• Title/Summary/Keyword: payback time

Search Result 38, Processing Time 0.022 seconds

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Automation Development in Water and Wastewater Systems

  • Olsson, Gustaf
    • Environmental Engineering Research
    • /
    • v.12 no.5
    • /
    • pp.197-200
    • /
    • 2007
  • Advanced control is getting increasingly demanded in water and wastewater treatment systems. Various case studies have shown significant savings in operating costs, including energy costs, and remarkably short payback times. It has been demonstrated that instrumentation, control and automation (ICA) may increase the capacity of biological nutrient removing wastewater treatment plants by 10-30% today. With further understanding and exploitation of the mechanisms involved in biological nutrient removal the improvements due to ICA may reach another 20-50% of the total system investments within the next 10-20 years. Disturbances are the reason for control of any system. In a wastewater treatment system they are mostly related to the load variations, but many disturbances are created also within the plant. In water supply systems some of the major disturbances are related the customer demand as well as to leakages or bursts in the pipelines or the distribution networks. Hardly any system operates in steady state but is more or less in a transient state all the time. Water and energy are closely related. The role of energy in water and wastewater operations is discussed. With increasing energy costs and the threatening climate changes this issue will grow in importance.

The Study on Economic Evaluation for Investment Cost When the Distribution Automation System is Applied (배전자동화 투자비대 경제적 효과분석에 관한 연구)

  • 하복남;한용희;한병성;이흥호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.7
    • /
    • pp.407-413
    • /
    • 2003
  • Before expanding of distribution automation application to distribution network, we must examine whether there are economical effect. Investment expense for distribution automation can be divided into facility investment expense, maintenance expense, communication expense, investment expense etc. Effect of distribution automation can classify by effect that can convert into money and effect that can not convert into money. Representative effect is outage time decrease effect, distribution line loss decrease effect, main transformer upload effect, distribution line upload effect, work environment improvement effect of lineman and so on. This paper studied economical effect and break-even Point for investment expense by using data that acquire in KEPCO's distribution network.

On the Economics of Quality Improvement Activities

  • Won, You-Dong
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.4
    • /
    • pp.176-183
    • /
    • 2003
  • The concept of cost of quality has become important economic measures of quality issues for several decades. Most of the research to date has focused on the problem and solution under static business conditions. However, some researchers have found that prevention cost of COQ is one of the expenses of investment and the payback will be shown by the improvement of product quality. These approaches have considered cost of quality issues based on a time factor. It means that there is a trade­off between prevention/appraisal costs and failure costs. Based on a capital budgeting approach, this research reviews the economics of quality improvement activities and proposes the decision criteria to justify quality improvement activities.

An Application Study on the Actual Site for Using Waste Heat (폐열을 이용한 열공급 실증 연구)

  • 이덕기;박수억;이승진
    • Journal of Energy Engineering
    • /
    • v.10 no.4
    • /
    • pp.327-334
    • /
    • 2001
  • Heat is wasted by unconcern in industrial complex. This paper presented for using waste heat, which investigated step by step from searching waste heat to starting construction before and directly applied for the using waste heat in the actual site. Especially, using heat is assessed by investigation of heat supply and demand. Design of heat transportation system was made base on analysis of heat balance between demand and supply, which was analyzed by economical efficiency and property. Payback-period on investment was 1,909 years that was comparatively a short period of time in assessment.

  • PDF

Economic Evaluation of Early Detection System for Warranty Issues (품질보증 이슈 조기감지 시스템의 경제성 평가)

  • Jung, Sung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • An early detection system for warranty issues periodically collects customers' claim data and automatically reports alarms about emerging issues based on statistical algorithms. It helps companies to reduce an issue definition time and save the handling cost of warranty claims. This paper provides an evaluation framework to validate the economic effect of an early detection system project. For this purpose, we present economical index of a project with explicit formulas such as ROI(return on investment), PP(payback period), NPV(net present value), PI(profitability index) and IRR(internal rate of return) and analyze the sensitivities of the index according to the variation of project input parameters. The proposed analysis framework is expected to be used for evaluating economic values of various system integration projects.

A Case Study on the Installation and Operation of the Standing Column Well Method (우물관정형(SCW공법) 지열히트펌프 시스템의 설치 및 운영사례)

  • Na, Sang-Min;Park, Si-Sam;Park, Jong-Hun;Rhee, Keon-Joong;Kim, Tae-Won
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.592-595
    • /
    • 2009
  • In recent years, geothermal heat pump (GHP) systems have become increasingly popular for heating and cooling in buildings. The Standing Column Well (SCW) method is one of the most efficient GHP system. Because it use groundwater for heat transfer material. In SCW systems, water is re-circulated between the well and the building (heat pump). It is only a short time since this method has been applied in domestic. So we have to refer to the developed countries' guides and manuals of SCW. In this paper, several design and construction points of SCW method are filed. We used real operation data of SCW system at Chong-Ju Univ. site for economical efficiency analysis. As a result, the payback period of Chong-Ju Univ. site is calculated at 7.23 years.

  • PDF

A Study on the Development Directions for Upbringing Young Success Farmers (농업인후계자 육성사업의 개선방안에 관한 연구)

  • Yand, Seung-Choon;Kim, Jin-Hwa;Choi, Chang-Wook
    • Journal of Agricultural Extension & Community Development
    • /
    • v.5 no.2
    • /
    • pp.133-142
    • /
    • 1998
  • The purpose of this study was to investigate development derections for upbringing young success farmers. The study was carried out through literature review and questionnarie survey. Total of 400 young success farmers were surveyed to collect data, and 394 responded. For deveolpment directions of upbringing young success farmers, this study suggests; 1) to increase investment of agricultural management and marketing, 2) to postpone the time to payback and to lower the loan rates, 3) to enlarge consulting service in agricultural extension organizations.

  • PDF

Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose (농업용 보를 이용한 소수력발전소의 타당성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

Energy and Cost Efficiency on applying Solar Control Facade System (일사조절 장치 적용에 따른 에너지 및 비용효과 분석)

  • Ahn, Ki-Uhn;Kim, Seong-Jin;Kim, Dong-Hee;Moon, HyunSeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.98-99
    • /
    • 2013
  • Recently, solar control facade systems are highlighted due to its low cost and outstanding applicability for green remodeling. However, it has not been long time since the systems were introduced. Therefore, the application study of the solar control system also has been insufficient. In this study, simulated models were developed and three types of solar control systems(i.e., overhang, blind, and screen)are installed in the models. The efficiency of energy savings and investment payback period according to the application of solar control facade system were analyzed.

  • PDF