• Title/Summary/Keyword: optimum plan

Search Result 341, Processing Time 0.029 seconds

Requirement of Track Maintenance Plan Support System (궤도유지보수작업계획수립지원 시스템의 요구조건)

  • Lee Jee-Ha;Hwang Sung-Ho;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.886-891
    • /
    • 2004
  • The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we made a survey of the state-of-art of decision-making support systems for track maintenance which were developed and used abroad and reviewed requirements of system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.

  • PDF

To examine the construction plan of the lightening rod equipment for the J-booster pumping station in and around KEPCO'a high voltage distribution power line (한전 배전선로 주변에 위치한 J가압장의 피뢰설비 구축방안 검토)

  • Hong, Sung-Taek;Lee, Eun-Chun;Shin, Gang-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.293-295
    • /
    • 2003
  • KEPCO's high voltage distribution power line laid under the ground near to the J-booster pumping station that supply water for living. Lightening rod equipment does not installed at the J-booster pumping station because KEPCO's over head ground wire for protection functions as a lightening rod equipment. In this study, it is concerned whether KEPCO's over head ground wire for protect the distribution power line affect to the J-booster pumping station which is installed for reduce the damage from the direct and indirect lightening. If KEPCO's protection area does not affect to the J-pumping station, it is plan to examine the construction method of lightening rod protection angle and lightening rod equipment and to suggest the optimum protection plan using the surrounding structure based on the suitability of protection area.

  • PDF

A Study on Establishment and Control of the Quality Control Policy (품질관리 방침의 설정과 관리에 관한 소고)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.35-43
    • /
    • 1985
  • In this paper we will concentrate on the Quality Control Policy which should be enforced as a part of the Total Quality Control considers the global concepts, the establishment Procedures, and the evolution and operation of Quality control policy to achieve effectively it. For enforcement of the Qualify control policy shall be focused for considerations : (1) suggestion of the optimum control policy (2) suggestion of a comprehensive plan and promoting method quality control (3) suggestion of matters that need special consideration at the time of decision of a comprehensive management of control policy thereof. (4) A comprehensive Proposal (5) suggestion of a plan for progress of the Quality control system and the supplementary plan In the future, accordingly, establishment d its own policy control level is desirably more reasonable, and the Total Quality Control System that employes the control efficiency of periodical and systematic and rationalization and radical reform of the enterprise management problem as the restrictive conditions must be applied for quality control system.

  • PDF

Optimum Simple Step-Stress Accelerated Life Tests Under Periodic Observation

  • Bai, Do-Sun;Kim, Myung-Soo;Lee, Sang-Hyuk
    • Journal of the Korean Statistical Society
    • /
    • v.18 no.2
    • /
    • pp.125-134
    • /
    • 1989
  • This paper presents optimum simple step-stress accelerated life test plans for the case where the test process is observed periodically at intervals of the same length. Two types of failure data, periodically observed complete data and periodically observed censored data, are considered. An exponential life distribution with a mean that is a log-linear function of stress, and a cumulative exposure model for the effect of changing stress are assumed. For each type of data, the optimum test plan which minimizes the asymptotic variance of the maximum likelihood estimator of the mean life at a design stress is obtained and its behaviors are studied.

  • PDF

Design of Emergency Spillway Using Hydraulic and Numerical Model - ImHa Multipurpose Dam (수리모형실험과 수치모의를 이용한 비상여수로 설계-임하댐)

  • Jeon, Tae-Myoung;Kim, Hyung-Il;Park, Hyung-Seop;Baek, Un-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1726-1731
    • /
    • 2006
  • Hydraulic and numerical models were applied to design the emergency spillway of ImHa multipurpose Dam. For the numerical model, FLOW-3D was used to evaluate the three-dimensional flow in the spillway. The results of hydraulic model were compared with those of the numerical model which were separated into four zones such as approaching zone, weir zone, transition & tunnel chute zone, and dissipator zone. Moreover, for optimum design of the spillway, the hydraulic and numerical models were performed for the basic plan. Solving the problems of the basic plan, the optimized alternative design was proposed. The numerical models for various conditions of the spillway were performed, which is not always feasible in the hydraulic models. Verified by using the hydraulic models, the optimum alternative design was proposed.

