• Title/Summary/Keyword: overlay analysis

Search Result 275, Processing Time 0.024 seconds

Feasibility Study of AASHTO86 Design Method for Bonded Concrete Overlay (AASHTO86 접착식 콘크리트 덧씌우기 설계법의 타당성 연구)

  • Park, Jong Won;Kim, Young Kyu;Han, Seung Hwan;Lee, Seung Woo
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.47-55
    • /
    • 2013
  • PURPOSES : This study aimed to evaluate the feasibility of AASHTO86 design method for Bonded Concrete Overlay. METHODS : The Feasibility of AASHTO86 design method for Bonded Concrete Overlay is investigated based on the following study : i) Sensitivity analysis of designed service life of Bonded Concrete Overlay by major design input for AASHTO86 guide. ii) Comparison of actual Bonded Concrete Overlay life and predicted Bonded Concrete Overlay life by AASHTO86. iii) Finding the stress component influence the potential distress of Bonded Concrete Overlay based on 3-d FEM analysis. iv) Exploring the limitation of AASHTO86 in the aspect of design input. RESULTS : Sensitivity analysis showed that the condition of existing pavement significantly on the Bonded Concrete Overlay life. Also the overlay thickness affect the Bonded Concrete Overlay life. The comparison of actual Bonded Concrete Overlay life and predicted Bonded Concrete Overlay life showed relatively good agreement when the early distress sections are excluded in comparison. Bonding stress occurred at the interface may be larger than the bond strength used in the specification of Bonded Concrete Overlay construction. CONCLUSIONS : Bonded Concrete Overlay life predicted by the AASHTO86 may not be reliable. Number of points to improve the reliability in the design of Bonded Concrete Overlay are suggested in this study.

Performance Evaluation of Bonded Concrete Overlay in Highway (고속도로 접착식 콘크리트 덧씌우기 포장의 공용성 분석)

  • Park, Jong Won;Kim, Young Kyu;Han, Seung Hwan;Lee, Seung Woo
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • PURPOSES : This study aimed to evaluate the long-term performance of bonded concrete overlay in Korean Highway, and factors influencing the performances. METHODS : The evaluation for long-term performance of bonded concrete overlay is investigated based on the following study : i) The pavement distress of number of bonded concrete overlay sections in Korean highway are collected through field measurement, and PCI for each section is calculated. ii) Performance of LTPP data of bonded concrete overlay sections in U.S.A is analysed. And it is compared with bonded concrete overlay of Korean highway. iii) An analysis of the factors influencing to long-term performance of bonded concrete overlay is investigated. RESULTS : Performance analysis was confirmed that the overlay thickness was affecting significantly on the Bonded Concrete Overlay life. The comparison of LTPP data(U.S.A) and field measurement data(Korean) was showed. CONCLUSIONS : It was showed that the performance of Korean bonded concrete overlay is relatively lower than that of the bonded concrete overlay in U.S.A. The cause of lower performance can be explained by the lack of overlay thickness.

Development of Mechanistic-Empirical Overlay Pavement Design Program (역학적-경험적 덧씌우기 포장 설계 프로그램 개발)

  • Baek, Cheol-Min;Yang, Sung-Lin;Park, Hee-Mun;Kang, Tae-Wook
    • International Journal of Highway Engineering
    • /
    • v.14 no.4
    • /
    • pp.19-28
    • /
    • 2012
  • PURPOSES : Recently, the mechanistic-empirical overlay pavement design program that is linked with Korea Pavement Research Program (KPRP) has been developed. This paper focused on establishing the framework and developing the program for the asphalt overlay design over the existing asphalt concrete pavement. METHODS : The overlay pavement design program developed in this study was investigated to assess the sensitivity to various pavement conditions, such as the damage level and thickness of existing layers. In addition, the actual overlay design on currently performing pavement was carried out as a practical example. RESULTS : From the sensitivity analysis, it was found that the thickness and damage level of existing asphalt layer mostly affect the overlay design results. In addition, under the same condition, the overlay pavement would better perform in cold region. From the overlay design with the actual condition, it is noted that the overlay thickness varies depending on the given condition. CONCLUSIONS : Based on various evaluations, it was concluded that the overlay design program developed in this study is a reliable and reasonable tool to be used in the actual pavement design.

Thin Bonded Concrete Overlay for Concrete Pavement Rehabilitation (콘크리트포장의 박층 콘크리트 덧씌우기공법)

  • 윤경구;이형준;엄주용;서영찬
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.635-642
    • /
    • 1997
  • This research focused on the development of concrete overlay and test, which was conducted at 88 Highway 105k, 2 lanes of 290 m. The field application test consists of 6 cm and 10 cm bonded concrete overlay and 25 cm unbonded concrete overlay, using the slag cement for opening lanes for traffic early. The overlay were placed in a day. The whole period of traffic closing wes 8 day and it was reopened to traffic after concrete overlay has cured for 3 day. 5 cracks were founded when the field test section was investigated after 1 month, but all these may not make significant problems to overlay because these initiated and growed at the same line of repair section. The rideability and skid resistance become much better like in the new pavement after overlay. The structural capacity against deflection was much. which were verified by FWD(Falling Weight Deflectometer). The field test section is being used in a good condition and the results of field application and pavement performance analysis are encouraging. This rehabilitation methods may be adopted in Korea after a more field performance verifications.

