• 제목/요약/키워드: outage cost

검색결과 102건 처리시간 0.037초

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권2호
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

각 부하지점별 유효부하지속곡선 작성법에 관한 연구 (A Study on Construction of the CMELDC at Load Points)

  • 김홍식;문승필;최재석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권4호
    • /
    • pp.195-198
    • /
    • 2000
  • This paper illustrates a new method for constructing composite power system effective load duration curve(CMELDC) at load points. The main concept of proposed method is that the CMELDC can be obtain from convolution integral processing of the outage probabilistic distribution function of not supplied power and the load duration curve given at each load point. The effective load duration curve (ELDC) at HLI plays an important part in probabilistic production simulation, reliability evaluation, outage cost assessment and power supply margins assesment for power system planning and operation. And also, the CMELDC at HLII will extend the application areas of outage cost assessment and reliability evaluation at each load point. The CMELDC at load points using the Monte Carlo method and a DC load flow constrained LP have already been developed by authors. The effective load concept at HLII, however, has not been introduced sufficiently in last paper although the concept is important. In this paper, the main concept of the effective load at HLII which is proposed in this study is defined in details as the summation of the original load and the probabilistic loads caused by the forced outage of generators and transmission lines at this load point. The outage capacity probabilistic distribution function at HLII can be obtained by combining the not supplied powers and the probabilities of the not supplied powers at this load point. It si also expected that the proposed CMELDC can be applied usefully to research areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. at HLII in future. The characteristics and effectiveness of this methodology are illustrated by case study of IEEE-RTS.

  • PDF

공급지장비를 포함한 송전계통계획 (Transmission System Expansion Planning Considering Outage Cost)

  • 최재석;오태곤;임진택;조경희;전동훈;홍성은
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.361-363
    • /
    • 2011
  • This paper proposes a method for choosing the best transmission system expansion(TEP) plan considering an annual outage cost and a probabilistic transmission system reliability criterion ($_RLOLE_{TS}$). The objective method minimizes a total cost which are an investment budget for constructing new transmission lines and an annual outage cost, subject to the probabilistic transmission system reliability criterion, which consider the uncertainties of power system facilities. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the transmission system expansion planning problem subject to practical future uncertainties.

  • PDF

TRELSS를 이용한 KEPCO 계통의 공급지장비 추정연구 (Area Annual Outage Cost Assessment of KEPCO System by TRELSS)

  • 사박;정상헌;박정제;최재석;전동훈;윤용범;장병훈;문승필;한경남
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.578-579
    • /
    • 2007
  • The importance and necessity of conducting studies on area outage cost assessment have been increasingly important in recent years due to the competitive electricity market environment. The objective of operational issues would be to minimize the total area cost while satisfying all associated system constrains of each area[2]. This paper presents a methodology of the Area annual outage cost assessment by probabilistic reliability evaluation using TRELSS program for KEPCO system. The interrupted energy assessment rate (IEAR) is evaluated by macro approach that is using relations between GRDP and the electrical energy demand. The Expected Energy Not Supplied (EENS) of each area was evaluated using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper.

  • PDF

송전계통확충계획을 위한 확률론적 최적신뢰도 기준설정에 관한 연구 (A Study on Probabilistic Optimal Reliability Criterion Determination in Transmission System Expansion Planning)

  • 트란트룽틴;권중지;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.748-750
    • /
    • 2005
  • This paper approaches a methodology for deciding the optimal reliability criteria for an optimal composite power system expansion planning considering generation and transmission systems simultaneously. A probabilisticreliability criterion, $LOLE_R$(Loss of Load Expectation), is used in this study. The optimalreliability criterion $LOLE_R*$ is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering forced outage rates of elements(generators and lines) in long term forecasting. The characteristicsand effectiveness of this methodology are illustrated by the case study using MRBTS size system.

