In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.
본 연구에서는 주방식 지하구조물의 안정성 검토방안을 마련하기 위해 암주와 천장부의 거동을 수치해석 방법으로 검토하였다. 또한, 기존 자원개발 분야에서 고려하는 주방식 공법의 설계 개념과는 달라져야 하는, 공간 확보차원에서의 합리적인 주방식 공법의 설계 절차 및 개념을 제시하였다. 주어진 지반 조건에서 암주의 형상비와 천장부의 길이에 따른 수치해석을 수행하였으며 초기 이완이 시작되는 시점에서의 파괴유형과 위치 변화를 검토하였다. 해석결과, 천장부 폭과 암주 폭과의 비(w/s)와 파괴시점의 상재하중간의 관계는 선형관계를 보였으며, 천장부 폭과 암주 폭의 비가 주방식 채광 설계에서는 매우 중요한 설계인자로 다루어지는 암주의 폭과 높이 비(w/H)보다 구조물의 안정성 확보차원에서는 더욱 민감한 설계인자인 것으로 나타났다. 이는, 암주의 안정성 만을 확보하는 차원에서 수행되는 주방식 채광 설계법과는 달리, 암주부와 함께 구조물 천장부 및 어깨부의 안정성까지도 함께 고려하여 지하구조물의 안정성을 확보할 수 있는 구조물 설계가 되어야 함을 의미한다. 또한, 지하구조물의 형상에 따라 초기 이완대가 발생하는 위치와 전단 또는 인장파괴 등 파괴유형도 다르게 나타나, 주방식 지하구조물에 대한 설계는 상재하중에 따른 천장부와 암주의 안정성을 연계하여 수행하는 것이 필요하다.
보강토 구조물에서 흙과 보강재 상호작용은 접촉면 마찰저항 또는 보강재 인발저항에 의해 발생되며, 신장성 지오그리드 보강재의 인발정수를 측정하기 위하여 일반적으로 인발시험을 실시한다. 인발시험시 인발정수에 영향을 미치는 요소는 뒷채움재의 밀도, 보강재의 형상, 토피하중, 보강재의 포설길이 등이 있다. 본 연구에서는 인발시험시 합리적인 인발정수 산정을 위한 신장성 보강재의 포설길이를 제안하고자 인발시험을 실시하였으며, 보강재 포설길이는 각각 32cm, 52cm, 72cm, 100cm로 선정하였다. 인발시험결과 보강재 포설길이에 따른 인발정수의 영향을 분석하였으며, 인발시험에서 흙과 보강재사이의 마찰저항은 보강재 포설길이가 증가할수록 증가함을 확인하였다.
도심지 특성상 주변구조물에 근접한 발파로 발생되는 지반진동은 인체에 간접피해와 구조물에 물적피해를 줄 수 있다. 설계단계 또는 시공 전 민원발생 시 구조물의 피해정도를 평가하는 방법으로는 단순 진동파형을 정량적으로 표현하는데 가장 접근성이 좋은 시추공 발파시험이 주로 이용되고 있다. 본 연구는 소량의 폭약으로 인위적인 진동에너지를 발생시키는 발파시험에 전자뇌관 기폭시스템을 처음 적용하였다. 전기뇌관 시추공 발파와 전자뇌관 시추공발파의 뇌관 지연시차 상관관계, 시험장소의 터널본선과 유사 암층에 시설된 구조물에서 측정한 PPV와 서로 다른 매개 층을 포함한 터널상부 지상도로에서 측정한 PPV의 상관관계, 기존 연구결과 얻어진 시추공발파 및 터널발파 PPV와의 상관관계를 비교 분석하여 시추공 발파의 유용성과 뇌관 지연시차의 중요성을 언급하고자 한다.
To analysis of the embanked slope stability using a jointed reinforcement, the internal stability and the external stability have to be satisfied, respectively. But, because the lengths of ready-made steel-grid were limited, the reinforcements must be connecting themselves to the reinforcing. In this study, the mechanical test was carried out to investigate the tensile failure and the pullout failure at the joint parts of them, which was based on the analysis of reinforced slope in field. Through the tensile tests in mid-air for the jointed steel-grid, the deformation behavior was seriously observed as follows : deformation of longitudinal member, plastic deformation of longitudinal member and of crank part. Those effects were due to the confining pressure and overburden pressure of the surrounding ground. The bearing resistance at jointed part of jointed steel-grid was due to the latter only. The maximum tensile forces were higher about 20kN~27kN than ultimate pullout resistance, but, the results of those was almost the same in mid-soil. The failures of steel-grid occurred at welded point both of longitudinal members and transverse members and of jointed parts. The strength of jointed parts itself got pullout force about 20kN, which was about 65% for ultimate pullout force of the longitudinal members N=2. To the stability analysis of reinforced structure including the reinforced slope, the studying of connection effects at jointed part of reinforcement members must be considered. Through the results of them, the stability of reinforced structures should be satisfied.
A micromodel was applied to estimate the effects of geological conditions and injection methods on displacement of resident porewater by injecting scCO2 in the pore scale. Binary images from image analysis were used to distinguish scCO2-filled-pores from other pore structure. CO2 flooding followed by porewater displacement, fingering migration, preferential flow and bypassing were observed during scCO2 injection experiments. Effects of pressure, temperature, salinity, flow rate, and injection methods on storage efficiency in micromodels were represented and examined in terms of areal displacement efficiency. The measurements revealed that the areal displacement efficiency at equilibrium decreases as the salinity increases, whereas it increases as the pressure and temperature increases. It may result from that the overburden pressure and porewater salinity can affect the CO2 solubility in water and the hydrophilicity of silica surfaces, while the neighboring temperature has a significant effect on viscosity of scCO2. Increased flow rate could create more preferential flow paths and decrease the areal displacement efficiency. Compared to the continuous injection of scCO2, the pulse-type injection reduced the probability for occurrence of fingering, subsequently preferential flow paths, and recorded higher areal displacement efficiency. More detailed explanation may need further studies based on closer experimental observations.
도시지역에 주로 건설되는 지하차도는 기존의 터널과 달리 지표면에 근접한 지반에 시공되어 지하수의 양압력에 의한 구조물 부상 및 손상이 발생할 수 있다. 도심지 지하차도의 기존 설계방법(사하중 증가 또는 영구앵커 등의 부력 대처공법)은 지나치게 안전측인 보수적 설계를 수행하고 있어 시공기간 및 경제적 비용 증가를 초래한다. 최근 이를 보완하는 공법으로 영구배수공법 사용이 증가하고 있으나 대상 토질과 지하수 등을 고려한 적절한 분석과정 없이 선정되는 실정이다. 따라서 본 연구에서는 최근 Y지역에 설치되는 영구배수공법의 일종인 유도배수공법을 대상으로 지반공학적 관점에서 합리적인 설계체계를 수립하기 위해 지하수위 변화, 지하차도 옹벽 높이, 기초지반 조건 등 다양한 매개변수에 대한 수치해석을 수행하였다. 본 연구 결과로부터 유도배수공법은 지하수에 의해 발생하는 양압력을 효과적으로 저감시킬 수 있음을 확인하였다.
The laboratory tests are performed on how the liquefaction potential of the sea dike structures on the saturated sand or silty sand seabed could be affected due to earthquake before and after construction results are given as follows ; 1. Earthquake damages to sea dike structures consist of lateral deformation, settlement, minor abnormality of the structures and differential settlement of embankments, etc. It is known that severe disasters due to this type of damages are not much documented. Because of its high relative cost of the preventive measures against this type of damages, the designing engineer has much freedom for the play of judgement and ingenuity in the selection of the construction methods, that is, by comparing the cost of the preventive design cost at a design stage to reconstruction cost after minor failure. 2. The factors controlling the liquefaction potential of the hydraulic fill structure are magnitude of earthquake(max. surface velocity), N-value(relative density), gradation, consistency(plastic limit), classification of soil(G & vs), ground water level, compaction method, volumetric shear stress and strain, effective confining stress, and primary consolidation. 3. The probability of liquefaction can be evaluated by the simple method based on SPT and CPT test results or the precise method based on laboratory test results. For sandy or silty sand seabed of the concerned area of this study, it is said that evaluation of liquefaction potential can be done by the one-dimensional analysis using some geotechnical parameters of soil such as Ip, Υt' gradation, N-value, OCR and classification of soils. 4. Based on above mentioned analysis, safety factor of liquefaction potential on the sea bed at the given site is Fs =0.84 when M = 5.23 or amax= 0.12g. With sea dike structures H = 42.5m and 35.5m on the same site Fs= 3.M~2.08 and Fs = 1.74~1.31 are obtained, respectively. local liquefaction can be expected at the toe of the sea dike constructed with hydraulic fill because of lack of constrained effective stress of the area.
최근에는 블록식 방파제의 단점을 보완하고 경제적인 설계가 가능한 타이셀소파블록에 대한 관심이 증가하고 있다. 타이셀소파블록은 각 블록을 말뚝으로 결속한 구조체로 활동저항성이 매우 우수한 특징을 가지고 있다. 본 연구에서는 실내모형실험을 통해 말뚝의 관입으로 인한 타이셀소파블록의 수평저항력 증가를 명확하게 확인할 수 있었다. 그리고 말뚝의 수평저항력은 블록의 상재하중에 상관없이 거의 일정하게 나타났다. 말뚝이 분담하는 수평저항력은 블록과 블록사이의 마찰이 담당하는 수평저항력 증감에 따라 변화하였다. 말뚝을 두개 관입시킨 실험에서는 싱글말뚝을 사용한 경우 보다 전반적으로 수평저항력이 크게 나타났으나 말뚝의 저항 거동은 다르게 나타났다.
한국의 대심도 (>40m 깊이) 터널 공사 시에 터널 붕괴 사고가 종종 일어나고 있으며, 도심지 지하공간의 얕은 심도에 인공적으로 조성된 지반에는 자연 공동뿐만 아니라 상수도관, 하수도관, 전력구 및 지하철 건설로 인한 인위적인 공동들이 복잡하게 분포되어 있다. 대심도 터널 굴착을 위해서는 이러한 다공질의 특성을 보이는 다양한 지반의 특성 및 지질구조가 지반의 안전에 미치는 영향을 이해하여야 한다. 본 연구는 국내외 사례를 바탕으로 한국의 대심도 굴착에서 암반의 위험 산정을 위한 위험 인자를 분석하였다. 연구결과, 대심도 터널 굴착시 지반의 안정성에 영향을 주는 총 7개의 카테고리들과 총 38개의 인자들이 도출되었다. 가중치가 상대적으로 높은 인자들은 단층 및 단층점토, 차응력, 암종, 지하수 및 머드 유입, 암석의 일축압축강도, 터널 단면의 크기, 터널 상부 암반의 두께, 카르스트 및 계곡지형, 습곡, 석회암의 협재, 지하수위 변동, 터널 심도, 암맥, RQD, 절리 특성, 이방성, 암반파열(rockburst) 등으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.