• 제목/요약/키워드: over-strength

검색결과 2,770건 처리시간 0.026초

Whitetopping 포장재의 시험포설 및 시공품질에 대한 평가연구 (A Study on the quality of High Early Strength Concrete as Whitetopping Materials)

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.507-512
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/$mm^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with concrete and evaluated the properties of the fresh and hardened concrete. The flexural strength was over 5.0N/$mm^2$ and the compressive strength was over 30N/$mm^2$ at 1 day. So it is thought that the road can be open to traffic within 1 day after placement.

  • PDF

표준공과 과대공을 갖는 고장력볼트 접합부의 강도변화 (Change of Strength of High-Strength Bolted Connection Depending on Standard and Over Bolt Hole)

  • 양승현
    • 한국강구조학회 논문집
    • /
    • 제24권5호
    • /
    • pp.605-612
    • /
    • 2012
  • 표준공으로 고장력볼트를 체결한 인장부재는 구조내력은 증가하지만 시공성이나 경제성 측면에서 문제점을 야기시키게 된다. 본 연구에서는 인장부재의 고장력볼트 체결부를 표준공 및 과대공으로 하는 총 28개의 시험편을 제작하여 인장시험을 실시하였다. 시험결과로부터 얻어진 표준공 및 과대공 시험편의 인장하중을 순단면 및 연단거리에 의한 설계강도와 비교하여 연결부의 강도변화를 확인하였다. 과대공으로 제작된 시험편의 인장하중은 표준공으로 제작된 시험편의 인장하중보다 감소하였으나, 현행 설계기준의 설계강도를 상회하였으며 과대공으로 인하여 다소의 강도저하는 부득이하지만 안전성을 만족하였다.

중력하중에 대하여 설계된 RC 골조의 내진 저항력 추정식의 유도 (Derivation of Estimating Formulas for Seismic Strength of RC Frames Designed to Gravity Loads)

  • 이영욱
    • 한국지진공학회논문집
    • /
    • 제6권3호
    • /
    • pp.63-71
    • /
    • 2002
  • 중력하중에 대하여서만 설계되고 내진에 대하여 설계되지 않은 6층 미만의 RC 골조를 대상으로 내진 저항력에 대한 추정식을 유도하였다. 추정식의 산정을 위하여 기둥 소성 힌지 붕괴기구와 보 소성 힌지 붕괴기구의 2가지 경우를 가정하여 이론식을 유도하였으며, 이를 4층 및 3층 건물의 push-over해석과 비교하였다. 연구 결과로, 중력 하중에 대하여서만 설계된 구조물의 내진 저항력은 bay수의 증가와 크게 관계가 없으며 저층일수록 증가하는 기존의 연구 결과와 잘 일치함을 알 수 있었다. 설계시 기둥의 철근 강도와 철근비가 증가할수록 내진 저항력이 증가함을 알 수 있었다. 또한 스팬의 길이보다는 기둥 춤의 크기가 내진저항력에 더 많은 영향을 미침을 알 수 있었다.

신속개방형 콘크리트 도로포장재의 설계를 위한 실험실적 평가 연구 (A Study on Design of High Early Strength Cement and Concrete for Road Way Pavements)

  • 임채용;엄태선;신국재;이종열;엄주용;조윤호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.295-300
    • /
    • 2001
  • In road pavements, it is known that cement concrete pavement has superior durability, safety in compared with asphalt concrete pavement. But in reparing pavement cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixied concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope specific cement and concrete developing 1 day strength of over 300 kg/$cm^{2}$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we Produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The concrete strength was over 300 kg/$cm^{2}$ at 1 day and 550 kg/$cm^{2}$ at 28 day and workable time was maintained for over 1 hour.

  • PDF

신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2) (A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF

Implementing a Dielectric Recovery Strength Measuring System for Molded Case Circuit Breakers

  • Cho, Young-Maan;Rhee, Jae-ho;Baek, Ji-Eun;Ko, Kwang-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권4호
    • /
    • pp.1752-1758
    • /
    • 2018
  • In a low-voltage distribution system, the molded case circuit breaker (MCCB) is a widely used device to protect loads by interrupting over-current; however the hot gas generated from the arc discharge in the interrupting process depletes the dielectric recovery strength between electrodes and leads to re-ignition after current-zero. Even though the circuit breaker is ordinarily tripped and successfully interrupts the over-current, the re-ignition causes the over-current to flow to the load again, which carries over the failure interruption. Therefore, it is necessary to understand the dielectric recovery process and the dielectric recovery voltage of the MCCB. To determine these characteristics, a measuring system comprised of the experimental circuit and source is implemented to apply controllable recovery voltage and over-current. By changing the controllable recovery voltage, in this work, re-ignition is driven repeatedly to obtain the dielectric recovery voltage V-t curve, which is used to analyze the dielectric recovery strength of the MCCB. A measuring system and an evaluation technique for the dielectric recovery strength of the MCCB are described. By using this system and method, the measurement to find out the dielectric recovery characteristics after current-zero for ready-made products is done and it is confirmed that which internal structure of the MCCB affects the dielectric recovery characteristics.

