• Title/Summary/Keyword: overseas power plant

Search Result 72, Processing Time 0.024 seconds

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

A Fundamental Study on the Comparison and Analysis of Overseas Design Orders of Korea, China and Japan (한중일 해외설계수주액의 비교·분석 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.195-196
    • /
    • 2019
  • The purpose of this study is to analyze the scale of overseas design orders in Korea, China and Japan by region and type of work, and to draw implications. As a result of analyzing the overseas design sales market of Korea, China and Japan, all three countries have the highest percentage of overseas sales in the Asian market, and the overseas design sales are the highest in power generation, chemical plant and transportation sectors. In addition to the Middle East and Asian markets, Japan and China have also diversified their strategies to diversify their markets by taking orders in various regions such as Europe, Africa and the United States. In particular, China is promoting the "New Silk Road Project" (One belt, One road), linking land and sea to a total of 25 countries and actively supporting aid projects in Africa and Asia, have. In addition, Japan has been actively supporting the government's expansion of ODA projects to expand overseas market entry. Therefore, it is necessary for Korea to increase its market share through diversification of overseas design market and diversification of industrial type, and to participate in overseas design market by expanding customized R&D investment.

  • PDF

Economic Feasibility Comparison of Overseas Green Ammonia Project Using Renewable Energy (신재생 에너지를 이용한 해외 그린 암모니아 프로젝트에 대한 경제성 비교)

  • Hyun-Chang Shin;Hak-Soo Mok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.3
    • /
    • pp.547-553
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'Net Zero'. Due to limitations in domestic green hydrogen production, Korean companies are interested in importing green hydrogen produced overseas. Because Australia and the Middle East possess high-quality renewable energy resources, they are attracting attention as suitable regions for producing green hydrogen using renewable energy. The cost of constructing and operating a green ammonia plant varies depending on the region. In this study, an economic feasibility comparison of green ammonia plant construction in Australia and the Middle East is conducted. Through this, it is expected to contribute to the economic analysis and feasibility analysis of the project to import hydrogen in the form of green ammonia into Korea.

A Study on the Analysis of Failures Related to Emergency Diesel Generators in Overseas Nuclear Power Plants (원전용 비상디젤발전기 국외 손상사례 분석에 관한 연구)

  • Chang, Jung-Hwan;Kim, Jin-Sung;Chung, Hae-Dong;Cho, Kwon-Hae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.5 no.1
    • /
    • pp.32-37
    • /
    • 2009
  • The emergency diesel generator (EDG) in a nuclear power plant (NPP) shall start within 10 secondss and supply electrical power to engineered safety features within one minute and less if a loss of offsite power (LOOP), A design-basis event, or their combination occur. Each NPP has an EDG set consisting of two diesel generators for redundancy. In addition to the EDG set, an alternate Alternating Current Diesel Generator (AAC DG) is installed and shared by several units to cope with a station black out (SBO), i.e., loss of the offsite power concurrent with reactor trip and unavailability of the EDG set. The objective of this study is to analyze the failure data of emergency diesel generators reported in overseas nuclear power plants.

  • PDF

Research on a Conceptual Model of Architecture Framework for Power Plant Operations & Maintenance(Q&M) (발전 플랜트 O&M을 위한 아키텍처 프레임워크 개념모델에 관한 연구)

  • Lim, Yong Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.1
    • /
    • pp.83-88
    • /
    • 2018
  • Engineering is a sector with more than three times the industrial effectiveness of manufacturing. In the domestic engineering life cycle, the Operations & Maintenance (O&M) phase is a relatively high level of technology. Based on accumulated knowledge of O&M phase, it is necessary to advance operating technology and expand overseas O&M market expenditure. This study is the early stage of knowledge-based power plant O&M service framework reference model. In this study, we propose a conceptual model of architecture framework for power plant O&M. We survey the architecture framework and reference model and propose conceptual model of architecture framework for power plant O&M. The conceptual model of architecture framework for power plant O&M consists of stakeholder, O&M scenario, O&M technology. In particular, the O&M technology is defined as the fourth industrial revolution intelligence information technology. We defined a meta model from the conceptual model to define the power plant O&M architecture framework. In the future, we intend to development an architecture framework from the conceptual model and meta model.

The Effects of Coal Thermal Power Plant Exports on the National Economy (석탄화력발전 해외수출의 경제적 파급효과 분석)

  • Jin, Se-Jun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.22 no.1
    • /
    • pp.17-27
    • /
    • 2013
  • Korean domestic electricity market is saturated through trying to find ways to overcome the limitations of the domestic electricity industry with overseas electricity markets. Korean electricity industry in the overseas market in order to pursue continuous growth, competitive and aggressive investment in overseas market is promoting. This paper attempts to apply input-output analysis to estimate the role of coal thermal power plant sector exports national economy. More specifically, this study shows what national economy effect of production-inducing effect, value-added inducing effect, and employment-inducing effect are explored with demand-driven model. After define coal thermal power plant sector what small sized of Input-Output table 168 sectors among 17 sectors, this study pays particular and close attention to coal thermal power plant sector by taking the sector as exogenous specification and then investigating economic impacts of it. This study uses coal thermal power plant exportation case of Vietnam project, production-inducing effect, value-added inducing effect, and employment-inducing effect are 2,853 billion won, 973 billion won and 14,761 persons, respectively.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

A Thesis of Design Air Operated Valve Actuator in Nuclear Power Plant (원자력 발전소 AOV 구동기 설계 정립화)

  • Choi, J.K.;Hwang, J.H.;Kim, Y.B.;Son, K.Ch.
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2616-2620
    • /
    • 2008
  • AOV used fluid capacity and fluid pressure control in nuclear power plant with heating power plant. AOV structures safely must be secured the reliability and a safety of the atomic power plant. but, AOV where is used from domestic is using the product of the overseas enterprise. The AOV design and maintenance technique is insufficient. Therefore According to ASME designed AOV, The performance test resultant fluid leakage did not occur and AOV design was satisfactory.

  • PDF

Penetration of Korean EPC Companies into International Market for Nuclear Power Plant (플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안)

  • Cho, Chan-Hyoung;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

Study on Protective Coating Management Status in Overseas Nuclear Power Plant (해외 원자력발전소 방호도장 유지관리 현황 고찰)

  • Lim, Sang-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.318-319
    • /
    • 2018
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF