• Title/Summary/Keyword: pilot plant system

Search Result 291, Processing Time 0.045 seconds

System Study for Decision of Control Limits of UPFC Pilot Plant in Korea (강진 UPFC Pilot Plant의 제어 범위 산정을 위한 계통 해석)

  • Kim, Hak-Man;Kim, Jong-Yul;Kim, Jung-Ik;Oh, Tae-Kyoo;Lee, Hak-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.53-55
    • /
    • 2002
  • This paper presents a part of system study results for UPFC Pilot Plant application in Korea. The system study includes control limits of UPFC Pilot Plant. Expansion of control limits is studied by coordination to switched shunt capacitors in local areas. The system study is simulated by PSS/E Ver 26.

  • PDF

System Study for FACTS Pilot Plant Application (FACTS Pilot Plant 도입을 위한 기본 계통 해석)

  • Kim, H.M.;Chun, Y.H.;Jeon, J.H.;Kook, K.S.;Oh, T.K.;Lee, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.90-92
    • /
    • 2001
  • This Paper presents a part of system study results for UPFC Pilot Plant application in Korea. The system study includes short circuit rate of Kangjin S/S which is site of UPFC Pilot Plant, ${\Delta}V/{\Delta}Q$ characteristics in STATCOM mode, P and Q flow control boundary of UPFC Pilot Plant. The system study is simulated by PSS/E Ver. 26.

  • PDF

Removal of Toxicity from Kraft Pulp Mill Effluents by Activated Sludge Process (활성슬러지 공정에 의한 Kraft 펄프 폐수의 독성 제거)

  • Kim, Yeong-Kwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.8 no.3
    • /
    • pp.9-18
    • /
    • 1994
  • Activated sludge pilot plant testing was conducted to determine the ability of a well-designed activated sludge treatment system to remove chromic toxicity from the bleached kraft pulp mill effluent. Removals of conventional(BOD and SS) and nonconventional(resin and fatty acids, color, AOX) pollutants were estimated. The pilot plant was operated at steady state for about 10 weeks at an F/M of 0.28 and a sludge age of 8.4 days. The average MLSS concentration was 4,309mg/l, of which volatile fraction was 57%. During the operation period, the BOD removal reaction rate(k) was determined to be 8.2/day at $30^{\circ}C$. The BOD removal was 84 percent, which was 3 to 6 percent lower than expected for full-scale treatment. The chronic toxicity of the activated sludge effluent was tested by employing both Dinnel and the BML protocols. It was found that the pilot plant could achieve in excess of 90 percent reduction in chronic echinoderm toxicity. The data show slight reduction of color and AOX across the activated sludge system. The pilot system, however, demonstrated on excellent removal of resin and fatty acids.

  • PDF

Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation (II) -Development and Performance Evaluation of a Rice Mill Pilot Plant- (컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(II) -미곡 도정시스템의 개발 및 성능평가-)

  • 정종훈;김보곤;최영수
    • Journal of Biosystems Engineering
    • /
    • v.20 no.3
    • /
    • pp.262-274
    • /
    • 1995
  • A rice mill pilot plant was designed and developed in the basis of the simulation results on the mill plants. The performance of the developed rice mill plant was evaluated, and the simulation model on the mill system was validated with the experimental data in the mill plant. The results of this study were as followings : 1. A rice mill pilot plant with the capacity of 0.5 t/h was designed and developed. 2. The hulled ratio of the mill plant was 87.3%, and the milled rice recovery and the head rice recovery of the cleaned rice were 74% and 87% , respectively. The degree of milling of the cleaned rice was 10.6% with a high polish. The intensity of the cleaned rice appeared high compared with that of the milled rice in the analysis of whiteness test using an image processing system. 3. The bottleneck, processing time, and production amount of the developed mill system almost coincided with those of the simulation of the rice mill plant. The developed simulation model of the rice mill plant was proven to be applicable to the design of a rice mill plant through experiments.

  • PDF

Development of Pilot Plant for Distributed Intelligent Management System of Microgrids (멀티에이전트 시스템을 이용한 마이크로그리드 분산 지능형 관리시스템 파일럿 플랜트 개발)

  • Oh, Sang-Jin;Yoo, Cheol-Hee;Chung, Il-Yop;Lim, Jae-Bong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.322-331
    • /
    • 2013
  • This paper describes the development of the pilot plant of distributed intelligent management system for a microgrid. For optimal control and management of microgrids, intelligent agents area applied to the microgrid management system. Each agent includes intelligent algorithms to make decisions on behalf of the corresponding microgrid entity such as distributed generators, local loads, and so on. To this end, each agent has its own resources to evaluate the system conditions by collecting local information and also communicating with other agents. This paper presents key features of the data communication and management of the developed pilot plant such as the construction of mesh network using local wireless communication techniques, the autonomous agent coordination schemes using plug-and-play functions of agents and contract net protocol (CNP) for decision-making. The performance of the pilot plant and developed algorithms are verified via real-time microgrid test bench based on hardware-in-the-loop simulation systems.

Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation -Simulation of a Rice Mill Pilot Plant- (컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(I) -미곡 도정 시스템의 시뮬레이션-)

  • 정종훈;김보곤
    • Journal of Biosystems Engineering
    • /
    • v.20 no.1
    • /
    • pp.47-57
    • /
    • 1995
  • Rice Processing Complex(RPC) have being constructed with a rice mill plant and a facility of drying and storage to overcome problems caused by UR and to produce good quality of rice. An optimal design of a rice mill plant was required to successfully construct and operate it. The development of a simulation model was essential to the design of a rice mill plant. So, all the objectives of this study were to develop a simulation model for the design of a rice mill plant and to develop and evaluate the rice mill system. In this study the simulation model was developed to design a rice mill plant using SLAMSYSTEM, one of simulation languages. The results of this study were as followings. 1. A simulation model was developed with SLAMSYSTEM to represent the processes of a rice mill plant. The simulation model was used to design a rice mill pilot plant with the capacity of 0.5 ton per hour. The rice mill pilot plant was analyzed by the model with alternatives. 2. In the simulation the rice mill system was much influenced by the separating efficiency of a brown rice separator. Especially, the bottleneck of grain flow occurred at the buffer tank for brown rica. separator under 50% separating efficiency of brown rice separator. Hence, as the alternative simulation was conducted under 60% , 70% separating efficiency of brown rice separator, the bottleneck of the system could be minimized at the 60% separating efficiency of brown rice separator. 3. In the alternative simulation the bottleneck of the system was minimized under the hulling capacity of 1 t/h and 60% separating efficiency of brown rice separator with the capacity of 1 t/h. Under such a condition the max. weight of waiting entities at buffer tanks was less 250kg. So, the capacities of the buffer tanks were determined in the basis of simulation results. 4. The milled rice recovery and head rice recovery of the milling system were 74% and 92% in the simulation, respectively. These results of simulation almost corresponded to those of actual rice mill plants. The developed simulation model could be well applied to design a rice mill plant.

  • PDF

Cryogenic Distillation Apparatus for Hydrogen Isotopes Separation (수소동위원소 분리를 위한 초저온증류장치)

  • 송규민;손순환;김광신;김위수
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2001.02a
    • /
    • pp.163-166
    • /
    • 2001
  • KEPCO has a plan to construct TRF (tritium removal facility) in wolsong nuclear power plant site by 2005. In advance of WTRF construction, the pilot plant was installed at KEPRI in order to show process reliability of WTRF. The main processes of this pilot plant are LPCE(liquid phase catalytic exchange) and CD (cryogenic distillation). Deuterium is separated from heavy water in LPCE process and concentrated in CD process. CD process consists of cold box, where are a distillation column and heat exchangers, vacuum system, cryogenic refrigerant supply system and instrument & control system. The experience of the pilot plant will be used in WTRF design review, operating procedure revision and fundamental education for the operators.

  • PDF

Design and Operation of 3MW Pilot Plant of $Mg(OH)_2$ Flue Gas Desulfurization Process

  • Kim, In-Won;Jin, Sang-Hwa;Choi, Byung-Moon;Lee, Hyung-Keun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.116.2-116
    • /
    • 2001
  • Korea Institute of Energy Research(KIER) has designed the 3MW pilot scale wet FGD process based on the experimental results of the bench scale FGD system which can treat 150 m3/hr of flue gases. The effects of process chemistry, packing material, and operating variables including L/G ratio, pH, scrubber pressure drop were investigated. In cooperation with Kyunggi Chemicals, the 3MW pilot scale plant was established on the industrial site at Onsan, Korea. This system has been operating since October 1999. This paper introduces an outline of the design features of the pilot plant and discusses its operational results.

  • PDF

Effect of post-treatment routes on the performance of PVDF-TEOS hollow fiber membranes

  • Shadia R. Tewfik;Mohamed H. Sorour;Hayam F. Shaalan;Heba A. Hani;Abdelghani G. Abulnour;Marwa M. El Sayed;Yomna O. Mostafa;Mahmoud A. Eltoukhy
    • Membrane and Water Treatment
    • /
    • v.14 no.2
    • /
    • pp.85-93
    • /
    • 2023
  • Membrane separation is widely used for several applications such as water treatment, membrane reactors and climate change. Cross-linked organic-inorganic hybrid polyvinylidene fluoride (PVDF) / Tetraethyl orthosilicate (TEOS) was adopted for the preparation of optimized hollow membrane (HFM) for membrane distillation or other low pressure separators for mechanical properties and permeability under varying pretreatment schemes. HFMs were prepared on semi-pilot membrane fabrication system. Novel adopted post-treatment schemes involved soaking in glycerol, magnesium sulphate (MgSO4), sodium hypochlorite (NaOCl), and isopropanol for different durations. All fibers were characterized for morphology using a scanning electron microscope (SEM), surface roughness using atomic force microscope (AFM), elemental composition by examining Energy Dispersive Spectroscopy (EDS), water contact angle (CA°) and porosity. The performance of the fibers was evaluated for pure water permeation flux (PWF). Post-treatment with MgSO4 gave the highest both tensile modulus and flux. Assessment of properties and performance revealed comparable results with other organic-inorganic separators, HF or flat. In spite of few reported data on post treatment using MgSO4 in presence of TEOS, this proves the potential of low cost treatment without negative impact on other membrane properties. The flux is also comparable with hypochlorite which manifests substantial precaution requirements in actual industrial use.The relatively high values of flux/bar for sample treated with TEOS, post treated with MgSO4 and hypochlorite are 88 and 82 LMH/bar respectively.