• Title/Summary/Keyword: outage

Search Result 894, Processing Time 0.029 seconds

Study on the Estimation of Macroscopic Outage Cost using Reduction of Regional Added Value due to Power Outage (정전에 따른 지역 및 산업종별 부가가치 저감을 고려한 거시적 관점에서의 지역별 공급지장비 단가 산정에 관한 연구)

  • Lee, Jae-Gul;Choy, Young-Do;Jeon, Dong-Hoon;Seo, Chul-Soo;Choi, Jae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.726-732
    • /
    • 2011
  • To establish the transmission system expansion plan based on reliability, valuation of outage cost become more important. In previous studies about outage cost estimation, macroscopic, microscopic and analytic methods are proposed but they have some limit. For instance, microscopic method involves a complex field survey process and macroscopic method can not estimate regional outage cost. So in this paper, a new method to estimate regional macroscopic outage cost using the reduction of value added due to power outages is proposed. This method uses regional add value according to production activities called Gross Regional Domestic Product(GRDP) and regional electricity sales.

Outage Analysis and Optimization for Four-Phase Two-Way Transmission with Energy Harvesting Relay

  • Du, Guanyao;Xiong, Ke;Zhang, Yu;Qiu, Zhengding
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.10
    • /
    • pp.3321-3341
    • /
    • 2014
  • This paper investigates the outage performance and optimization for the four-phase two-way transmission network with an energy harvesting (EH) relay. To enable the simultaneous information processing and energy harvesting at the relay, we firstly propose a power splitting-based two-way relaying protocol (PSTWR). Then, we discuss its outage performance theoretically and derive an explicit expression for the system outage probability. In order to find the optimal system configuration parameters such as the optimal power splitting ratio and the optimal transmit power redistribution factor, we formulate an outage-minimized optimization problem. As the problem is difficult to solve, we design a genetic algorithm (GA) based algorithm for it. Besides, we also investigate the effects of the power splitting ratio, the power redistribution factor at the relay, and the source to relay distance on the system outage performance. Finally, extensive simulation results are provided to demonstrate the accuracy of the analytical results and the effectiveness of the GA-based algorithm. Moreover, it is also shown that, the relay position greatly affects the system performance, where relatively worse outage performance is achieved when the EH relay is placed in the middle of the two sources.

Web based Online Outage Cost Assessment and Information System of Electrical Energy (웹기반 온라인 전기에너지 공급지장비 추정 및 정보 시스템의 개발)

  • Lim, Jin-Taek;Choi, Jae-Seok;Jeon, Dong-Hoon;Seo, Chul-Soo;Lee, Jae-Gul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1249-1259
    • /
    • 2012
  • This paper proposes a Web Based Online Outage Cost Assessment and Information System(WOOCAIS) for power system outage cost assessment. The proposed WOOCAIS is a kind of web based survey method for outage cost assessment. While conventional survey methods have done outage cost assessment based on survey paper lists collected by post mail or visiting customers, the proposed WOOCAIS is a web based online survey operation and assessment system. Therefore, it can curtail expenditure for survey and also is more convenient than conventional method. It will be set up for actual outage cost assessment system of KEPCO in South Korea in the near future. The WOOCAIS will be applied in various research and actual planning and operation areas. First of all, the assessed results may be not only applied as one of objective function for generation system and grid expansion but also operational planning problems in power system.

A Restoration Algorithm using Moving the tie Switch in Distribution System in case of Fault Occur in Power system Substation MTR (변전소 내 주변압기 사고 발생 시 배전계통 연계점 이동을 통한 복구 알고리즘)

  • Hong, Jun-Ho;Lee, Seung-Jae;Choi, Myeon-Song;Lim, Il-Hyung;Kim, Tae-Wan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.159_160
    • /
    • 2009
  • In this paper proposes a new algorithm of efficiency outage restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads.

