• Title/Summary/Keyword: period of maintenance

Search Result 1,263, Processing Time 0.032 seconds

A Study on Loan Programs for Maintenance of apartment houses (공동주택의 유지관리 론 프로그램 구축방안)

  • Park, Sang-Hoon;Baek, Cheong-Hoon
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.171-179
    • /
    • 2010
  • Korea owns vast amount of apartment houses no less than those of world prominent countries, but did not pay enough efforts to maintain existing apartment houses and develop policies to reuse them due to growth driven policy of housing supply like construction of new houses. Korea constructed tremendous amount of houses in short period through government led forced house supplying policy, and resulted in excess houses such that present house supply rate happened to be reaching 110%. However, recently there are growing demand of change in housing policy due to social environmental changes like low birth rate and aging of society etc and nationals' demand for improvement of residential quality. When such social changes are demanded and 80% of apartment houses in Korea are less than 20 years old, renovations and remodeling of apartment houses are anticipated to emerge as important matter. In particular, the apartment houses in Seoul and the 1st generation new cities like Bundang and Ilsan etc have passed considerable period of time after construction and require safety measure, it is quite impending to loan programs for the maintenance of existing apartment houses. The objective of this study is to compare and analyze the system of loan programs about apartment houses of Japan, and then to propose to accelerate loan programs about maintenance for apartment houses in korea.

Two stage maintenance policy under non-renewing warranty (비재생보증 하에서의 이단계 보전정책)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.27 no.6
    • /
    • pp.1557-1564
    • /
    • 2016
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a two stage maintenance policy under the non-renewing warranty from the user's point of view in this paper. In the first stage, the user has to decide whether or not to purchase the extended warranty period. And, in the second stage, the optimal replacement period following the expiration of the warranty is determined. Under the extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. We utilize the expected cost from the user's perspective to determine the optimal two stage maintenance policy. Finally, a few numerical examples are given for illustrative purpose.

The construction classification of coastal castles in the early Joseon period and the background on their relocation (조선전기 남동부 연해읍성의 축조유형 구분과 이건배경)

  • Kwon, Soon-Kang;Lee, Ho-Yeol
    • Journal of architectural history
    • /
    • v.24 no.4
    • /
    • pp.29-44
    • /
    • 2015
  • Coastal eupseongs, which are mainly built in the period of late Goryeo and early Joseon period, are essential materials in studying the history of Joseon period eupseongs. The purpose of this study is to connect the annexation of local districts with the relocation of local government office, so as to categorize the types of coastal-eupseongs and examine the background of their constructions and relocations. Coastal eupseongs are mainly divided into 'maintenance type' and 'Mergence type' according to the annexation of local districts, and maintenance type is broken down into fortress type and non-fortress type in accordance with the existence of old eupseongs(fortresses). Coastal eupseongs can also be categorized into 'application type' and 'relocation type' depending on whether ex-local government offices were reutilized or relocated. Maintenance type is 'fortress-application type'(Gimhae Gosung Old Ulsan-eupseong), 'non-fortress-application type'(New Ulsan-eupseong), 'fortress-relocation type'(Dongrae Kijang Geojegohyunseong Ulsan(Jwabyeongyoung)-eupseong), 'non-fortress-relocation type'(Sacheon Hadong Jinhae-eupseong Geojesadeongseong) are differentiated by type. Mergence type is divided into 'Merger of Villages after Castle Relocation Type(Changwon Namhae Gonyang-eupseong)', 'Merger of Villages before Castle Relacation Type(Ungcheon-eupseong)'. Coastal-eupseongs are moved to other places in need of more affluent water supply(Gimhae Gijang-eupseong) and wider usable area(Namhae Gohyunseong-eupseong). Eupseongs were enlarged owing to the population growth, caused by annexations of local districts.(Ungcheon-eupseong) 'Seonso'(navy yard) is a unique feature which cannot be seen in inland eupseongs.

Maintenance Frequency Optimization of the Steam Turbine Journal Bearings by Condition-based Maintenance (상태기반정비에 의한 증기터빈 저널베어링의 정비주기 최적화)

  • Lee, Hyuk Soon;Chung, Hyuk Jin;Song, Woo Sok
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.2
    • /
    • pp.7-13
    • /
    • 2011
  • Turbine journal bearings are designed to support the weight of the rotors on a hydrodynamic oil film and to provide dynamic stability to the rotor system. The life time of journal bearings is infinite theoretically because the journal bearings are separated from the shaft journal by oil film. But poor design, assembly, operation and maintenance can cause problems to the journal bearings. The FMEA(Failure Mode and Effects Analysis) results of the journal bearings show that frequent maintenance of the journal bearings can cause failures and reduction of the bearing life. Therefore, the maintenance periods and history of the journal bearings with the bearing FMEA results are reviewed in order to establish the optimized maintenance period of the journal bearing for the nuclear power plants. Consequently it is necessary to maintain a best condition of lubrication system, reject time-based maintenance and perform the condition-based maintenance of journal bearings in order to maintain optimum condition of the journal bearing.

