• Title/Summary/Keyword: pavement repair

Search Result 73, Processing Time 0.027 seconds

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.

Evaluation of a Traffic Lane Closure and Pavement Repair for a Certain Period (Focusing on the Gimcheon~Sunsan Project) (1차로 전면차단 후 도로포장 보수방법의 효과분석 (김천~선산 사례중심))

  • Ryu, Sung Woo;Park, Kwon-Je;Han, SeungHwan;Choi, InGu;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.11-19
    • /
    • 2016
  • PURPOSES : This study supports the evidence that it is possible to rehabilitate a damaged pavement with a lane closure specifically based on the Gimcheon~Sunsan project. METHODS : The prediction results from the simulation programs were compared with field monitoring, which focused on traffic management planning, congestion (length, time, and passing speed), bypass, and user cost, among others. RESULTS : The research results showed that lane closure application and pavement repair of the aged pavement in Korea were possible, even though the prediction results were minimally different from the field monitoring. The road agency contributes to service life extension of the rehabilitated pavement using this method. CONCLUSIONS : A marginal effect caused by the lane closure was observed on travelling users or vehicles, and the user cost of pavement repair decreased. Therefore, introducing the repair method or rehabilitation in Korea is possible. Information dissemination through various media was properly done to execute the project well. Moreover, the construction area traffic utilized nearby alternative roads. Therefore, improving the repaired pavemen's service life while ensuring that the pavement management agency can provide a road with comfortable user riding quality was possible.

Experimental study on the Development of Thin-layer Pavement Method using Hybrid Epoxy for Concrete Bridge Deck Crack Repair (콘크리트 교면포장 균열 보수를 위한 하이브리드 에폭시 박층포장 보수공법 개발에 관한 실험적)

  • Kim, Han-Sol;Jang, Jong-Min;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.79-80
    • /
    • 2022
  • A method for repairing cracks using low-viscosity resins has been proposed as a construction method that can quickly repair roads from deterioration. However, when the viscosity of the epoxy resin is high, there is a limit in that it is difficult for the material to penetrate into microcracks and cracks in the concrete top plate. In this study, an epoxy thin-layer pavement repair method was developed using low-viscosity PMMA (Poly methyl methacrylate) to repair microcracks on the pavement surface and pavement layer and reinforce the pavement surface. Materials necessary for the thin-layer packaging method were developed, and performance was evaluated to meet the epoxy binder quality standards. As a result, all materials met the required performance.

  • PDF

Re-Repair Method for Deterioration of Partial Depth Repair Section in Portland Cement Concrete Pavement (콘크리트 포장 부분단면보수 재파손 구간의 적정 보수 방안)

  • Lee, Yong Hyeon;Kim, Hyun Seok;Jung, Won Kyong;Oh, Han Jin;Kim, Hyung Bae
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.33-42
    • /
    • 2017
  • PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS : The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex (단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구)

  • Jung, Jong-Suk;Park, Yong-Boo;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.297-303
    • /
    • 2014
  • Recently, block and permeable pavements have been placed in apartment complex. However. it is hard to decide the cycle of maintenance and repair due to lack of performance evaluation criteria for these pavements. This study carried out life cycle cost analysis(LCCA) to present resonable alternatives of the pavements by considering initial construction cost, maintenance and repair cost along with the cycle of repair. According to results of LCCA, the interlocking concrete block pavement is the best alternative when the repair cycle of 20years is assumed, while asphalt concrete pavement is the best alterative when the repair cycle of 10years is assumed. Therefore, the repair cycle is most important factor to select alternative. Also, it is necessary to develop resonable performance evaluation index to quantify the cycle of maintenance and repair in the future.

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Experimental Study on Performance of MgO-based Patching Materials for Rapid Repair of Concrete Pavement (콘크리트 포장의 급속 보수를 위한 산화마그네슘계열 단면복구재의 성능에 대한 실험적 연구)

  • Lee, Hyeongi;Ann, Kiyong;Sim, Jongsung
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.43-55
    • /
    • 2016
  • PURPOSES : This study aims to develop a repair material that can enhance pavement performance, inducing rapid traffic opening through early strength development and fast setting time by utilizing MgO-based patching materials for repairing road pavements. METHODS : To consider the applicability of MgO-based patching materials for repairing domestic road pavements, first, strength development and setting time of the materials were evaluated, based on MgO to $KH_2PO_4$ ratio, water to binder ratio, and addition ratio of retarder (Borax), by which the optimal mixture ratio of the developed material was obtained. To validate the performance of the developed material as a repair material, the strength(compressive strength and bonding strength) and durability (freezing, thawing, and chloride ion penetration resistance) was checked through testing, and its applicability was evaluated. RESULTS : The results showed that when an MgO-based patching material was used, the condensation time was reduced by 80%, and the compressive strength was enhanced by approximately 300%, as compared to existing cement-based repair materials. In addition, it was observed that the strength (compressive strength and bonding strength) and durability (freezing and thawing, and chloride ion penetration resistance) showed an excellent performance that satisfied the regulations. CONCLUSIONS : The results imply that an emergent repair/restoration could be covered by a rapid-hardening cement to meet the traffic limitation (i.e. the traffic restriction is only several hours for repair treatment). Furthermore, MgO-based patching materials can improve bonding strength and durability compared to existing repair materials.

Evaluation on Patching Materials for Asphalt Pavement (아스팔트 포장도로의 응급보수재료 평가에 관한 연구)

  • Shim, Jae-Pill;Jin, Jung-Hoon;Park, Tea-Soon;Lee, Jae-Sik
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.59-67
    • /
    • 2012
  • This study presents the evaluation of the patching materials that are used to repair the distress of asphalt pavement. Four kinds of patching materials currently used in practice were tested in both laboratory and field. The laboratory tests included the dry and soaked Marshall stability test, indirect tensile test, wheel tracking test and adhesive strength between the asphalt pavement and the repairing material was tested as a performance test. The field study was conducted using the slab samples placed on the location of vehicle tire passing and the performance of the repairing materials were investigated as passing the traffic load. The result of the laboratory tests were satisfied with the current design criteria and material standard except for water-immersion stability. Type C patching material showed the highest adhesive shear strength among the patching materials tested. However, the mature distress, such as rutting and stripping were monitored after construction in 10 days. It was found that performance of patching material is lack of quality behavior when they were applied in the field and required to develop and applu to prevent the mature distress of the current patching materials.

A Study on Field Application of Preventive Maintenance Method for Flexible Pavements (연성포장의 예방적 유지보수공법에 대한 현장 적용성 연구)

  • Kim, Nakseok;Jin, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.565-569
    • /
    • 2011
  • This paper presents minimum area repair method that is one of the preventive maintenance techniques in asphalt concrete pavements. In this method, a 70cm-width as an effective repair zone was suggested considering the conventional longitudinal damages (rutting and fatigue cracking) in early stages. In addition, the repair zone can be readjusted according to the pavement damage levels. A field test bed was constructed to verify the adaptness for the repair method. Test results revealed that the minimum area repair method can be adopted as a preventive maintenance technique in flexible pavements to recover an appropriate serviceability level. The preventive maintenance method may be one of the major maintenance methods of flexible pavements with an appropriate application. It is also noted that the method may be a long term maintenance cost effective and pavement life ensuring one.