• 제목/요약/키워드: peak power

Search Result 2,628, Processing Time 0.045 seconds

Voltage-Mode CMOS Squarer/Multiplier Circuit

  • Bonchu, B.;Surakampontorn, W.
    • Proceedings of the IEEK Conference
    • /
    • 2002.07a
    • /
    • pp.646-649
    • /
    • 2002
  • In this paper, a low-voltage CMOS squarer and a four-quadrant analog multiplier are presented. It is based on a source-coupled pair and a scaled-floating voltage generator which are modified to work as a voltage squaring and a sum/difference circuits. The proposed squarer/multiplier have been simulated with HSPICE, where -3㏈ bandwidth of 10MHz is achieved. The power consumption is about 0.6㎽, from a ${\pm}$1.5V supply, and the total harmonic distortion is less than 0.7%, with a 1.2V peak-to-peak 1MHz input signal.

  • PDF

Annual Yearly Load Forecasting by Using Seasonal Load Characteristics With Considering Weekly Normalization (주단위 정규화를 통하여 계절별 부하특성을 고려한 연간 전력수요예측)

  • Cha, Jun-Min;Yoon, Kyoung-Ha;Ku, Bon-Hui
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.199-200
    • /
    • 2011
  • Load forecasting is very important for power system analysis and planning. This paper suggests yearly load forecasting of considering weekly normalization and seasonal load characteristics. Each weekly peak load is normalized and the average value is calculated. The new hourly peak load is seasonally collected. This method was used for yearly load forecasting. The results of the actual data and forecast data were calculated error rate by comparing.

  • PDF

Analysis and Experiment of Peak Current Controlled Buck LED Driver

  • Kim, Marn-Go;Jung, Young-Seok
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.68-69
    • /
    • 2011
  • Realistic amounts of time delay are found to have significant effects on the average output LED current and on the critical inductor value at the boundary between the two conduction modes. Especially, the time delay can provide an accurate LED current for the peak current controlled (PCC) buck converter with a wide input voltage. Experimental results are presented for the PCC buck LED driver with constant-frequency controller.

  • PDF

Binary Nonlinear Joint Transform Correlator with Sinusoidal Iterative Filter in Spectrum Domain

  • Jeong, Man-Ho
    • Journal of the Optical Society of Korea
    • /
    • v.14 no.4
    • /
    • pp.357-362
    • /
    • 2010
  • The joint transform correlator (JTC) has been the best known technique for pattern recognition and identification. This paper proposes a new technique of fringe adjustment by adopting a sinusoidal amplitude-modulated iterative filter convolved with an interference fringe pattern in the joint power spectrum (JPS) domain. The comparison of our new technique and other techniques is presented to show that the newly proposed technique can successfully improve both the correlation peaks and the peak signal-to-noise ratio (PSNR). Simulated results of enhanced interference fringes are also presented.

The effect of PDMS thickness on the output power of triboelectric energy harvester (마찰전기 에너지 수확소자의 출력에 대한 PDMS 두께의 영향)

  • Kim, Ki-Hong;Yun, Kwang-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1233-1234
    • /
    • 2015
  • 본 연구에서는 유전 물질인 Polydimethylsiloxane(PDMS)의 두께에 따른 마찰전기 에너지 수확소자의 출력 전압을 실험적으로 확인하였다. 동작 범위 5 mm, 주파수 5 Hz를 기준으로 접촉-분리 방식으로 소자를 측정하였으며 PDMS 두께가 $440{\mu}m$일 때 peak-to-peak 전압이 131.5 V가 측정되었다. 이는 측정 두께 중 가장 얇은 두께인 $115{\mu}m$의 출력 값인 8.47 V와 비교하여 약 15배 증가한 수치이다.

  • PDF

Analysis of Vibration Signal for Failure Diagnosis of Rotating Devices (회전체 고장진단을 위한 진동 신호의 분석)

  • 임환조;김성동;정선환;홍성욱;오길호;박종희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.04b
    • /
    • pp.301-307
    • /
    • 1995
  • A monitoring technique of spindle fairure should be investirated prior to researcs of fairure diagnosis. This work is about monitoring of unbalanced shaft and defected bearings. The major work is done via experiments and the vibration signal is analysed means of power spectrum technique, and root mean squqre, peak-to-peak. Relationship is quantitatively investigated between defects and these monitoring paramenters.

  • PDF

An New Load Allocation Algorithms of Direct Load Control (직접부하제어 시스템의 새로운 부하 배분 알고리즘)

  • Kim, Jeong-Uk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.407-410
    • /
    • 2010
  • This paper presents an advanced load allocation algorithm in Direct Load Control(DLC) system. It is important to aggregate a various demand side resource which is surely controllable at the peak power time for a successful DLC system. Previous load allocation algorithm appropriate for DLC system is based on interchanged information, but, this algorithm can not derive optimal solutions. In this paper, we develop the optimal algorithm and the new load allocation algorithm in polynomial time. The simulation results show that the proposed heuristic algorithm for DLC system is very effective.

Performance Comparison of Common-Mode Voltage Reduction Methods in terms of Modulation Index (변조지수에 따른 공통모드 전압 저감 기법 성능 비교)

  • Heo, Geon;Park, Yongsoon
    • Proceedings of the KIPE Conference
    • /
    • 2020.08a
    • /
    • pp.106-108
    • /
    • 2020
  • This paper introduces a new pulse-width modulation (PWM) method to reduce common-mode voltages (CMVs) and compare its performance with other reduced CMV-PWM (RCMV-PWM) methods. To avoid the use of zero-vectors which cause high CMV peaks, the introduced method splits every reference vector into two vectors such that the peak-to-peak magnitude of CMV is reduced by one-third of conventional space-vector PWM (SVPWM). The performance of RCMV-PWMs altered by the modulation index are analyzed with simulation results.

  • PDF

A Study on Smart Peak Power Control System (스마트 최대 전력 관리 시스템 알고리듬 연구)

  • Lee, Woo cheol
    • Proceedings of the KIPE Conference
    • /
    • 2013.11a
    • /
    • pp.227-228
    • /
    • 2013
  • The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. So this system could control load more efficient and stable. Also the conventional load control circuit is not needed. Therefore, it is possible to improve the simple system configuration, which is resulted in cost effective and time saving. So this system is anticipated on time and coast.

  • PDF