• Title/Summary/Keyword: pier

Search Result 888, Processing Time 0.031 seconds

An Exploratory Study For the Social Feasibility Of the Dredging the Water-Depth of Busan Port (부산항 컨테이너터미널의 증심준설에 관한 사회적 타당성 분석을 위한 탐색적 연구)

  • Kim, Chul-Min;Hong, Han-Gook
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.13 no.5
    • /
    • pp.29-43
    • /
    • 2008
  • As the containership has been large-sized, it is important to analyze the social feasibility for the dredging the water-depth of Busan port. We tries to do an exploratory study to analyze the needs of the core port user group by using the survey methodology. We did the survey for the ocean carriers, terminal operating companies, ship pilots respectively. Collected data was analyzed by frequency and cross tabulation method. Result suggests that the Busan North Port should be dredged to the 16 meter depth and Busan New Port should be dredged to the 17 meter depth. And the priority of the depth dredging is ranked as Gamman pier, Sinsundae pier, New Port and Jasungdae pier.

  • PDF

Experimental Estimation of Shear Stresses at Pier-Front (교각전면부 하상재료의 입도분포에 따른 전단응력 산정에 관한 실험적 연구)

  • Park, Yoon Sung;Kang, Jun Ku;Yeo, Woon Kwang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.429-433
    • /
    • 2004
  • According to researchers, the influential factors of scouring are generally divided into three factors: the flow conditions, the type and position of structures, and the characteristics of bed materials. In addition, scouring is affected by the 3-dimensional turbulent boundaries, the unsteady flow, the movement of sediment in the scour-hole area, the approach flow velocity and depth, the width of bridge foundation/pier, and the particle size of bed materials. However, it is difficult to estimate the scour depth near bridge piers when all conditions are factored in at once. Therefore, for reasonably accurate estimates of scour depth, it is essential to consider sufficiently the flow force and resisting force for scour. That is, to determine the shear stress concerning the bed material distribution is needed. In this study, the experiments were performed under the condition of a steady state of flow. As a result, scouring occurred at velocity ratios of 0.476,$(V/V_c=0.476)$, and the scour depth was increased linearly as the velocity ratio increased. in addition, the average values of shear stress ratio at zero scouring depth in both rectangular and circular piers were approximately 7$(\tau_c/\tau_{approach})$ and in the case for same size bed particle material. The results of this study can be used for the fundamental material for estimating the scour depth of bed materials.

  • PDF

The measurement and evaluation of local scour at a bridge pier using the profiling scour monitoring system (프로파일링 세굴 모니터링 시스템을 이용한 교각 국부세굴 계측 및 평가)

  • Shin, Jong-Hyun;Park, Hyun-Il;Shin, Seung-Hyun;Park, Kyung-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.38-47
    • /
    • 2009
  • Scour means the erosion of bed material by flow change when a bridge is constructed in a stream. Scour is one of the critical factors of a bridge failure. There are several methods for the monitoring of scour near bridge foundations; Sounding rods, Magnetic sliding collar System, Sonar system, underwater camera system and so on. In general, Sonar system is preferred due to its convenience and good accuracy. In this study, the new scour monitoring system was developed using profiling sonar sensor. The new system can measure a line profile of a seabed and has small size due to the effectively designed data logger. The performance of the new scour monitoring system was evaluated at a bridge pier in tidal environment. The measured local scour depths were discussed with the result of the empirical formulas; CSU, Froehlich, Laursen and Neill.

  • PDF

2-D Analysis of the Low Flow Variation Around the Bridge Pier (교각 주변의 저수류 (低水流) 흐름 변화에 대한 2차원 분석)

  • Yeon, In-Sung;Lee, Jai-Kyung;Yeon, Gyu-Bang
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.91-97
    • /
    • 2009
  • The flow is changed by the structure which goes across the river. The structure with debris causes high water level and overflow. The changed flow, which caused by pier and stream characteristics like velocity and slope, was analysed by 2D model. After rainfall, the influences of increased discharge were evaluated. Velocity was simulated in the channel by SMS (Surface water Modeling System) using RMA2, and high velocity values were found in the steep and narrow reach. Highest velocity value around piers was showed in the middle of space between two piers. The increased discharge due to rainfall increases velocity and changes flow contour considerably.

Performance of Precast Composite Piers for Fast Construction (급속시공형 프리캐스트 합성교각의 성능)

  • Shim, Chang-Su;Chung, Young-Soo;Yoon, Jae-Young;Park, Ji-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.221-224
    • /
    • 2008
  • Recently various types of prefabricated pier has been developed. In this paper, prefabricated composite columns with core steel elements embedded in concrete were proposed, which has no prestressing. Based on the previous research on composite columns with low steel ratio, the column were designed. A simple bolt connection detail between a footing and a pier element were also suggested. In order to investigate the seismic performance of the composite columns, several tests on concrete encased composite columns, which are prefabricated, were performed. Quasi-static tests were carried out and their performance was evaluated and compared with the results from the tests on CIP composite piers. In the case of precast piers, the end part of the pier needs to be carefully reinforced and related recommendations on details were derived.