A Study on the Daily Inspection of the Rolling-stocks (철도차량 일상검수 주기 및 방법에 관한 연구)

  • Yu, Yang-Ha;Lee, Nak-Young;Kim, Ho-Soon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1642-1649
    • /
    • 2010
  • At present, KORAIL is in the middle of renovating. All steps exert great effort at cost reduction and a profit improvement. Especially to improve maintenance method and inspection period at the rolling-stock division lots of research is under progress. Daily inspection of rolling stocks is to operate the rolling stock normally. Daily inspection items are driving control device, coupling device, brake system, water system and air conditioning system, electrical system etc. Half of the maintenance manpower are inputted at daily inspection. Strengthens the quality and optimize the proportion of daily inspection are urgent problem. Daily inspection period extension aim is as follows. KTX from 3,500km to 5,000km, passenger car from 1st to 3,500km, new style electric locomotive from 2nd to 5,000km, the diesel locomotive is 2,800km from 1,200km. In this paper, the optimal daily inspection period and methods are considered including expected problem and counter measures.

  • PDF

Profit-based Thermal Unit Maintenance Scheduling under Price Volatility by Reactive Tabu Search

  • Sugimoto Junjiro;Yokoyama Ryuichi
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.331-338
    • /
    • 2005
  • In this paper, an improved maintenance scheduling approach suitable for the competitive environment is proposed by taking account of profits and costs of generation companies and the formulated combinatorial optimization problem is solved by using Reactive Tabu search (RTS). In competitive power markets, electricity prices are determined by the balance between demand and supply through electric power exchanges or by bilateral contracts. Therefore, in decision makings, it is essential for system operation planners and market participants to take the volatility of electricity price into consideration. In the proposed maintenance scheduling approach, firstly, electricity prices over the targeted period are forecasted based on Artificial Neural Network (ANN) and also a newly proposed aggregated bidding curve. Secondary, the maintenance scheduling is formulated as a combinatorial optimization problem with a novel objective function by which the most profitable maintenance schedule would be attained. As an objective function, Opportunity Loss by Maintenance (OLM) is adopted to maximize the profit of generation companies (GENCOS). Thirdly, the combinatorial optimization maintenance scheduling problem is solved by using Reactive Tabu Search in the light of the objective functions and forecasted electricity prices. Finally, the proposed maintenance scheduling is applied to a practical test power system to verify the advantages and practicability of the proposed method.

Optimal Replacement Policy for a Repairable System with Combination Warranty (혼합보증이 있는 수리 가능한 시스템에 대한 최적의 교체정책)

  • 정기문
    • The Korean Journal of Applied Statistics
    • /
    • v.15 no.1
    • /
    • pp.107-117
    • /
    • 2002
  • In this paper we present the optimal replacement policies following the expiration of combination warranty. We consider two types of combination warranty policies: renewing warranty and non-renewing warranty. The criterion used to determine the optimal replacement period is the expected cost rate per unit time from the user'perspective. The optimal maintenance period following the expiration of combination warranty is obtained. Some numerical examples are presented for illustrative purpose.

A Study on the Factors Affecting the Period of Job Maintenance of Persons with Cerebral Palsy (뇌성마비인의 직업유지기간에 영향을 미치는 요인 연구)

  • Kim, Jae Ik;Park, Soon
    • 재활복지
    • /
    • v.22 no.1
    • /
    • pp.87-114
    • /
    • 2018
  • The purpose of this study is to identify through empirical analysis about factors affecting the period of job maintenance of workers with cerebral palsy. Based on this, workers with cerebral palsy are looking for ways to maintain their job continuously. For this purpose, this study identifies the general characteristics and verify the affect of demographic factors, disability-related factors, employment-related factors, and social environment factors on the job maintenance period of workers with cerebral palsy. For the analysis, frequency analysis, descriptivel analysis, T-test and One-way Anova was conducted for 233 persons with cerebral palsy. The results of the study, of 17 variables of the four factors affecting the job maintenance period, 15 variables obtained statistically significant results. First, the demographic variables were age, household income, marital status, and education level. Second, the disability-related variables were disability grade, disability cause, and communication ability. Third, the employment-related variables were wage, employment type, disability-related organizations and companies, job type, job training, and qualification. Fourth, the social environment variables were assistive technology devices, and labor support personnel services.

Seismic Isolation Effects According to Set up the Isolation Period in the Medium and Low-rise Framed Building (중.저층골조에서 면진주기 설정에 따른 면진효과)

  • Chun, Young-Soo;Hur, Moo-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.93-99
    • /
    • 2010
  • Seismic isolation offers an attractive approach for reducing seismic loads in the building and its components. This paper deals with the seismic isolation effects due to variation in period ratio between superstructure and isolation layer of the building. Seismic isolation effects of the moment-resisting frames with the various period ratio were studied by nonlinear time history analysis, and the guidelines on the stiffness ratio of the superstructure and isolation layer of the building for the effective seismic isolation follow from the results of this study. It is recommended that the isolation period should be greater than 2.5 times of that of the superstructure for the effective seismic isolation.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.