• 제목/요약/키워드: plan-based model

검색결과 1,636건 처리시간 0.025초

패스트 패션의 재고비용 최적화를 위한 상품공급 물량 산정 모델 (A Computation Model of the Quantity Supplied to Optimize Inventory Costs for Fast Fashion Industry)

  • 박현성;박광호;김태영
    • 산업경영시스템학회지
    • /
    • 제35권1호
    • /
    • pp.66-78
    • /
    • 2012
  • This paper proposes a computation model of the quantity supplied to optimize inventory costs for the fast fashion. The model is based on a forecasting, a store and production capacity, an assortment planning and quick response model for fast fashion retailers, respectively. It is critical to develop a standardized business process and mathematical model to respond market trends and customer requirements in the fast fashion industry. Thus, we define a product supply model that consists of forecasting, assortment plan, store capacity plan based on the visual merchandising, and production capacity plan considering quick response of the fast fashion retailers. For the forecasting, the decomposition method and multiple regression model are applied. In order to optimize inventory costs. A heuristic algorithm for the quantity supplied is designed based on the assortment plan, store capacity plan and production capacity plan. It is shown that the heuristic algorithm produces a feasible solution which outperforms the average inventory cost of a global fast fashion company.

Development Method for Teaching-Learning Plan of Computer Education using Concrete Instructional Model Framework

  • Lee, Jaemu
    • 한국컴퓨터정보학회논문지
    • /
    • 제22권10호
    • /
    • pp.129-135
    • /
    • 2017
  • This research is to identify an easy and effective method of teaching-learning plan. The teaching-learning plan is a blue_print applied for designing effective lessons. However, most of the teachers regard it as a difficult and inefficient job. This study proposed the concrete instructional model framework as a tool to develop the teaching-learning plan easily and effectively. The concrete instructional model framework will represent a decomposed instructional strategy applied for each step of the instructional model developed by educational researchers. This method is applied to develop a computer teaching-learning plan. Therefore, the proposed method will expand an easier teaching-learning plan. Furthermore, the proposed method develops a teaching-learning plan with fluent content in detail based on low-level instruction strategies applied in the concrete instruction model framework.

Optimization of Train Working Plan based on Multiobjective Bi-level Programming Model

  • Hai, Xiaowei;Zhao, Chanchan
    • Journal of Information Processing Systems
    • /
    • 제14권2호
    • /
    • pp.487-498
    • /
    • 2018
  • The purpose of the high-speed railway construction is to better satisfy passenger travel demands. Accordingly, the design of the train working plan must also take a full account of the interests of passengers. Aiming at problems, such as the complex transport organization and different speed trains coexisting, combined with the existing research on the train working plan optimization model, the multiobjective bi-level programming model of the high-speed railway passenger train working plan was established. This model considers the interests of passengers as the center and also takes into account the interests of railway transport enterprises. Specifically, passenger travel cost and travel time minimizations are both considered as the objectives of upper-level programming, whereas railway enterprise profit maximization is regarded as the objective of the lower-level programming. The model solution algorithm based on genetic algorithm was proposed. Through an example analysis, the feasibility and rationality of the model and algorithm were proved.

Design of a Life Test Sampling Plan Based on the Cost Model

  • Kwon, Young-Il
    • International Journal of Reliability and Applications
    • /
    • 제6권1호
    • /
    • pp.31-39
    • /
    • 2005
  • An economic life test sampling plan for products with exponential lifetime distribution is developed. To reduce test time, a test plan with curtailed Type II censoring is considered. A cost model is constructed which involves three cost components; test cost, accept cost, and reject cost. Determination of optimal plan minimizing the expected average cost per lot is discussed with a constraint related to consumer's risk. Some numerical examples are provided.

  • PDF

관광매력물시스템모형과 관광목적지역디자인모형을 응용한 동부산권관광단지개발계획안 분석에 관한 연구 (A Study on the Application of the Tourist Attraction System Model and the Tourism Destination Region Design Model to Analyzing the Eastern Pusan Resort Master Plan)

  • 양위주
    • 한국항만학회지
    • /
    • 제14권3호
    • /
    • pp.279-290
    • /
    • 2000
  • The purpose of this study is to suggest the analytical framework for a spatial structure of a tourism destination master plan by the two types of the tourism development models: Tourist attraction System Model and Tourism Destination Region Design Model. The resort development plan is introduced as a planning tool for regenerating the eastern Pusan regions, but the economic and environmental impacts and the sociocultural dilemma accompanied by the development should be fully considered before launching the business. The development plan announced currently is traced and examined in comparison with the upper-leveled and related plans. The Tourist Attraction System Model based on the systems theory is applied to the designated regions. The Tourism Destination Region Design Model then is applied for analyzing the components of each region on the master plan. The results of the findings suggest that the tourism destination plan is basically different from a general master plan on the physical comprehensive plan, the destination is recognized as a subsystem of the whole tourism system, and thus tourism destination plan is considered as a spatial arrangement of tourism facilities and the inter- and intra-circulation.