  • PDF

Design of Precast Circular Piers with Prestressing Bars (강봉으로 긴장한 프리캐스트 원형교각의 설계)

  • Shim, Chang-Su;Chung, Chul-Hun;Yoon, Jae-Young;Kim, Cheol-Hwan;Lee, Yong-Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.121-124
    • /
    • 2008
  • Fast construction of bridge substructures is a new trend of bridge design. A precast pier system with bonded prestressing bars was proposed. In this paper, quasi-static tests on precast prestressed piers were conducted to evaluate the seismic behavior of the precast piers with bonded prestressing bars. In order to strengthen the shear strength of the joints between column segments, steel tubes filled with mortar were used. Displacement ductility and energy dissipation capacity of the precast piers were evaluated. The suggested precast pier system showed better seismic performance than the required ductility. Based on the research results, an example bridge pier for light-railway lines was designed and design considerations were discussed.

  • PDF

An improved approach for multiple support response spectral analysis of a long-span high-pier railway bridge

  • Li, Lanping;bu, Yizhi;Jia, Hongyu;Zheng, Shixiong;Zhang, Deyi;Bi, Kaiming
    • Earthquakes and Structures
    • /
    • v.13 no.2
    • /
    • pp.193-200
    • /
    • 2017
  • To overcome the difficulty of performing multi-point response spectrum analysis for engineering structures under spatially varying ground motions (SVGM) using the general finite element code such as ANSYS, an approach has been developed by improving the modelling of the input ground motions in the spectral analysis. Based on the stochastic vibration analyses, the cross-power spectral density (c-PSD) matrix is adopted to model the stationary SVGM. The design response spectra are converted into the corresponding PSD model with appropriate coherency functions and apparent wave velocities. Then elements of c-PSD matrix are summarized in the row and the PSD matrix is transformed into the response spectra for a general spectral analysis. A long-span high-pier bridge under multiple support excitations is analyzed using the proposed approach considering the incoherence, wave-passage and site-response effects. The proposed approach is deemed to be an efficient numerical method that can be used for seismic analysis of large engineering structures under SVGM.

Prediction of scour around single vertical piers with different cross-section shapes

  • Bordbar, Amir;Sharifi, Soroosh;Hemida, Hassan
    • Ocean Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.43-58
    • /
    • 2021
  • In the present work, a 3D numerical model is proposed to study local scouring around single vertical piers with different cross-section shapes under steady-current flow. The model solves the flow field and sediment transport processes using a coupled approach. The flow field is obtained by solving the Unsteady Reynolds Averaged Navier-Stokes (URANS) equations in combination with the k-ω SST turbulence closure model and the sediment transport is considered using both bedload and suspended load models. The proposed model is validated against the empirical measurements of local scour around single vertical piers with circular, square, and diamond cross-section shapes obtained from the literature. The measurement of scour depth in equilibrium condition for the simulations reveal the differences of 4.6%, 6.7% and 13.1% from the experimental measurements for the circular, square, and diamond pier cases, respectively. The model displayed a remarkable performance in the prediction of scour around circular and square piers where horseshoe vortices (HSVs) have a leading impact on scour progression. On the other hand, the maximum deviation was found in the case of the diamond pier where HSVs are weak and have minimum impact on the formation of local scour. Overall, the results confirm that the prediction capability of the present model is almost independent of the strength of the formed HSVs and pier cross-section shapes.

Development of Smart Port Technology Introduction Priorities Using AHP Analysis - Focusing on the automation pier of Gwangyang Port - (AHP분석을 활용한 스마트항만 기술 도입 우선순위 도출 - 광양항 자동화부두를 중심으로 -)

  • Seung-Hoon Han;Seung-Hyun Ahn;Hye-Ryeong Lee
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.05a
    • /
    • pp.106-107
    • /
    • 2023
  • The purpose of this study is to derive priorities for the introduction of smart port technology by utilizing domestic and foreign prior research and AHP analysis to establish an automated pier at Gwangyang Port. In order to establish a hierarchical structure for smart port technology, R& D tasks, roadmaps, and literature related to domestic and foreign smart port technology were investigated to select two first-tier and six second-tier attributes and determine the hierarchical structure. ‥‥(중략)‥‥

  • PDF

Development of Bridge Design Guidelines in Kangwondo Mountain Area (강원도 산간계곡형 교량 설계 지침 개발)

  • Kim, Tae Nam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.63-70
    • /
    • 2008
  • The purpose of this study is development of bridge design guidelines in Kangwondo mountain area. Much damages heve been wrought by Typhoon Rusa(2002), Maemi(2003), Ewinniar(2006) and severe rain storm in July 2006 in Kangwondo mountain area. The partial cause of these much damages are not consider the regional and geomorphologic condition of river in Kangwondo mountain area. Most of the bridge damages were caused by severe wash out the foundation of pier and abutment. As other reasons, dead trees, branches of the trees and floating materials were catched by pier and deck which make difficult or cut off the flow. Design guidelines are presented by analysis the types and reasons of damages of the disaster.