• Title/Summary/Keyword: pavement management system

Search Result 136, Processing Time 0.023 seconds

Methodology of a Probabilistic Pavement Performance Prediction Model Based on the Markov Process (확률적 포장 공용성 예측모델 개발 방법론)

  • Yoo, Pyeong-Jun;Lee, Dong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.4 no.4 s.14
    • /
    • pp.1-12
    • /
    • 2002
  • Pavement Management System has a special purpose that the rehabilitation strategy applied on pavement should be executable in view of technical and economical point after new pavement open to the traffic. To achieve that purpose, a reliable pavement performance prediction model should be embeded in the system. The object of this study is to develop a probabilistic pavement performance prediction model for evaluating asphalt pavements based on the Markov chain concept. In this paper, methodology of the Markov chain modeling principle is explained, and the application of this model to asphalt pavement is described. As the results, transition matrics for predicting asphalt pavement performance are obtained, and also performance life is estimated quantitatively by this system.

  • PDF

Development of Rehabilitation Criteria of National Highway Pavement (국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구)

  • Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.37-44
    • /
    • 2009
  • Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.

  • PDF

Estimation of Tire-Pavement Noise for Concrete Pavement by using Mean Profile Depth (Mean Profile Depth를 이용한 콘크리트 포장의 타이어-노면소음 산정)

  • Hong, Seong Jae;Hyun, Tak Jib;Lee, Seung Woo;Kim, Hyung Bae;Kwon, Oh Sun
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.9-16
    • /
    • 2013
  • PURPOSES: There is a need to develop a method to incorporate tire-pavement noise in the pavement management system. Tire-pavement noise highly depends on the characteristics of pavement texture. Therefore, estimation of texture characteristics may give useful information to predict tire-pavement noise. This study aimed to find the relationship between tire-pavement noise and MPD(Mean Profile Depth) for concrete pavement. METHODS: MPD and tire-pavement noise were collected on the number of expressway sections including Central Inland Test Road in Korea. Statistical analysis was performed to find the correlationship between MPD and tire-pavement noise. In addition, multiple regression analysis to find the tire-pavement noise based on MPD and type of concrete pavement texture. RESULTS: Linear relationship between MPD and tire-pavement noise is observed for concrete pavement. Furthermore, a forensic equation to estimate tire-pavement noise based on MPD and texture types of concrete pavement is suggested. CONCLUSIONS: Tire-pavement noise on concrete pavement can be predicted based on the consideration of texture type and MPD estimation.

Estimation of a Level of Service and Cost of Service Function for Road Pavements for Performance Management in the Public Sector (공공부문 성과관리를 위한 도로포장의 서비스수준과 서비스비용 함수 추정)

  • HAN, Daeseok;LEE, Suhyung;LEE, Sang Hyuk;YOO, In-kyoon
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.9-18
    • /
    • 2016
  • PURPOSES : This study aimed to evaluate the performance of pavement management works and to develop a function for estimating the level of service (LOS) and cost of service (COS) for the systematic and quantitative management of pavement performance in the public sector. METHODS : The International Roughness Index (IRI) was used as the performance index for pavement management. Long-term pavement performance data for a period of 7 years (2007-2014) collected by the National Highway Pavement Management System and historical maintenance budget data published by the South Korean government were used to develop the LOS-COS function. Based on the function, a model for estimating the appropriate budget as well as the network conditions was suggested. RESULTS : There was high degree of correlation between pavement performance and the investment level (R = - 0.74). The developed LOS-COS function suggested that the unit cost to improve the network IRI to 1 m/km was 32.6 billion KRW. Further, the maintenance costs normalized with respect to the LOS levels were LOS-A = 88.2 billion KRW, LOS-B = 55.6 billion KRW, and LOS-C = 23.0 billion KRW. CONCLUSIONS : This study proposes a simple way of developing a LOS-COS function. It also shows how to develop a network budget demand and condition estimation model using the LOS-COS function. In addition, it is the first attempt to evaluate the road maintenance budget in South Korea. It is expected that these results will help in the negotiations between the road managers and budget makers.

