• Title/Summary/Keyword: plan stage

Search Result 1,152, Processing Time 0.024 seconds

Establishment of Ecological Environment Plan Item on Urban Development Stages (도시개발 사업 단계별 생태환경계획수립 항목 설정에 관한 연구)

  • Lee, Eun Yeob;Kang, Myung Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.4
    • /
    • pp.12-23
    • /
    • 2008
  • This study has a purpose of setting applicable ecological environment plan items when establishing city development plan. To achieve this purpose, multiple methods of data gathering, documentary surveys, and questionaries research were used in this study. The main findings of this study can be summarized as follows; 1. The appliance of ecological environment plan is appropriate to apply before the establishment of development plan. 2. The items applicable to ecological environment plan establishment step by step is the following. First, it is necessary to prepare the environment improvement plan and ecology restoration on the stage of assigning the area. Second, on the stage of planning development plan, it is required to set the restoration plan of ecological resources and step by step ecological environment plan. Third, on the stage of plan implementation, it is required to set the maintenance guide on ecological environment. 3. The planning items of ecological environment plan are "geographical features and soil", "water resource", "wind resource", "green resource", "circulation of resource", "usage of nature energy" and "habitats", etc. 4. To apply ecological environment plan to the planning of development, it is necessary to specify the clear concepts and specific plan. 5. This study is limited to select generalized planning items and later on, it is necessary to develop detailed planning contents.

Hybrid Group-Sequential Conditional-Bayes Approaches to the Double Sampling Plans

  • Seong-gon Ko
    • Communications for Statistical Applications and Methods
    • /
    • v.5 no.1
    • /
    • pp.107-120
    • /
    • 1998
  • This research aims here to develop a certain extended double sampling plan, EDS, which is an extension of ordinary double sampling plan in the sense that the second-stage sampling effort and second-stage critical value are allowed to depend on the point at which the first-stage continuation region is traversed. For purpose of comparison, single sampling plan, optimal ordinary double sampling plan(ODS) and sequential probability ratio test are considered with the same overall error rates, respectively. It is observed that the EDS idea allows less sampling effort than the optimal ODS.

  • PDF

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

A Study on the Changes of the Plan Type of Protestant Church Architecture in Korea - Focused on the distinction between the sexes(男女有別) and the seat position of the sexes - (한국 개신교 교회건축의 평면형태 변천 연구 - '남녀유별' 관념과 회중석의 남녀 위치를 중심으로 -)

  • Lee, Hee-Jun;Yoon, In-Suk
    • Journal of architectural history
    • /
    • v.14 no.3 s.43
    • /
    • pp.129-148
    • /
    • 2005
  • The plan type of Korean protestant church architecture underwent changes as following five stages according to the changes of the distinction between the sexes. First stage - At the beginning of missionary work in Korea, Koreans generally worshiped in missionary houses which were traditional Korean styles. The plan type of these houses was a simple '-' figure. At that time, men and women worshiped separately because of the idea of the distinction between the sexes. They either worshiped in different places at the same time or in the same place at the different time. Second stage - At this stage, men and women started to worship together in the same place. At the beginning of this stage, men sat in the front of the chapel on a rostrum, and women sat behind the men. The plan type of the chapel was a simple '-' or a rectangular figure. Later, they sat separately on the right and left side. There are the visual interceptions which were set up between them. As the number of church members increased rapidly, a new type of church architecture appeared. It was a 'ㄱ' figure. At that time the entrances were separated by the sexes. Third stage - At this stage, the visual interceptions disappeared as the idea of the distinction between the sexes became weak. As new churches had been constructed by the plan type of rectangular figure, the visual interceptions weren't set up anymore. Fourth stage - At this stage, the separated entrances were unified as one. But the arrangement of their seats didn't change because of the old idea of the distinction between the sexes. Fifth stage - In the final stage, the plan type of the church architecture was not determined by the idea of the distinction between the sexes but social, economical, technological facts and the influence of the foreign architecture. At this stage, new and various kinds of the plan type appeared such as the fan, round, squared, or oval figure as well as the rectangular figure. Men and women were not classified anymore. They started to sit and worship together in the same place. Also, when men and women sat separately from side to side because of the Idea of the distinction between the sexes, men sat on the right and women sat on the left side of rostrum. It didn't applied Confucian ideas but the idea of protestant church; protestant churches have the idea that the right side is more important but it does not in Confucianism.

