• Title/Summary/Keyword: phase-to-ground fault

Search Result 144, Processing Time 0.022 seconds

A Study on Fault Characteristics of DFIG in Distribution Systems Based on the PSCAD/EMTDC (PSCAD/EMTDC를 이용한 풍력발전의 배전계통 사고특성에 관한 연구)

  • Son, Joon-Ho;Kim, Byung-Ki;Jeon, Jin-Taek;Rho, Dae-Seok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.2
    • /
    • pp.47-56
    • /
    • 2011
  • Korea Ministry of Knowledge Economy has estimated that wind power (WP) will be occupied 37% in 2020 and 42% in 2030 of the new energy sources, and also green energies such as photovoltaic (PV) and WP are expected to be interconnected with the distribution system because of Renewable Portfolio Standard (RPS) starting from 2012. However, when a large scale wind power plant (over 3[MW]) is connected to the traditional distribution system, protective devices (mainly OCR and OCGR of re-closer) will be occurred mal-function problems due to changed fault currents it be caused by Wye-grounded/Delta winding of interconnection transformer and %impedance of WP's turbine. Therefore, when Double-Fed Induction Generator (DFIG) of typical WP's Generator is connected into distribution system, this paper deals with analysis three-phase short, line to line short and a single line ground faults current by using the symmetrical components of fault analysis and PSCAD/EMTDC modeling.

Estimation of Motor Deterioration using Pulse Signal and Insulation Resistance Measurement Algorithm (펄스 신호 및 절연저항 측정 알고리즘을 이용한 전동기 열화 추정)

  • Jeong, Sungin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.5
    • /
    • pp.111-116
    • /
    • 2022
  • The causes of motor burnout include overload, phase loss, restraint, interlayer short circuit, winding ground fault, instantaneous overvoltage, and the rotor contacting the stator, leading to insulation breakdown, leading to breakdown or electrical accidents. Therefore, equipment failure causes not only loss due to cost required for equipment maintenance/repair, but also huge economic loss due to productivity decrease due to process stop because the process itself including the motor is stopped. The current level of technology for diagnosing motor failures uses vibration, heat, and power analysis methods, but there is a limit to analyzing the problems only after a considerable amount of time has passed according to the failure. Therefore, in this paper, a device and algorithm for measuring insulation resistance using DC AMP signal was applied to an industrial motor to solve this problem. And by following the insulation resistance state value, we propose a diagnosis of deterioration and failure of the motor that cannot be solved by the existing method.

LVRT Control Strategy of Grid-connected Wind Power System (계통 연계형 풍력 발전 시스템의 LVRT 제어 전략)

  • Shin, Ho-Joon;Sul, Seung-Ki
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.182-190
    • /
    • 2011
  • This paper proposes a LVRT (Low Voltage Ride Through) control strategy which should be satisfied by grid-connected wind power system when grid faults occur. The LVRT regulation indicates rules or actions which have to be executed according to the voltage dip ratio and the fault duration. Especially the wind power system has to support the grid with specified reactive current to secure the grid stability when voltage reduction ratio is over 10%. The LVRT regulation in this paper is based on the German Grid Code and full-scale variable speed wind power conversion system is considered for LVRT control strategy. The proposed LVRT control strategy satisfies not only LVRT regulation but also makes power balance between wind turbine and power system through additional DC link voltage regulation algorithms. Because it is impossible to control grid side power when the 3-phase to ground fault occurs, the DC link voltage is controlled by a generator side inverter using the DC link voltage control strategy. Through the simulation and experiment result, the proposed LVRT control strategy is evaluated and its effectiveness is verified.