  • PDF

국내 배편계통의 최적 개폐기 설치 기준 (The Optimized Standards and Criteria for Installing Switches on Distribution Feeder)

  • 조남훈;하복남;이흥호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권5호
    • /
    • pp.238-246
    • /
    • 2002
  • Utilities are trying to install the equipment of high quality to avoid deterioration of supply reliability. In addition, many sectionalizing switches which can decrease the total outage value for a fault are installed for the same reason. Therefore, utilities are interested in stun dards and criteria for installing switches to optimize the total cost on distribution systems. The affect of sectionalizing switches installed on distribution feeder is gradually decreased because the failure rate on distribution feeder is decreased. Also the automation for distribution systems is widely applied for the efficient operation. Therefore, the renewal for installation standards of sectionalizing switches Is required to reflect the current operation situation. The variable data is used to consider the KEPCO's real situation of distribution feeder as follows; the feeder capacity, connecting rate, feeder length, failure rate of distribution feeder, the failure rate of switches, perception time of feeder fault, the restoration time for a faulted section, the transfer time to other feeders, and the switching time. In this study, We propose equations which can determine the number of sectionalizing switches for minimizing the outage and switch installation cost.

국내 배전계통의 최적 개폐기 설치 기준(I) (The optimized standards and criteria for installing switches on distribution feeder)

  • 조남훈;오재형;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.70-73
    • /
    • 2002
  • Utilities are trying to install the equipment of high quality to avoid deterioration of supply reliability. In addition, many sectionalizing switches which can decrease the total outage value for a fault are installed for the same reason. Therefore, utilities are interested in standards and criteria for installing switches to optimize the total cost on distribution systems. The affect of sectionalizing switches installed on distribution feeder is gradually decreased because the failure rate on distribution feeder is decreased. Also the automation for distribution systems is widely applied for the efficient operation. Therefore, the renewal for installation standards of sectionalizing switches is required to reflect the current operation situation. The variable data is used to consider the KEPCO's real situation of distribution feeder as follows; the feeder capacity, connecting rate, feeder length, failure rate of distribution feeder, the failure rate of switches, perception time of feeder fault, the restoration time for a faulted section, the transfer time to other feeders, and the switching time. In this study, We propose equations which can determine the number of sectionalizing switches for minimizing the outage and switch installation cost.

  • PDF

Evaluation of Optimal Transfer Capability in the Haenam-Jeju HVDC System Based on Cost Optimization

  • Son Hyun-Il;Kim Jin-O;Lee Hyo-Sang;Shin Dong-Joon
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권3호
    • /
    • pp.303-308
    • /
    • 2005
  • The restructure of the electrical power industry is accompanied by the extension of the electrical power exchange. One of the key pieces of information used to determine how much power can be transferred through the network is known as available transfer capability (ATC). The traditional ATC deterministic approach is based on the severest case and it involves a complex procedure. Therefore, a novel approach for A TC calculation is proposed using cost optimization in this paper. The Jeju Island interconnected HVDC system has inland KEPCO (Korean Electric Power Corporation) systems, and its demand is increasing at the rate of about $\10[%]$ annually. To supply this increasing demand, the capability of the HVDC system must be enlarged. This paper proposes the optimal transfer capability of the HVDC system between Haenam in the inland and Jeju in Cheju Island through cost optimization. The cost optimization is based on generating cost in Jeju Island, transfer cost through Jeju-Haenam HVDC system and outage cost with one depth (N-1 contingency).

다중경로 환경에서 새로운 안테나 선택 기법의 사고확률 (Outage Probability of a Novel Antenna Selection Schemes in Multipath Environment)

  • 임연주;오창국;박상규
    • 한국통신학회논문지
    • /
    • 제28권11A호
    • /
    • pp.876-882
    • /
    • 2003
  • 차세대 무선 통신 시스템에서는 큰 채널 용량 이득을 얻기 위해 다중 송수신 안테나(Multiple Input Multiple Output : MIMO) 시스템을 갖는 공간 다중화(spatial multiplexing) 기술이 사용될 것이다. 다중 송수신 안테나 시스템은 비용과 복잡성을 줄이기 위해 송신 안테나 혹은 수신안테나 중에서 이용 가능한 부집합(subset)의 안테나만을 선택하는 것이 요구될 것이다. 본 논문에서는 다중경로를 가지는 다중 송수신 안테나 시스템에 적합한 안테나 선택 기법을 제안한다. 그리고 제안된 안테나 선택 기법을 사용한 다중 송수신 안테나 시스템의 채널 용량과 사고 확률(outage probability)을 구한다.