  • PDF

A Study on Spatial Planning Management Methods in Small and Medium Cities in Jeollanam-do (전라남도 중소도시의 공간계획 관리 방안 연구)

  • Han, Da-Hyuck;Lee, Min-Seok
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.4
    • /
    • pp.55-62
    • /
    • 2021
  • This study conducted a management system and business analysis related to urban and architecture in local small and medium cities. The current status of the management department of the master plans, which were established based on the laws related to the spatial environment and implemented projects based on them, was analyzed, and the problems were derived. The basic urban master plan of the local government is classified as a hierarchical higher plan than other plans established within the same city, but there was a problem in that the timing of each plan was different. As a problem, the contents of the sub-plan were not included in the upper plan, or the opposite phenomenon occurred. In addition, the management entity of the master plan and sub-projects was different. To solve this problem, it is necessary to form a consistent structure of systematic planning and management subjects. In addition, in the future planning stage, it is necessary to establish a master plan establishment system according to hierarchies. This study is meaningful in that it can be used to establish a master plan establishment system according to hierarchy in the future planning stage and to establish the same management entity as the master plan in the projects stage.

A Time Truncated Two-Stage Group Sampling Plan for Weibull Distribution

  • Aslam, Muhammad;Jun, Chi-Hyuck;Rasool, Mujahid;Ahmad, Munir
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.1
    • /
    • pp.89-98
    • /
    • 2010
  • In this paper, a two-stage group sampling plan based on the time truncated life test is proposed for the Weibull distribution. The design parameters such as the number of groups and the acceptance number in each stage are determined by satisfying the producer's and consumer's risks simultaneously when the group size and the test duration are specified. The acceptable reliability level is expressed by the ratio of the true mean life to the specified life. It was demonstrated from the comparison with single-stage group sampling plans that the proposed plan can reduce the average sample number or improve the operating characteristics.

A Study on the Site Plan of the Contemporary Architecture in Jeju -Focused on the Comparative Study of Culture and Meeting Facilities in Domestic and Jeju- (제주지역 현대건축의 배치계획특성에 관한 연구 -국내 및 제주의 문화·집회시설에 관한 비교분석을 중심으로-)

  • Hong, Kwang-Taik;Park, Chung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.117-124
    • /
    • 2010
  • This study has the purpose to examine the elements of deducing site plan of contemporary architecture in Jeju by looking into the mainly used measures and value in establishing the site plan of contemporary architecture of Jeju. Being the initial decision making stage that serves as basis in creating design alternative and completes overall designing alternative frame, Site plan is the core stage of initial architectural planning. In addition, analysis of site plan concept the central overall idea for site plan offers the perspective to access the problem for solution in site plan. Therefore, through the analysis of elements to deduce the site plan concept of the contemporary architecture in Jeju, the characteristics of site plan concept that considered the placement and locality of Jeju can be objectively examined in planning out the site plan of contemporary architecture in Jeju, and such analysis results may become objective basic data in planning out the site plan of the contemporary architecture in Jeju.

Automation of laser scanning and registration of measured data using a 3-axis motorized stage (3축 전동테이블을 이용한 레이저 스캐너의 측정 및 레지스트레이션 자동화)

  • Son, Seok-Bae;Kim, Seung-Man;Lee, Kwan-Heng
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.134-139
    • /
    • 2001
  • Laser scanners are widely used for reverse engineering and inspection of freeform parts in industry such as motors, electronic products, dies and molds. Due to the lack of measuring software and positioning device, the laser scanning processes have been erroneous and inconsistent. In order to automate measuring processes, an automated scan plan generation software and a proprietary hardware are developed. In this paper, an automated laser scanning system using a 3-axis motorized stage is proposed. In the scan planning step, scan directions, paths, and the number of scans are generated considering optical and mechanical parameters. In the scanning step, the generated scan plan is downloaded into the laser scanner and the motorized stage and the points on the surface are captured automatically. Finally, the point data set is analyzed to evaluate the performance of the system.

  • PDF

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • v.20 no.3 s.57
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.