  • PDF

Analysis of current characteristics of outage generator for microgrid in outage mode operation (마이크로그리드용 순간정전발생기의 순간정전모드 동작시 전류특성 해석)

  • Lee, Y.H.;Min, B.H.;Nho, E.C.;Kim, I.D.;Chun, T.W.;Kim, H.G.
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.130-132
    • /
    • 2008
  • This paper describes the current characteristics of outage generator for microgrid in outage mode operation. The outage can be generated with 3-phase voltage disturbance generator. The STS current becomes very huge during the first cycle of the outage, and the magnitude of the current depends on the time impedance, series transformer leakage inductance, interfacing reactor of PCS, and the maximum allowable PCS output current. The current and load voltage waveform are analysed through simulation.

  • PDF

A Study on the DB Management System for Outage Management of Power System (전력계통설비 정지관리를 위한 DB관리 구축방안에 관한 연구)

  • Kim T. W.;Heo J. Y.;Kim C. W.;Lee S. W.;Kim J. C.;Lee G. Y.;Lee S. J.;Lee C. G.;Cho B. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.110-112
    • /
    • 2004
  • The outage management is very important because the outage causes a severe damage to the power system. Therefore, the utilities employ the outage management system, which is different from each others. This paper suggests the four kind of database systems for outage management. The efficiency of the outage management may be improved by using the suggested database system.

  • PDF

Application of outage-free work techniques to distribution lines (배전선로 무정전 공법의 현장 적용상의 문제점과 전망)

  • Park, Jung-Shin;Kwon, Oh-Hyung;Lee, Jae-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.966-968
    • /
    • 1997
  • Our country is still suffering from much work outage, nearly 80% of total outage time, in 22.9kV-Y multi-grounded distribution lines. Therefore, KEPCO which is the sole utility owned by the Korean government has developed outage-free work techniques to improve the reliability of power supply in Our country. This paper is to introduce the developing process and good effects of outage-free work techniques, and the equipment developed and applied in Our country. This paper will aid many utilities to try to reduce the work outage.

  • PDF

Application and prospects Of outage-free work techniques to distribution lines (배전선로의 무정전 공법의 현장 적용과 향후 전망)

  • Park, Jung-Shin;Lee, Jae-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.689-691
    • /
    • 1996
  • Our country, is still suffering from much work outage, nearly 80% of total outage time, in 22.9kV-Y multi-grounded distribution lines. Therefore, KEPCO which is the sole utility owned by the Korean government ms developed outage-free work techniques to improve the reliability of power supply in Our country. This paper is to introduce the developing process and good effects of outage-free work techniques, and the equipment developed and applied in Our country. This paper will aid many utilities to try to reduce the work outage.

  • PDF

Development of a Numerical Analysis Method for the Outage Cost Assessment at Load Points (부하지점별 공급지장비추정을 위한 수치해석적 방법의 개발)

  • Choi, Jae-Seok;Kim, Hong-Sik;Moon, Seung-Pil;Kang, Jin-Jong;Kim, Ho-Yong;Park, Dong-Wook
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.549-557
    • /
    • 2000
  • This study proposes a new numerical analysis method for assessing the outage cost of the composite power system with considering transmission system at load points. The proposed method comes from combination of the expected energy not served curve(EENSC) with the marginal outage cost function obtained at load points. Uncertainty of the outages of the generation and transmission systems was also included in this study. This study can be categorized into three processing parts as like as follows. Firstly, EENSC at load points was developed newly from the composite power system effective load duration curve which has been proposed by the authors. Secondly, this study proposes a new technical method for determining the coefficients of the marginal outage cost functions at load points in the composite power system(Generation and Transmission systems). It is a main key point that the mathematical expression for the marginal outage cost function at a load point is formulated and evaluated using relations between the GNP (or GDP) and the electrical energy demand at the load pint. Finally, the outage cost was calculated in this paper by combining the proposed EENSC with the marginal outage cost function evaluated at each load point. It is another important feature that the average costs for future at load points can be forescasted using the proposed approach. The effectiveness of the proposed new approach is demonstrated by the case studies with the IEEE-RTS.

  • PDF

Modeling Generators Maintenance Outage Based on the Probabilistic Method (발전기 보수정지를 고려한 확률적 발전모델링)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.804-806
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are new iy defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

  • PDF