools, the average was higher than 4.70, and validity of contents was turned out to be outstanding in 1.00. Secondly, validity of conceptual model(plan) of NCS-based vocational curriculum developing procedures was verified by using Delphi preliminary investigation tools. According to the result of verifying it in order on 10 members of verification for Delphi preliminary investigation tools, validity of contents on questions in each area from the development procedures model(plan) was all 1.00, and appropriateness of contents on the components was turned out to be outstanding in 1.00. In addition, validity of contents on interrelation and comprehensiveness of components in the development procedures model(plan) was all turned out to be very satisfying in 1.00. Third, Delphi investigation was implemented in three rounds on 26 Delphi panel members for the verification. As a result consistency rate of interrelation and comprehensiveness among questions in each area of development procedures model(plan), components on the contents, and elements was turned out to be outstanding in .75 from all of three rounds. Here, consistency rate from all three rounds was turned out to be 1.00, and convergence rate was shown to be .00 that very well satisfied the conditions(except for 1 question out of 29). Therefore, it was confirmed that opinion from Delphi panel members was completely consistent in the third round of Delphi investigation research. Such a result in the study was from how Delphi selection criteria were strictly reinforced, and, at the same time, implies how will of participation of Delphi panel members was important.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing (임대공동주택 구성재의 열화도 패턴에 관한 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

A study on the Housing Choice of the Elderly according to the Financial Retirement Planning of Pre-seniors (예비 고령자의 경제적 은퇴계획에 따른 고령자 주택선택에 관한 연구)

  • Kim, Chang-Gon;Lee, Joo-Hyung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.2
    • /
    • pp.175-189
    • /
    • 2015
  • This study analyzed the determinant factors of elderly housing by housing type according to the Financial Retirement plan of preliminary elders and it aimed to draw a future development scheme of elderly housing. This study used parameters of existing research as control variables and it has a meaningful point that the variables of Financial Retirement plan of elders were verified through the research model which this study used. In addition, there was a difference between the detailed models. As a comprehensive analysis result, the Choice Model of elderly housing type has a difference between determinants, the single-family housing and the multi-family housing, based on the Welfare Facility for the Aged from Financial Retirement plan of elders.