A Simultaneous Perturbation Stochastic Approximation (SPSA)-Based Model Approximation and its Application for Power System Stabilizers

  • Ko, Hee-Sang;Lee, Kwang-Y.;Kim, Ho-Chan
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.4
    • /
    • pp.506-514
    • /
    • 2008
  • This paper presents an intelligent model; named as free model, approach for a closed-loop system identification using input and output data and its application to design a power system stabilizer (PSS). The free model concept is introduced as an alternative intelligent system technique to design a controller for such dynamic system, which is complex, difficult to know, or unknown, with input and output data only, and it does not require the detail knowledge of mathematical model for the system. In the free model, the data used has incremental forms using backward difference operators. The parameters of the free model can be obtained by simultaneous perturbation stochastic approximation (SPSA) method. A linear transformation is introduced to convert the free model into a linear model so that a conventional linear controller design method can be applied. In this paper, the feasibility of the proposed method is demonstrated in a one-machine infinite bus power system. The linear quadratic regulator (LQR) method is applied to the free model to design a PSS for the system, and compared with the conventional PSS. The proposed SPSA-based LQR controller is robust in different loading conditions and system failures such as the outage of a major transmission line or a three phase to ground fault which causes the change of the system structure.

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area (도심지 대심도 암반 굴착현장에서의 Face Mapping 적용사례)

  • Kim, Tae-Seob;Kim, Hyung-Min;Jo, Choong-Sick;Kang, Tae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1307-1316
    • /
    • 2009
  • In this case, powerfulness quorum of destruction side which we have expected are supposed general limit value for rock floor when retaining of earth on the section of rock floor in the urban area. For digging in the urban area, there are a lot of dislocations to be disadvantage for safety of digging ants. The displacement of the pondside didn't converged with the phase of the excavation. Also, the speed of displacement got higher than the percentages of risk in the construction. So, we put into operation Face mapping for checking special quality of dislocations which appear on the digging ants. This results were used to decide a destruction in the case of the final excavation by analyzing with other results. It was possible to know the unstable distribution of a fault line in Face Mapping and to get powerful lens of a surface of discontinuity by tests indoors and outdoors. The results were also used to make a solution. Therefore, It's a successful example using the Partial TopDown for stable digging. And it is important that Face Mapping have to be practiced for solving the uncertainty of ground organization when digging design in the urban city.

  • PDF

Major causes of failure and recent measurements of tunnel construction (터널시공 중 붕락발생 원인과 최신 보강기술)

  • Park, Bong-Ki;Hwang, Je-Don;Park, Chi-Myeon;Kim, Sang-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.140-153
    • /
    • 2005
  • During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented

  • PDF

A Study on Fault Characteristics of Wind Power in Distribution Feeders (풍력발전(DFIG)의 고압배전선로의 사고특성 해석에 관한 연구)

  • Kim, So-Hee;Kim, Byung-Ki;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.3
    • /
    • pp.1288-1295
    • /
    • 2012
  • Korea Ministry of Knowledge Economy has estimated that wind power (WP) will be occupied 37% in 2020 and 42% in 2030 of the new energy sources, and also green energies such as photovoltaic (PV) and WP are expected to be interconnected with the distribution system because of Renewable Portfolio Standard (RPS) starting from 2012. However, when a large scale wind power plant (over 3[MW]) is connected to the traditional distribution system, protective devices (mainly OCR and OCGR of re-closer) will be occurred mal-function problems due to changed fault currents it be caused by Wye-grounded/Delta winding of interconnection transformer and %impedance of WP's turbine. Therefore, when Double-Fed Induction Generator (DFIG) of typical WP's Generator is connected into distribution system, this paper deals with analysis three-phase short, line to line short and a single line ground faults current by using the symmetrical components of fault analysis and PSCAD/EMTDC modeling.

A Technique for Fast Sampling Measurement of Digital Frequency Relay (디지털주파수계전기의 고속 샘플링추정기법)

