Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

What is the Optimal Contraction Intensity and Duration in the Performance of Relaxation Techniques for Maximal Increase of Range of Motion? (관절가동범위 증진을 위한 이완 기법의 적절한 수축강도와 수축시간은?)

  • Shin, Seung-Sub
    • PNF and Movement
    • /
    • v.14 no.1
    • /
    • pp.59-65
    • /
    • 2016
  • Purpose: The purpose of this study was to review articles in order to establish optimal contraction intensity and duration in the performance of relaxation techniques for maximal increase in range of motion. Methods: The Cochrane, EBSCO, Embase, Medline, ProQuest, PubMed, ScienceDirect, and Scopus databases were used to search articles from 1990 to January 2016. The search terms were "contract relax," "hold relax," "muscle energy technique (MET)," and "proprioceptive neuromuscular facilitation (PNF) stretching." Only experimental human studies (randomized controlled trials) that compared the effects of varying intensity and duration of isometric contraction were included. Non-English language and unpublished studies were excluded. Results: A total of 2,156 articles were initially identified, with only five eventually meeting the inclusion and exclusion criteria. Three studies compared the effects of varying intensity in isometric contraction and two studies compared the effects of varying duration in isometric contraction with regard to range of motion (ROM). Two articles suggested that submaximal voluntary isometric contraction was more effective than maximum voluntary isometric contraction (MVIC) in the improvement of ROM. One article showed that a longer contraction time led to greater increases in ROM. Conclusion: Submaximal voluntary isometric contraction was recommended during contract-relax exercises in healthy people. Lack of evidence makes it difficult to suggest the optimal duration of isometric contraction during relaxation techniques. For future research, high-quality evidence will be needed to establish the optimal contraction intensity for maximum improvement of ROM.

OPTIMAL UNEMPLOYMENT INSURANCE BENEFIT STRUCTURE

  • Yun, Jungyoll
    • Journal of Labour Economics
    • /
    • v.23 no.2
    • /
    • pp.39-59
    • /
    • 2000
  • Given the constraint that the unemployment benefit is not allowed to vary freely over the unemployment duration, this paper examines the optimal UI benefit structure. In particular, identifying the conflicting effects of benefit amount and benefit duration upon incentive and insurance, this paper characterizes the optimal combination of UI benefit amount and duration. Based upon some important factors determining the optimal UI benefit structure that are derived from the model, a set of directions for UI reform in Korea have been proposed.

  • PDF

Optimal Routing of Distribution Network Considering Reliability Indices (신뢰도 지수를 고려한 배전계통의 최적 전력전송경로 결정)

  • 신동환;노병권;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.9
    • /
    • pp.1073-1080
    • /
    • 1999
  • Optimal routing of distribution networks can be attained by keeping the line power capacity limit to handle load requirements, acceptable voltage at customer loads, and the reliability indices such as SAIFI, SAIDI, CAIDI, and ASAI limits. This method is composed of optimal loss reduction and optimal reliability cost reduction. The former is solved relating to the conductor resistance of all alternative routes, and the latter is solved relating to the failure rate and duration of each alternative route. The routing considering optimal loss only and both optimal loss and optimal reliability cost are compared in this paper. The case studies with 10 and 24 bus distribution networks showed that reliability cost should be considered as well as loss reduction to achieve the optimal routing in the distribution networks.

  • PDF

Wireless Energy-Harvesting Cognitive Radio with Feature Detectors

  • Gao, Yan;Chen, Yunfei;Xie, Zhibin;Hu, Guobing
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.10
    • /
    • pp.4625-4641
    • /
    • 2016
  • The performances of two commonly used feature detectors for wireless energy-harvesting cognitive radio systems are compared with the energy detector under energy causality and collision constraints. The optimal sensing duration is obtained by analyzing the effect of the detection threshold on the average throughput and collision probability. Numerical examples show that the covariance detector has the optimal sensing duration depending on an appropriate choice of the detection threshold, but no optimal sensing duration exists for the ratio of average energy to minimum eigenvalue detector.

Measuring Expected Meal Duration for Restaurant Revenue Management (레스토랑 수익 관리를 위한 적정 식사 시간 측정에 관한 연구)

  • Cho, Mee-Hee;Lee, Kyung-Hee
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.19 no.2
    • /
    • pp.278-286
    • /
    • 2009
  • Restaurants have two strategic levers for revenue management: duration control and demand-based pricing. Reducing dining times, especially during peak periods, can add considerable revenue for restaurants. Managing meal duration, however, can be far more complex than manipulating the price. This paper examines dining duration expectations for restaurants types(Family, Korean, Quick service restaurant), customers characteristics(gender, age, occupation, meal period, visiting frequency, dining occasion, dining companions) using an a adaptation of a price sensitivity measurement tool, naming it 'Time Sensitivity measurement tool' or TSM. The TSM is then used to derive the optimal time points, and the range of acceptable times. The results demonstrate that there is a relatively wide spread of acceptable dining duration times in family restaurant. Furthermore, the optimal time points was shorter than the mean expected dining times, which suggests that many restaurants may be able to shorten dining duration without compromising customer satisfaction. The paper explores whether demographic and dining variables have an impact on time preferences, and finds whether gender, age, meal periods, visiting frequency, and dining companion effects are significant. Specifically, women in their thirties tended to prefer a significantly longer dining times for dinner.

  • PDF

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model (이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구)

  • Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF