• Title/Summary/Keyword: pavement life

Search Result 240, Processing Time 0.023 seconds

Simple AC/CRC Composite Pavement Design Using MEPDG (MEPDG를 이용한 아스팔트/연속철근 콘크리트 복합포장 간편 설계)

  • Baek, Jongeun;Kim, Hyung Bae;Lee, Hyun Jong
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.1-8
    • /
    • 2014
  • PURPOSES : Analysis and design of asphalt concrete (AC) and continuously reinforced concrete (CRC) composite pavements. METHODS : In this study, the service life of the AC/CRC composite pavements was determined based on the probabilistic method in the mechanistic-empirical pavement design guide(MEPDG). Typical pavement design was provided with respect to heavy truck traffic volume of highways. RESULTS : The service life of the composite pavements based on IRI was shorter than that based on rutting at lower traffic volume, but this trend was switched at higher traffic volume. CONCLUSIONS : It is concluded that the main distress affecting the service life of the composite pavements was longitudinal roughness and rutting. Roughness became lower, but rut depth became greater as the stiffness of the CRC increased.

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

A Study to Analyze Service Life of Expressway Pavement according to Traffic Volumes and De-icing Chemicals (교통량 및 제설제 사용량에 따른 고속도로 포장의 공용수명 분석)

  • Kim, Chan-Woo;An, Soo-Han;Park, Hee-Young;Lee, Jung-Hun;Jung, Chul-Ki
    • International Journal of Highway Engineering
    • /
    • v.17 no.1
    • /
    • pp.35-41
    • /
    • 2015
  • PURPOSES : The purpose of this study is to analyze the service life of expressway pavement based on both traffic volumes and use of deicing chemicals. METHODS : A database was built using expressway rehabilitation history information from over the last decade. In order to estimate the service life of expressway pavement, various analysis methods were considered, and a decision was made to perform analysis using a method based on an accumulated rehabilitation ratio. The service life of expressway pavement was then analyzed by classifying the scale of traffic volume and extent of de-icing chemicals used. RESULTS : The service life of PMA and SMA ranged from 7.8 to 10.6 years and from 9.9 to 12.0 years, respectively. The service life of JCP ranged from 16.0 to 22.2 years, and the service life of CRCP was 33.5 years on average. Results of assessing service life according to traffic volumes and de-icing chemicals showed that the lower the traffic volumes were, the greater the service life of PMA and JCP, and the less that de-icing chemicals were applied, the greater the service life of JCP. CONCLUSIONS : The dependence of expressway pavement service life on traffic volumes and de-icing chemicals makes it possible to apply LCCA for regional maintenance plans and cost-effective selection of expressway pavement type.

Development of Seocho Borough Pavement Condition Evaluation Model based on Seoul Metropolitan SPI (서울시도 SPI를 활용한 서초구 도로포장상태 평가모형 개발)

  • Lee, Sang-Yum;Park, Mi-Youn;Kim, Kyoon-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.314-321
    • /
    • 2016
  • Adapting the maintenance criteria of Seoul City pavement is not applicable for borough pavement due to differences between the pavement of Seoul city and the borough, such as priority of maintenance, traffic volume, thickness of pavement, and pavement deterioration rate by distresses. To develop an efficient and reasonable evaluation method of the Seocho borough pavement condition within a limited budget, this study suggested the borough pavement condition evaluation model based on the PMS (Pavement Management System) of Seoul Metropolitan SPI (Seoul Pavement Index). The SPI was modified to predict the remaining life and determine the proper maintenance method for the pavement in Seocho borough. This was suggested to reflect the rate of the designed performance life and field performance life of pavement as well as the pavement condition at the stage of the completion of construction. Primary variables, such as crack, rutting and IRI in the final model affect the overall performance life due to their even composition. Therefore, the suggested model considering the lowered criteria, design performance factor, and construction factor can be used for the more efficient maintenance of Seocho borough pavement.

A Study on Life Cycle Cost Analysis of Latex Modified Concrete Pavement for Bridges (LMC 교면 포장 공법의 생애주기비용분석에 관한 연구)

  • Cho, Hyo-Nam;Choi, Hyun-Ho;Jung, Pyoung-Ki;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.185-195
    • /
    • 2001
  • Latex Modified Concrete(LMC) has been widely used for the pavement of highway bridges over the past 35years around the world since it is more resistant to the intrusion of chloride ions, has higher tensile, compressive, and flexural strength, and has greater freeze-thaw resistance. However, in Korea, it has not been introduced to fields due to higher initial construction cost for its overlay compared with that of conventional pavement materials. Due to durable characteristics, it should be noted that the LMC may be more cost-effective than conventional pavements such as asphalt pavement, when life-cycle cost(LCC) concept is considered. The objective of this study is intended to suggest a practical LCC analysis model for pavement projects and to demonstrate relative cost-effectiveness of the LMC overlays in comparison with conventional pavement techniques. It may be stated that the procedure proposed in this study may be utilized for making optimal decision on cost-effective pavement design.

  • PDF

Performance Evaluation of Long-Life Asphalt Concrete Overlays Based on Field Survey Monitoring in National Highways (일반국도 현장조사 모니터링을 통한 장수명 아스팔트 덧씌우기 포장의 공용성 분석)

  • Baek, Jongeun;Lim, Jae Kyu;Kwon, Soo Ahn;Kwon, Byung Yoon
    • International Journal of Highway Engineering
    • /
    • v.17 no.3
    • /
    • pp.69-76
    • /
    • 2015
  • PURPOSES : Performance evaluation of four types of asphalt concrete overlays for deteriorated national highways. METHODS : Pavement distress surveys for crack rate and rut depth have been conducted annually using an automated pavement survey vehicle since 2007. Linear and non-linear performance prediction models of the asphalt concrete overlays were developed for 43 sections. The service life of the asphalt overlays was defined as the number of years after which a crack rate of 30% or rut depth of 15mm is observed. RESULTS : The service life of the asphalt overlays was estimated as 17.4 years on an average. In 90.7% of the sections, the service life of the overlays was 15 years or more which is 1.5 times the life of conventional asphalt concrete overlays used in national highways. The performance of the overlays was dependent on the type of asphalt mixture, traffic volume levels, and environmental conditions. CONCLUSIONS : The usage of stone mastic asphalt (SMA) and polymer-modified asphalt (PMA) for the overlays provided good resistance to cracking and rutting development. It is recommended that appropriate asphalt concrete overlays must be applied depending on the type of existing pavement distress.

Estimation of Mean Life and Reliability of Highway Pavement Based on Reliability Theory (신뢰성 개념을 이용한 포장의 평균수명 및 신뢰도 예측)

  • Do, Myung-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.497-504
    • /
    • 2010
  • In this paper, the author presents a reliability estimation technique to analyze the effects of traffic loads on pavement mean life based on the national highway database of Suwon and Uijeongbu region from 1999 to 2008. The estimation of the mean life, its standard deviation and reliability for pavement sections are calculated by using an appropriate distribution, Lognormal distribution, based on reliability theory. Furthermore, the probability paper method and Maximum likelihood estimation are both used to estimate parameters. The author found that mean life of newly constructed sections and over-layed sections is about 6.5 to 7.9 years and 7.3 to 9.1 years, respectively. The author also ascertained that the results of cumulative failure probability for pavement life between the proposed methods and observed data are similar. Such an assessment methodology and measures based on reliability theory can provide useful information for maintenance plans in pavement management systems as long as additional life data on pavement sections are accumulated.

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Economic Analysis of Long-life Asphalt Pavements using KoPMS (한국형 포장관리시스템을 활용한 장수명 아스팔트 포장의 경제성 분석)

  • Do, Myungsik;Kwon, Sooahn;Baek, Jongeun;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.19-28
    • /
    • 2016
  • PURPOSES : Long-life asphalt pavements are used widely in developed countries. In order to be able to devise an effective maintenance strategy for such pavements, in this study, we evaluated the performance of the long-life asphalt pavements constructed along the national highways in South Korea. Further, an economic evaluation of the long-life asphalt pavements was performed based on a life-cycle cost analysis. We aimed to devise a model for evaluating the performance of long-life asphalt pavements using the national highway pavement management system (PMS) database as well as for analyzing the economic feasibility of such pavements, in order to promote their use in South Korea. METHODS : The maintenance history and pavement performance data were obtained from the national highway PMS database. The pavement performances for a total of 292 sections of 10 lanes (5 northbound lanes and 5 eastbound lanes) of national highways were used in this study. Models to predict the performances of hot mix asphalt (HMA) and long-life asphalt pavements under two distinct traffic conditions were developed using a simple regression method. Further, the economic feasibility of long-life asphalt pavements was evaluated using the Korea Pavement Management System (KoPMS). RESULTS : We developed service-life prediction models based on the traffic volume and the equivalent of single-axle load and found that long-life asphalt pavements have service lives 50% longer than those of HMA pavements. Further, the results of the economic analysis showed that long-life asphalt pavements are superior in terms of various economic indexes, including user cost, delay cost, total cost, and user benefits, even though their maintenance cost is higher than that of HMA pavements. A comparison of the economic feasibilities of the various groups showed that group A is superior to HMA pavements in all aspects except in terms of the maintenance criterion (crack 20% or higher) as per the NPV index. However, the long-life asphalt pavements in group B were superior in terms of the maintenance criterion (crack 25% or higher) regardless of the economic feasibility. CONCLUSIONS : The service life of long-life asphalt pavements was found to be approximately 50% longer than that of HMA pavements, regardless of the traffic volume characteristics. The economic feasibility of long-life asphalt pavements was evaluated based on the KoPMS. The results of the economic analysis were the following: long-life asphalt pavements are exceptional in terms of almost all factors, such as user cost, delay cost, total cost, and user benefit; however, the exception is the maintenance cost. Further, the economic feasibility of the long-life asphalt pavements in group B was found to be better than that of the HMA pavements (crack 25% or higher).

A Study on Economic Feasibility of Highway Maintenance Considering Carbon Amount by Using KPRP (Korea Pavement Research Program) (탄소량을 고려한 도로 유지보수 경제성에 관한 연구: KPRP (Korea Pavement Research Program) 활용)

  • Nguyen, Dinh Thanh;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.879-890
    • /
    • 2017
  • The US Pavement Design method (AASHTO) and HDM-4, a road pavement maintenance decision system, are not suitable for domestic pavement design, construction and maintenance. KPRP(Korea Pavement Research Program) has been developed to reflect Korea's environmental conditions and vehicle characteristics, thereby, extending pavement life. The main objective of this study is to select the best alternative through Life Cycle Cost $CO_2$ (LCCC) calculations among three representative maintenance strategies using KPRP design software since the environment cost resulting from the extended pavement life will also differ. The analysis of this study illustrates that cumulative carbon emissions for 40 years in alternative 2 (Cutting and Overlaying at Year 30) is the lowest option among them, and the basic cost of $CO_2$ emission by various road maintenance and repair work can be used for suggesting an optimal maintenance strategy for highway agency.