  • Nam, S.B.;Lee, H.G.;Ma, S.B.;Kim, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2006.10b
    • /
    • pp.185-190
    • /
    • 2006
  • Frequency and phasor are the most important quantities in power system operation because they can reflect the whole power system situation. Frequency reflects the dynamic energy balance between load and generating power, while operators use phasor to constitute the state of system and, moreover, phasor based line relays are currently used in most power systems. So frequency and phasor are regarded as indices for the operating power systems in practice. The proposed technique is suitable for estimation near-nominal, nomina), and off-nominal frequencies. It is useful in designing microprocessor-based relays and meters that need to measure power system frequency. Performance test results, using signals from EMTP source and Excel program, indicate that the proposed technique can provide accurate estimates within 16ms. Maximum estimation errors observed during testing are of the order of 0.006Hz for nominal, near-nominal, and off-nominal frequencies. The proposed technique provides accurate estimates in presence of noise and harmonics and in case ground fault. The rate change of the phase angle is used for estimation. To confirm the validity of the proposed algorithm, the simulation studies carried out on a typical 154[KV] double T/L system by using EMTP software. Some test results are presented in the paper.

  • PDF

Development and Safety Evaluation of Earth Leakage Alarm Breaker Equipped with Fire Current (IGR) Alarming Function (화재전류(IGR) 경보 기능이 내장된 누전경보차단기의 개발 및 안전성 평가에 관한 연구)

  • Ko, Wan-Su;Choi, Chung-Seog
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.43-48
    • /
    • 2020
  • The purpose of this study is to develop an earth leakage alarm circuit breaker, equipped with a leakage alarming function (JER-E2S, ETECKOREA Co., Korea), and to analyze its characteristics. The developed mechanism is exclusively used for single-phase and 220 V circuits, with a rated current of 32 A, 20 A, 20 A (for restrooms), 16 A, etc. It satisfies all characteristics of existing earth leakage circuit breakers (ELB). If a fire current, which is a resistive leakage current (Igr), flows through an electric line, the device detects the leakage current in real time and warns against the leakage through a blinking LED lamp. Since the developed device displays a tolerance to a capacitative leakage current (Igc) that inevitably occurs in LED lamps, communication devices, etc., it ensures a stable power supply. In addition, the earth leakage alarm circuit breaker protects against power failure due to a momentary ground fault. Therefore, it can supply power without the risk of the circuit breaker malfunctioning due to a momentary ground fault caused by water droplets, leaves, etc. Moreover, with a standby power of less than 0.1 W, the developed earth leakage alarm circuit breaker exhibits a power saving performance that is 3~8 times greater than that of other ELBs. Installation of approximately 10 earth leakage alarm circuit breakers in one apartment household, with an area of 120 ㎡, can save 2~5 kWh per month. Therefore, the developed earth leakage alarm breaker not only satisfies the characteristics of existing earth leakage breakers, but also exhibits outstanding power supply quality since it has the functions of electric fire prevention and malfunction prevention. Therefore, this device can innovatively contribute to electric fire prevention.

Performance Improvement of the Wald Test for GPS RTK with the Assistance of INS

  • Abdel-Hafez, Mamoun F.;Kim, Dae-Je;Lee, Eun-Sung;Chun, Se-Bum;Lee, Young-Jae;Kang, Tae-Sam;Sung, Sang-Kyung
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.4
    • /
    • pp.534-543
    • /
    • 2008
  • To use the Global Positioning System (GPS) carrier phase measurement for precise positioning, the integer ambiguities at the early stage of most algorithms must be determined. Furthermore, if a precise positioning is to be applied to real time navigation, fast determination and validation methods for integer ambiguity are essential. In this paper, the Wald test that simultaneously determines and validates integer ambiguities is used with assistance of the Inertial Navigation System (INS) to improve its performance. As the Wald test proceeds, it assigns a higher probability to the candidate that is considered to be true at each time step. The INS information is added during the Wald test process. Large performance improvements were achieved in convergence time as well as in requiring fewer observable GPS satellites. To test the performance improvement of the Wald test with the INS information, experimental tests were conducted using a ground vehicle. The vehicle moved in a prescribed trajectory and observed seven GPS satellites. To verify the effect of the INS information on the Wald test, the convergence times were compared with cases that considered the INS information and cases that did not consider the INS information. The results show that the benefits of using the INS were emphasized as fewer GPS satellites were observable. The performance improvement obtained by the proposed algorithm was shown through the fast convergence to the true hypothesis when using the INS measurements.