  • PDF

Effect of preemptive weld overlay sequence on residual stress distribution for dissimilar metal weld of Kori nuclear power plant pressurizer (고리 원전 가압기 PWOL의 용접 방향이 이종금속용접부 잔류응력 분포에 미치는 영향)

  • Bae, H.Y.;Song, T.K.;Chun, Y.B.;Oh, C.Y.;Kim, Y.J.;Lee, K.S.;Park, C.Y.
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.88-93
    • /
    • 2008
  • Weld overlay is one of the residual stress mitigation method which arrest crack. An overlay weld sued in this manner is termed a preemptive weld overlay(PWOL). PWOL was good for distribution of residual stress of dissimilar metal weld(DMW) by previous research. Because range of overlay welding is wide relatively, residual stress distribution on PWR is affected by welding sequence. In order to examine the effect of welding sequence, PWOL was applied to a specific DMW of KORI nuclear power plant by finite element analysis method. As a result, the welding direction that from nozzle to pipe is better good for residual stress distribution on PWR.

  • PDF

Interconnection of P2PSIP Overlay and IMS Network and Its Characteristics (P2PSIP Overlay와 IMS 네트워크간 상호접속 및 특성)

  • Kim, Hyun-Ji;Han, Chi-Moon
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.47 no.10
    • /
    • pp.57-66
    • /
    • 2010
  • Today the various types of communication and application service are provided by the development of Internet and IP technologies. It is expected to be extended the service domain of two networks through the interconnecting P2PSIP overlay which is highlighted as an important technologies for Internet based services and IMS(IP Multimedia Subsystem) which is the new architecture adopted in the evolution of NGN. Therefore, this paper explains the possible methods of the service expansion with interconnecting P2PSIP overlay and IMS network. Specially this paper suggests the interconnection architectures of P2PSIP overlay and IMS network as subscriber's types and analyzes the traffic analysis model and session set up delay characteristics by simulation model. As a results, this paper shows that the interconnection architecture using gateway AS(Application Server) is the excellent method to interconnect the IMS in case of P2PSIP overlay only subscriber, and that interconnection architecture using I-CSCF is good method to interconnect the IMS in case of P2PSIP overlay and IMS subscriber.

A study on the residual stress relieving for dissimilar metal weld under weld overlay (Overlay 용접을 통한 원전 이종 금속 용접부 잔류응력 완화효과에 대한 연구)

  • Song, Tae-Gwang;Bae, Hong-Yeol;Kim, Yun-Jae;Lee, Gyeong-Su;Park, Chi-Yong
    • Proceedings of the KWS Conference
    • /
    • 2007.11a
    • /
    • pp.260-262
    • /
    • 2007
  • In nuclear power plants, residual stress of dissimilar metal weld propagates cracks in the weld metal which is susceptible to stress corrosion cracking. Overlay welding is a process widely used to mitigate residual stress replacing inside tensile stress by compressing stress. The purpose of this paper is to predict the effect of weld overlay by finite element analysis.

  • PDF

Queuing Analysis for Overlay/Underlay Spectrum Access in Cognitive Radio Networks

  • Do, Cuong T.;Hong, Choong-Seon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06d
    • /
    • pp.190-192
    • /
    • 2012
  • In this paper, we present theoretical queuing analysis for hybrid overlay/underlay Cognitive Radio (CR) system by applying M/M/1 queuing model where the rate of arrival and the service capacity are subject to Poisson alterations. Numerical results are used to prove a high degree of accuracy for the derived expressions. The result can be used as a benchmark to evaluate the performance of a hybrid overlay/underlay CR system.

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

Comparison of Asphalt Concrete Inlay and Overlay for Rehabilitation of Aged Cement Concrete Pavement through Accelerated Pavement Testing and Life-Cycle Cost Analysis (포장가속시험 및 경제성 분석을 통한 절삭 덧씌우기와 비절삭 덧씌우기의 비교)

  • Suh, Young Chan;Kwon, Hong Jun;Lee, Eung Jun
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.75-81
    • /
    • 2017
  • PURPOSES : So far, aged cement concrete pavement on express highways has been rehabilitated mainly with asphalt concrete inlay. However, potholes were the major problem, and they shortened the life of the inlay mainly owing to the poor drainage of water once it infiltrated the interface of the concrete and asphalt. The purpose of this study is to compare the performance and economic efficiency of asphalt overlay and inlay. METHODS : Overlay and inlay were compared through accelerated pavement testing, and a life-cycle cost analysis was conducted in this study using the CA4PRS program. RESULTS and CONCLUSIONS : It was found from accelerated pavement testing that the overlay exhibited reflective crack resistance that was more than twice as effective as that of inlay. The total cost (construction cost + user cost) within the analysis period (20 years) of the overlay was 37% lower than that of the inlay.