• Title/Summary/Keyword: performance

Search Result 139,495, Processing Time 0.094 seconds

Performance Management of Communication Networks for Computer Intergrated Manufacturing (컴퓨터 통합 생산을 위한 통신망의 성능 관리)

  • Lee, S.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.11 no.4
    • /
    • pp.126-137
    • /
    • 1994
  • Performance management of computer networks is intended to improve a given network performance in order for more efficient information exchange between subsystems of an integrated large-scale system. Importance of perfomance management is growing as many functions of the large- scale system depend on the quality of communication services provided by the network. The role of performance management is to manipulate the adjustable protocol parameters on line so that the network can adapt itself to a dynamic environment. This can be divided into two subtasks : performance evaluation to find how changes in protocol parameters affect the network performance and decision making to determine the magnitude and direction of parameter adjustment. This paper is the first part of the two papers focusing on conceptual design, development, and evaluation of performance management for token bus networks. This paper specifically deals with the task of performance evaluation which utilizes the principle of perturbation analysis of discrete event dynamic systems. The developed algorithm can estimate the network performance under a perturbed protocol parameter setting from observations of the network operations under a nominal parameter setting.

  • PDF

Optimal In-Plane Configuration of 3-axis MEMS IMUs Considering Fault Detection and Isolation Performance and Lever Arm Effect (레버암 효과와 고장 감지 및 배제 성능을 고려한 여분의 3축 MEMS IMU의 평면 배치 기법)

  • Kim, Eung Ju;Kim, Yong Hun;Choi, Min Jun;Song, Jin Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.12
    • /
    • pp.1648-1656
    • /
    • 2018
  • The configuration of redundant inertial sensors are very important when considering navigation performance and fault detection and isolation (FDI) performance. By constructing a redundant sensor system using multiple inertial sensors, it is possible to improve the navigation performance and fault detection and isolation performance, which are highly related to the sensor configuration and allocation. In order to deploy multiple MEMS inertial measurement units effectively, a configuration and allocation methods considering navigation performance, fault detection and isolation performance, and lever arm effect in one plane are presented, and the performance is analyzed through simulation in this research. From the results, it is confirmed that the proposed configuration and allocation method can improve navigation, FDI, and lever arm effect rejection performances more effectively by more than 70%.

A Study on the Bending and Seismic Performance of High Performance Cold Forming Composite Beam

  • Choi, Young Han;Kim, Sung Bae;Hong, Hyung Ju;Kim, Sang Seup
    • International journal of steel structures
    • /
    • v.18 no.5
    • /
    • pp.1772-1783
    • /
    • 2018
  • Nowadays, the researches about composite structure system are being implemented in various fields, and many steel structures are designed based on that. In this study, the bending and seismic performance of the newly developed high-performance cold forming composite beam are evaluated by several experiments. As a result of the bending performance test, the bending moment of beam was increased stably depending on the depth and plate thickness of beam, and it is considered that the bending moment can be evaluated by the equation of a composite beam design. As a result of the seismic performance test, it was verified that sufficient seismic performance was obtained despite the increase of a negative moment rebar and depth of beam. In addition, the nominal bending moment has obtained the strength above the plastic bending moment, and also the plastic rotation angle has satisfied the requirement of composite intermediate moment frame.

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Study on the Factors of SCM Integration Level Influencing SCM and Management Performance : Focused on the Small-Medium Size Enterprises (중소기업의 공급사슬망 통합수준이 SCM 성과 및 경영성과에 미치는 영향에 관한 연구)

  • Sung, Ho-Kyung;Lee, Minho;Boo, Jeman
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.167-178
    • /
    • 2020
  • The purpose of this study is to examine the relationship between internal corporate, supplier, and customer integrations for domestic SMEs on non-financial and financial performance through SCM performance such as flexibility and reduction of uncertainties. To this end, data was collected on 286 SMEs in Korea, and the structural relationships between SCM integration level, SCM performances, and management performance were analyzed. As a result of the analysis, first, it was found that the SCM integration level had a significant positive effect on the flexibility and reduction of uncertainties, which are SCM performances. Second, the flexibility and reduction of uncertainties showed significantly positive effects on the non-financial performance of the companies, but did not directly affect the financial performance positively. Third, the non-financial performance was found to have a positive effect on the financial performance. In addition, the SCM integration level did not have a direct effect on the financial and non-financial performance, but it was found that it affected management performance by mediating the flexibility and reduction of uncertainties, which are SCM performances. That is, although the SCM integration level did not directly affect financial and non-financial performance, it was confirmed that it affects management performance by mediating SCM performances, flexibility and uncertainty reduction. In other words, it was confirmed that the SCM integration level directly or indirectly affects SCM performances and overall management performance. These results imply the necessity to focus on competency in the supply chain management area according to the SCM performance expected by SMEs, and the step by step approaches to the expected effects. In a situation where prior SCM related studies have not been able to present SCM performances and management performance of SMEs that are relatively lacking in their capital and SCM construction capabilities, the findings of this study could suggest the importance of SCM integration from the perspective of SMEs. In addition, from the viewpoint of SMEs, this study suggested that a sequential approach for performance measurement is required (SCM performance → management performance) in relation to the performance factors to be established through SCM.