  • PDF

Optimal assessment and location of tuned mass dampers for seismic response control of a plan-asymmetrical building

  • Desu, Nagendra Babu;Dutta, Anjan;Deb, S.K.
    • Structural Engineering and Mechanics
    • /
    • v.26 no.4
    • /
    • pp.459-477
    • /
    • 2007
  • A bi-directional tuned mass damper (BTMD) in which a mass connected by two translational springs and two viscous dampers in two orthogonal directions has been introduced to control coupled lateral and torsional vibrations of asymmetric building. An efficient control strategy has been presented in this context to control displacements as well as acceleration responses of asymmetric buildings having asymmetry in both plan and elevation. The building is idealized as a simplified 3D model with two translational and a rotational degrees of freedom for each floor. The principles of rigid body transformation have been incorporated to account for eccentricity between center of mass and center of rigidity. The effective and robust design of BTMD for controlling the vibrations in structures has been presented. The redundancy of optimum design has been checked. Non dominated sorting genetic algorithm (NSGA) has been used for tuning optimum stages and locations of BTMDs and its parameters for control of vibration of seismically excited buildings. The optimal locations have been observed to be reasonably compact and practically implementable.

The Preliminary Design Guideline for Tall Building: Exploration of Planning Factors & Building Factors

  • Choi, Yong Sun
    • Architectural research
    • /
    • v.4 no.1
    • /
    • pp.1-6
    • /
    • 2002
  • Every year new tall buildings are being conceived, designed, and built with new schemes. Thus it is important to explore the factors that affect tall building design. Thus it is important to explore the tall building design factors. The planning and design of tall buildings require different criteria than those that exist in regular size buildings. Tall buildings are uniquely expressed by their structural systems where exterior esthetic and requirements of space drive the form and composition of the structural systems. Therefore the exploration of design factors is the key to achieve optimum building systems. Optimization as mentioned here is associated with the efficiency of the different building systems. To achieve an optimal system, there is a need for an understanding of the factors that affect on overall tall building design such as planning module, building function, lease span, floor-to-floor-height, building height (aspect ratio), structural system, environmental systems. In this paper a statistical approach will be used and will be based on data collected from the practice through a rigorous survey taken. This information is tabulated and analyzed. The major target of investigation will be lease span related to space requirement in the tall building planning. Factors related to lease spans, such as function, floor-to-floor height, planning module, building height, overall plan dimension, and plan ratio (building geometry), will be looked at carefully. IN conclusion, this approach of optimization can introduce a preliminary design guideline for tall building projects. The purpose of the paper should shed some light on the optimum tall building design criteria.

A Study on the Application of GIS and AHP for the Optimization of Route Selection

  • Lee, Hyung-Seok;Yun, Hee-Cheon;Kang, Joon-Mook
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.95-101
    • /
    • 2001
  • In a route plan, the route selection is a complicated problem to consider the spatial distribution and influence through overall related data and objective analysis on the social, economic and technical condition. The developed system in this study was compared and estimated by deciding a practical section for its validity and efficiency. Using Geographic Information System (GIS), the various information required for route selections in database was constructed, the characteristics of subject area by executing three-dimensional terrain analysis was grasped effectively, and the control point through buffering, overlay and location operation was extracted. An optimum route was selected by calculating the sum of alternatives to the sub-criteria weight, and from this result, there is a difference between real route and proposed route according to the prioritization of decision criteria based on the importance. This research could be constructed and applied geospatial information to the reasonable route plan and an optimum route selection efficiently using GIS. Therefore, the applications are presented by applying Analytic Hierarchy Process (AHP) to the decision-making of information needed in route selection.

  • PDF

Extending torsional balance concept for one and two way asymmetric structures with viscous dampers

  • Amir Shahmohammadian;Mohammad Reza Mansoori;Mir Hamid Hosseini;Negar Lotfabadi Bidgoli
    • Earthquakes and Structures
    • /
    • v.25 no.6
    • /
    • pp.417-427
    • /
    • 2023
  • If the center of mass and center of stiffness or strength of a structure plan do not coincide, the structure is considered asymmetric. During an earthquake, in addition to lateral vibration, the structure experiences torsional vibration as well. Lateraltorsional coupling in asymmetric structures in the plan will increase lateral displacement at the ends of the structure plan and, as a result, uneven deformation demand in seismically resistant frames. The demand for displacement in resistant frames depends on the magnitude of transitional displacement to rotational displacement in the plan and the correlation between these two. With regard to the inability to eliminate the asymmetrical condition due to various reasons, such as architectural issues, this study has attempted to use supplemental viscous dampers to decrease the correlation between lateral and torsional acceleration or displacement in the plan. This results in an almost even demand for lateral deformation and acceleration of seismic resistant frames. On this basis, using the concept of Torsional Balance, adequate distribution of viscous dampers for the decrease of this correlation was determined by transferring the "Empirical Center of Balance" (ECB) to the geometrical center of the structure plan and thus obtaining an equal mean square value of displacement and acceleration of the plan edges. This study analyzed stiff and flexible torsional structures with one-way and two-way mass asymmetry in the Opensees software. By implementing the Particle Swarm Optimization (PSO) algorithm, the optimum formation of dampers for controlling lateral displacement and acceleration is determined. The results indicate that with the appropriate distribution of viscous dampers, not only does the lateral displacement and acceleration of structure edges decrease but the lateral displacement or acceleration of the structure edges also become equal. It is also observed that the optimized center of viscous dampers for control of displacement and acceleration of structure depends on the amount of mass eccentricity, the ratio of uncoupled torsional-to-lateral frequency, and the amount of supplemental damping ratio. Accordingly, distributions of viscous dampers in the structure plan are presented to control the structure's torsion based on the parameters mentioned.

A Study on the Productivity Improvement of the Dicing Blade Production Process (다이싱 블레이드 제조공정의 생산성향상에 관한 연구)

  • Mun, Jung-Su;Park, Soo-Yong;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.147-155
    • /
    • 2016
  • Industry 4.0's goal is the 'Smart Factory' that integrates and controls production process, procurement, distribution and service based on the fundamental technology such as internet of the things, cyber physical system, sensor, etc. Basic requirement for successful promotion of this Industry 4.0 is the large supply of semiconductor. However, company I who produces dicing blades has difficulty to meet the increasing demand and has hard time to increase revenue because its raw material includes high price diamond, and requires very complex and sensitive process for production. Therefore, this study is focused on understanding the problems and presenting optimal plan to increase productivity of dicing blade manufacturing processes. We carried out a study as follows to accomplish the above purposes. First, previous researches were investigated. Second, the bottlenecks in manufacturing processes were identified using simulation tool (Arena 14.3). Third, we calculate investment amount according to added equipments purchase and perform economic analysis according to cost and sales increase. Finally, we derive optimum plan for productivity improvement and analyze its expected effect. To summarize these results as follows : First, daily average blade production volume can be increased two times from 60 ea. to 120 ea. by performing mixing job in the day before. Second, work flow can be smoother due to reduced waiting time if more machines are added to improve setting process. It was found that average waiting time of 23 minutes can be reduced to around 9 minutes from current process. Third, it was found through simulation that the whole processing line can compose smoother production line by performing mixing process in advance, and add setting and sintering machines. In the course of this study, it was found that adding more machines to reduce waiting time is not the best alternative.