The Extration of Road-Surface Information using Digital photogrammetry (수치사진측량기법을 이용한 도로노면정보 추출)

  • 이종출;차성렬;김대현;김진수
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.227-232
    • /
    • 2004
  • In this study, we extracted road surface information which are required highway pavement management system from the obtained digital imagery and these digital image data were analyzed. Thus, this paper says the higyway surface management system and information of surface conditions which are required to management of highway pavement

  • PDF

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Fractal evaluation of the level of alligator cracking in pavements

  • Vallejo, Luis E.
    • Geomechanics and Engineering
    • /
    • v.4 no.3
    • /
    • pp.219-227
    • /
    • 2012
  • Pavement management systems require systematic monitoring of pavement surfaces to determine preventive and corrective maintenance. The process involves the accumulation of large amounts of visual data, typically obtained from site visitation. The pavement surface condition is then correlated to a pavement distress index that is based on a scoring system previously established by state or federal agencies. The scoring system determines if the pavement section requires maintenance, overlay or reconstruction. One of the surface distresses forming part of the overall pavement distress index is the Alligator Crack Index (AC Index). The AC Index involves the visual evaluation of the crack severity of a section of a pavement as being low, medium, or high. This evaluation is then integrated into a formula in order to obtain the AC Index. In this study a quantification of the visual evaluation of the severity of alligator cracking is carried out using photographs and the fractal dimension concept from fractal theory. Pavements with low levels of cracking were found to have a fractal dimension equal to 1.051. Pavements with moderate levels of cracking had a fractal dimension equal to 1.1754. Pavements with high degrees of cracking had a fractal dimension that varied between 1.5037 (high) and 1.7111 (very high). Pavements with a level of cracking equal to 1.8976 represented pavements that disintegrated and developed potholes. Thus, the visual evaluation of the state of cracking of a pavement (the AC Index) could be enhanced with the use of the fractal dimension concept from fractal theory.

A Study on Decision Criteria of traffic volumes for Choosing of Modified Asphalt Pavement in Korea National Highway (국도 아스팔트포장의 특수포장 적용을 위한 교통량 기준 제안 연구)

  • Kwon, Soo-Ahn;Jeong, Kyoung-Young;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.4 no.3 s.13
    • /
    • pp.25-33
    • /
    • 2002
  • Most national highways are paved with asphalt. Since increased traffic volume and high temperature have reduced the service life of pavements, modified asphalt pavements or stone mastic asphalt (SMA) have gradually been adopted. However, pavement engineers have difficulty to select pavement types due to lack of standard specifications for these new pavement types. In this study, service lives of general asphalt pavements based on traffic volume were analyzed using the inventory data of pavement management system (PMS) collected for last 10 years. The results showed 9.5 and 5.6 year average service lives for new constructed pavements and overlays, respectively. The traffic volumes for the design life of 10 years was presented based on confidence levels using service life distributions of current pavements. For the confidence level of 90%, 2,300 ESAL was obtained; 1,500 ESAL for the confidence level of 80%. This indicates that modified asphalt pavements should be considered for sections with the higher traffic volume.

  • PDF

Development of Pavement Condition Index for the Municipal Pavements (시단위 포장도로의 포장평가지수개발)

  • Moon, Hyung-Chul;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.221-230
    • /
    • 2008
  • In Korea, Expressway and National Highway System has been continually managed by their own pavement management system. The pavement condition evaluation system has not been developed for the municipal roads except for Seoul city. Therefore, this study focuses on analyzing the characteristics of distress in major city's pavement and developing the pavement condition index for the municipal PMS. Panel rating and pavement condition survey for the selected pavement sections were conducted for developing pavement condition index. Municipal level pavement condition index(MPCI) was developed by statistical analysis. Also, a sensitivity analysis for each independent variable of the MPCI and comparison with other pavement condition indicies, such as SPI and HPCI, were performed.

  • PDF

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.