Precise dynamic finite element elastic-plastic seismic analysis considering welds for nuclear power plants

  • Kim, Jong-Sung;Jang, Hyun-Su
    • Nuclear Engineering and Technology
    • /
    • 제54권7호
    • /
    • pp.2550-2563
    • /
    • 2022
  • This study performed a precise dynamic finite element time history elastic-plastic seismic analysis considering the welds, which have been not considered in design stage, on the nuclear components subjected to severe seismic loadings such as beyond-design basis earthquakes for sustainable nuclear power plants. First, the dynamic finite element elastic-plastic seismic analysis was performed for a general design practice that does not take into account the welds of the pressurizer surge line system, one of safety class I components in nuclear power plants, and then the reference values for the accumulated equivalent plastic strain, equivalent plastic strain, and von Mises effective stress were set. Second, the dynamic finite element elastic-plastic seismic analyses were performed for the case of considering only the mechanical strength over-mismatch of the welds as well as for the case of considering both the strength over-mismatch and welding residual strain. Third, the effects of the strength over-mismatch and welding residual strain were analyzed by comparing the finite element analysis results with the reference values. As a result of the comparison, it was found that not considering the strength over-mismatch may lead to conservative assessment results, whereas not considering the welding residual strain may be non-conservative.

고장력강판 및 2층아연도금된 고장력 강판의 점용접성에 관한 연구 (A Study on the Spot Weldability of High Strength Steel Sheet and Two Stories Galvannealed High Strength Steel Sheet)

  • 신현일;강성수
    • Journal of Welding and Joining
    • /
    • 제12권3호
    • /
    • pp.56-62
    • /
    • 1994
  • The spot weldability of high strength steel sheet and two stories galvannealed high strength steel sheet has been studied. 1) Tensile shear strength decreased inversely as welding current increased over 12KA in the case of two stories galvannealed high strength steel sheet. 2) When heat flux input over 12KA, hardening region become narrow in case of two stories galvannealed high strength steel sheet. 3) The size of hardening region affect the strength of nuggets.

  • PDF

소규모 철근콘크리트 모멘트골조 건축물의 초과강도, 연성도 및 반응수정계수 (Over-Strength, Ductility and Response Modification Factor of Small-Size Reinforced Concrete Moment Frame Buildings)

  • 김태완;추유림;박홍근;신영수
    • 한국지진공학회논문집
    • /
    • 제20권3호
    • /
    • pp.145-153
    • /
    • 2016
  • Small-size buildings are not designed by professional structural engineers in Korea. Therefore, their seismic performance can not be exactly estimated because their member sizes and reinforcement may be over- or under-designed. A prescriptive design criteria for the small-size buildings exists, but it also provides over-designed structural members since structural analysis is not incorporated, so it is necessary to revise the prescriptive criteria. The goal of this study was to provide an information for the revision, which is seismic performance and capability of small-size reinforced concrete moment frame buildings. For the study, the state of existing small-size reinforce-concrete buildings such as member size and reinforcement was identified by investigating their structural drawings. Then, over-strength, ductility and response modification factor of the small-size reinforced concrete moment frame buildings were estimated by analytical approach along with seismic performance check. The result showed that they possess moderate over-strength and ductility, and may use slightly increased response modification factor.

아원계 조강재를 이용한 1일 공용 콘크리트 개발연구 (A Study on Development of 1 Day Usable High Early Strength Concrete Using Hauyne C/K System Additives)

  • 박정준;백상현;신영훈;김병권;윤경구;엄태선
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 학회창립 10주년 기념 1999년도 가을 학술발표회 논문집
    • /
    • pp.73-76
    • /
    • 1999
  • In recent, concrete material like specific cement and additives having many functions hsa been developed. In road pavement, ultra high early strength cement or organic material are used to open the road early, but there are many restrictions like workable time and special equipment. We aim to developed specific concrete which 1 day strength is over 300kgf/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can make the concrete ready mixed concrete. In this study, we are convinced if the ratio of hauyne clinker or its additive is increased early strength property is progressed and if the ratio of non hydrous gypsum is increased longtime strength is progressed. The concrete strength is 290-310 kgf/$\textrm{cm}^2$ at 1 day, 570-640 kgf/$\textrm{cm}^2$ at 28 day and the workable time is maintained over 30 minutes. As the results of this experiments We find out the possibility to developed the 1 day usable ready mixed concrete with high early strength.

  • PDF