Work Stress and Nursing Performance of Clinical Nurses (임상간호사의 업무스트레스와 간호업무수행)

  • Kim, Jung-A
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.9 no.4
    • /
    • pp.515-527
    • /
    • 2003
  • Purpose: The purpose of this study was to examine the work stress and nursing performance of clinical nurses' and to identify relationship between work stress and nursing performance. Method: This descriptive study queried 316 clinical nurses, selected by convenient sampling from four hospitals. Demographic characteristics, work stress and Nursing performance were measured. Descriptive statistics, t-test, ANOVA were performed to identify relationship between work stress and nursing performance on SPSS WIN 10.0. Result: The study subjects reported that the younger they were, the higher work stress they experienced and the lower nursing performance they behaviored. Also, the longer they worked as a nurse, the lower work stress they experienced and the higher nursing performance they hehaviored. The nurses working at ICU experienced more work stress. The nurses working at pediatric ward reported higher nursing performance. The married nurses' nursing performance was higher than unmarried nurses'. There was significant negative correlation between work stress and nursing performance among nurses. Conclusion: These results suggest that the nurse who experience higher work stress couldn't perform optimistic leveled nursing performance. Strategic planning for nursing administer and avoidance of work stress were discussed.

  • PDF

A Study on Performance Assessment Methods by Using Fuzzy Membership Function and Fuzzy Reasoning

  • Je, Sung-kwan;Jang, Hye-Won;Shin, Bok-Suk;Kim, Cheol-Ki;Jaehyun Cho;Kim, Kwang-Baek
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.608-611
    • /
    • 2003
  • Performance assessment was introduced to improvement of self-directed learning and method of assessment for differenced learning as the seventh educational curriculum is enforced. Performance assessment is overcoming limitation about problem solving ability and higher thinking abilities assessment that is problem of a written examination and get into the spotlight by way for quality of class and school normalization. But performance assessment has problems about possibilities of assessment fault by appraisal, fairness, reliability, and validity of grading, ambiguity of grading standard, difficulty about objectivity security etc. This study proposes fuzzy performance assessment system to solve problem of the conventional performance assessment. This paper presented an objective and reliable performance assessment method through fuzzy reasoning, design fuzzy membership function and define fuzzy rule analyzing factor that influence in each sacred ground of performance assessment to account principle subject. Also, performance assessment item divides by formation estimation and subject estimation and designed membership function in proposed performance assessment method. Performance assessment result that is worked through fuzzy performance assessment system can pare down burden about appraisal's fault and provide fair and reliable assessment result through grading that have correct standard and consistency to students.

  • PDF

Self-confidence and Satisfaction in Father's Role Performance among Husbands of Primiparous (초산모 배우자의 아버지역할 수행에 대한 자신감과 만족도)

  • Sung, Mi-Hae;Joo, Kyung-Sook
    • Child Health Nursing Research
    • /
    • v.13 no.3
    • /
    • pp.291-298
    • /
    • 2007
  • Purpose: The father's role performance in this study was identified as the correlation between self-confidence and satisfaction with parenting role by husbands of primiparous. Methods: Participants were recruited at a professional obstetric and gynecologic hospital in Seoul. For use in this study, the tool by Lederman et al. was modified to incorporate father's self-confidence and satisfaction with role performance. Percentages, means, t-test, ANOVA and Pearson Correlation Coefficients were used to analyze the data with the SPSS WIN 11.0m program. Results: The mean score for self-confidence in father's role performance was 35.19 and satisfaction in father's role performance was 45.13. General characteristic significantly related to father's role performance were marriage satisfaction and type of delivery. Also marriage satisfaction and religion were related to satisfaction with role performance in this study. There was a positive correlation between degree of self-confidence and degree of satisfaction in father's role performance. Conclusions: The degree of satisfaction in father's role performance was positively related to self-confidence. So, nursing interventions to improve father's role performance may lead to improvement in father's self-confidence and satisfaction with role performance. Further research is needed to exam causality.

  • PDF