  • PDF

IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례 (A study of actual planning how to increase IT productivity by COCOMO II Model)

  • 박철구;김창은
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

An investigation on plan geometries of RC buildings: with or without projections in plan

  • Inan, Tugba;Korkmaz, Koray;Cagatay, Ismail H.
    • Computers and Concrete
    • /
    • 제9권6호
    • /
    • pp.439-455
    • /
    • 2012
  • The interaction of plan geometry and structural configuration, a determinative factor in the earthquake behavior of buildings, has become a serious issue in the building industry in Turkey due to the poor seismic performance of R/C buildings during the latest earthquake. Consequently, designing new buildings without structural irregularities against earthquake loads is proving to be more significant. This study focuses on the effects of plan geometries on earthquake performances of buildings. In that respect, structural irregularities in the plan are investigated in detail based on the Turkish Earthquake Code (TEC 2007). The study is based on five main parametric models and a total of 40 sub-models that are grouped according to their plan geometries with excessive projections such as L-shaped, H-shaped, T-shaped and U-shaped models. In addition to these, a square model without any projections is also generated. All models are designed to have the same storey gross area but with different number of storeys. Changes in the earthquake behavior of buildings were evaluated according to the number of storeys, the projection ratios and the symmetry conditions of each model. The analysis of each structural irregularity resulted in many findings, which were then assessed. The study demonstrates that the square model delivers the best earthquake performance owing to its regular plan geometry.

화학사고 발생 시 피해예측 모델과 연계된 사업장의 실시간 비상대응 체계에 관한 연구 (The Research on the Real-time Emergency Response Plan for the Company based on Consequence Analysis for Chemical Accidents)

  • 하준호;이창준
    • 한국안전학회지
    • /
    • 제39권2호
    • /
    • pp.28-37
    • /
    • 2024
  • The recent surge in the production and handling of hazardous materials in Korea necessitates developing and implementing robust emergency response plans. These plans are crucial in safeguarding the well-being of workers and residents in the event of an incident. The consequence analysis methodology outlined in the KOSHA guidelines provides a foundation for designing emergency response plans in the event of chemical accidents. However, the consequence analysis is evaluated based on assumed accident cases or worst-case scenarios. Consequently, the emergency response plan based on the consequence analysis may overestimate the damage area, complicating rescue efforts and unnecessarily increasing costs. More information and parameters become available after an accident, enabling more accurate consequence analysis. This implies that the results of consequence analysis based on this detailed information provide more realistic results than those based on assumed accidents. This study attempts to optimize the resource allocation and cost-effectiveness of emergency response plans for chemical accidents. Existing procedures and manuals are revised to elucidate the proposed model and conduct real-time consequence analysis. The existing emergency response plan is compared to verify the proposed model's efficacy. The obtained results indicate that the proposed model can exhibit better performance.

이웃협정에 의한 협조형 도시주택의 모델개발에 관한 연구 -순천시의 도심주택지에 있어서 케이스스터디 - (A Study on Model Development of Cooperative Urban Housing by Neighborhood Agreement - Case Study on the Inner Residential Area, Sunchon City -)

  • 김영석
    • 한국주거학회논문집
    • /
    • 제14권6호
    • /
    • pp.193-204
    • /
    • 2003
  • In connection with the plan for improving the residential environment gradually by analyzing the present condition of the reconstruction and parcel form of the housing area in a inner area, the main objective of this research is to develop a cooperative urban housing model based on the neighborhood agreement. The parcel form has a structure that is inappropriate for individual reconstruction; thus, the substantial improvement only through the residential environment improvement project has its limitations. As an alternative plan to resolve such limitations, I proposed a system that enables step-by-step reconstruction within the small-scaled blocks through the annexation of the land based on the neighborhood agreement. Nonetheless, I realized that it is difficult to apply such reconstruction system to individual housing. Therefore, I presented a design concept on the cooperative urban housing project as a residential form for the reconstruction inside blocks. A model plan vouches for its effectiveness. To apply substantially the cooperative urban housing plan based on the neighborhood agreement, we need to supplement the sectional plan system.

Strategic Model Design based on Core Competencies for Innovation in Engineering Education

  • Seung-Woo LEE;Sangwon LEE
    • International journal of advanced smart convergence
    • /
    • 제12권3호
    • /
    • pp.141-148
    • /
    • 2023
  • As the direction of education in the fourth industry in the 21st century, convergence talent education that emphasizes the connection and convergence between core competency-based education and academia is emerging to foster creative talent. The purpose of this paper is to present the criteria for evaluating the competency of learning outcomes in order to develop a strategic model for innovation in engineering teaching-learning. In this paper, as a study to establish the direction of implementation of convergence talent education, a creative innovation teaching method support system was established to improve the quality of convergence talent education. Firstly, a plan to develop a teaching-learning model based on computing thinking. Secondly, it presented the development of a teaching-learning model based on linkage and convergence learning. Thirdly, we would like to present educational appropriateness and ease based on convergence learning in connection with curriculum improvement strategies based on computing thinking skills. Finally, we would like to present a strategic model development plan for innovation in engineering teaching-learning that applies the convergence talent education program.